Cable Standard DIN VDE 0282 part 810, IEC 245 & BS 6007, BS 6899 Silent Features - Temperature range -40�° to +90�° - Exceptional long term performance - Excellent Impact Resistant - Excellent Weather Resistant Technical Data Operating Temp : -20�°c to Max.+90�°C Nominal Voltage : 1.1 KV Test Voltage : 3.0 KV Min. Bending Radius : 6 x Cable Diameter Standard Packing Coils 100, 200,300, 500, 1000m Conductor Flexible Bare Bunch Copper as per IS:8130, IEC 60228 Insulation EPR Rubber Outer Sheath EPR Rubber Core Color 3C - Red, Yellow, Blue, Or Black, Blue, Brown 4C- Red, Yellow, Blue, Black Or Black, Blue, Brown, Green or Yellow/Green Application Ideal For Irrigation Pumps, Drinking Water Supply Pumps, Submersible Pump Motor Power Supply.
Cable Standard Generally conforms to, Based on IS:9857-1990 VDE 0282, IEC 245-6, BS 6899 Silent Features - Ultra high performance flexible welding lead, double insulated for longer life and added safety - Better flame retardant properties - Outstanding toughness & durability - High resistance to cuts, tears & abrasion - Resistance to oil, solvents and chemicals - Excellent ozone and weather resistant Technical Data Fixed Installation : -20C to max.+90C Nominal Voltage : 600 V Spark Test : 3.5 KV(ac) Color : Orange / Black Jacket Min. Bending Radius : 6 x Cable Diameter Standard Packing Coils 100, 200, 300 and 500m Conductor High conductivity, bare annealed copper flexible conductor, EC copper class 5 & class 6 generally conforms to IS:8130-1984, IEC 60228 Separation Polyester tape Insulation Double Insulated/single insulated flexible Nitrile rubber HOFR insulated as per IS:6380-1984 Color Orange / Black Jacket Current Rating The maximum current ratings of flexible welding cables for different duly cycles are based on an ambient air temperature of 25 C and a maximum conductor temperature of 90 C. The percentage duly cycles for various processes and applications are as follows: - Automobile Welding : up to 100% - Semi Automatic Welding : 30% to 85% - Manual Welding : 0% to 60% - Very intermittent or Occasional Welding : up to 20% Voltage Drop When total cable lengths in excess of 15mtr., are involved, it may be necessary to use cables of larger cross section to ensure that the voltage drop is not excessive & welding currents are maintained at adequate levels. Application Designed for the secondary (high current) connection to automatic or hand - held metal arc welding electrodes. It is suitable for flexible use under rugged conditions, on assembly lines & conveyor systems, in machine tool and automatically operated line & spot welding machines
Electrical Characteristics - Rated Voltage : 0.6/1 kV AC - Rated DC Voltage : 1.5 kV - Maximum Permitted DC Voltage : 1.8 kV (conductor/conductor, non earthen system, circuit not under load) - Maximum Permitted AC Voltage : 1 KV - Working Voltage : DC 1000 V - Spark Test : 6000 V. ac (8400 Vdc) - Voltage Withstand : 6500 V as per EN50395 for 5 min - Ampacity : According to requirements for cables for PV systems Technical Data - Ambient Temperature : -40C +90C - Minimum Bending Radius : 5 x OD (fixed), 15 x OD (occasional flexing) - Flame retardant according to IEC 60332-1-2 - Low smoke emission < 20% as per ASTM D-2843 - Halogen free according to EN 50267-2-1/-2, IEC 60754-2 - Maximum Temperature at Conductor : 120C (20000h) - Short Circuit Temperature : 200�?�°C (at conductor max. 5sec) - Thermal Endurance Test : According to EN 60216-2 (temperature index +120C) - High Temperature Pressure : Test according to EN 60811-3-1 - Excellent mechanical and electrical properties. - UV resistance & OZONE resistance - Flexibility & suitability for fast & easy installation Cable Standard EN 50618 Standard Packing Coils 100, 200,300, 500, 1000m Conductor Flexible Electrolytic fine Tinned copper class-5 conductor according to IEC 60228 Insulation XLPO (Crosslinked Halogen Free & Flame Retardant) Sheath XLPO (Crosslinked Halogen Free & Flame Retardant) Color Red, Black and also available black color with red lining. Application For Solar Panel, Solar Power Plant, Solar Pump Installation.
Cable Standard BS:5308 (172) IEC 189 (1&2) Silent Features - Wear & Tear Resistance - Long Life - Easy to Cable Slitting - Fire Resistance Technical Data Working Temp : 70C / 90C / 105C as per Insulation Nominal Voltage : 300/500 V Application To Transmit signals from Field Instruments to Control Penal with No. disturbance. A.C. drive application Standard Packing Coils 100, 200, 500 & 1000m Conductor Annealed Plain Bare Copper or Tinned Copper As per IEC 60228 Insulation PVC/ XLPE/ PE/ LSZH/ EPR Sheath PVC/ Rubber/ LSZH/ FRLS Type Armoured or Unarmoured. Elements Insulated core/Pairs / Tried / Quads Color / multi core cable number marking on core Shield Aluminum mylar tape screen with tinned copper drain wire individual shielding or Overall Shielding Braiding Tinned copper braiding as per requirement Application To Transmit signals from Field Instruments to Control Penal with No. disturbance. A.C. drive application
Common rail injector Fuel Injection 0445120126 for Kobelco Excavator SK130-8 SK140-8 0445 120 265 0445 120 247 0445 120 059 0445 110 585 0445 120 266 0445 120 397 0445 120 224 0445 120 170 0445 120 304 0445120277 0445 120 078 0445 120 123 0445120397 0445 120 081 0445 120 244 0445 120 150 0445 120 289 0 445 120 078 0445 120 215 0445 120 304 0445 120 329 0445 120 213 0445 120 130 0445 120 329 0445 110 660 0 445 120 357 0445 120 221 0445 120 212 0445 110 461
FOB ROTTERDAM & FOB HOUSTON NON-SANCTIONED ORIGIN FUEL PRODUCT JET FUEL A1 EN590 10PPM TRIAL QTY 2,000,000 BBL 100,000 MT CONTRACT (MAX/M X 12M) 8,000,000 BBL 800,000 MT PRICE US$88 PER BBL US$570 PER MT NON-NEGOTIABLE PROCEDURE FOR FOB TANK TO TANK (ACTIVE TSR) 1. The buyer issue ICPO with his international passport copy (data page), CIS and company license to the seller. 2. The seller issue commercial invoice (CI) for the available quantity in seller storage tank to the buyer, buyer endorse commercial invoice and return the CI with buyer signed tank storage agreement. 3. Seller proceeds to verify the buyer's tank storage agreement to ensure seller approval of the tank storage agreement through ATV, NCNDA/IMFPA signed and seal by all intermediaries connected in the transaction. 4. The seller issues the partial pop documents as below and sends to the buyer. a. Commitment to supply b. Certificate of origin c. Authorization to verify (ATV) d. Tank to tank injection agreement (TTTIA) e. Unconditional DTA f. Fresh SGS (not older than 48 hours) g. Tank storage agreement (TSR) h. ATS- authorization to sell and collect i. Injection report 5. The buyer conduct's DIP test in the seller reservoir and provides tank details to the seller, to commence injection of product into the buyer's tank. 6. Within twenty-four (24) hours, buyer issues 100% TT wire transfer payment to the seller, the seller transfers the title ownership to the buyer. 7. Serious direct buyers only, Please Available 24/7
AVIATION FUEL JET A1 LIFT ABLE QUANTITY FOB Minimum Quantity 500,000 Barrels per Month Maximum Quantity 10,000,000 Barrels Lift able FOB Price Gross USD 72 Net USD 68 Per Barrels FOB Rotterdam, Houston, Jurong, Fujairah Ports Commissions USD 4; USD 2 Seller side per Barrel USD 2 Buyer side per Barrel Payable by Seller A TTT/TTV Vopak and other Tier 1 Storage 1 Buyer issues ICPO incorporated with Sellers working procedures Buyers banking details company registration certificate Buyers Passport alongside CPA/TSA 2 Seller issues Commercial Invoice Buyer Buyer signs and return Commercial Invoice alongside the NCNDA/IMFPA endorsed by intermediaries within 48 hours 3 Seller issues a copy of ATV from world renowned tank storage companies VTTI VOPAK KOOLE SVNT etc for Buyer to contact and obtain visit approval for physical inspection of product and dip test at Buyers expense 4 Upon successful verification of product in Sellers tank there will be a schedule for injection programming of fuel into Buyers nominated vessel/tank 5 Upon successful completion of injection Buyer makes payment for the total value of product injected via TT wire MT103 6 Seller confirms payment and transfers Product Title alongside full POP documents to Buyer and pays commission to intermediaries as per NCNDAIMFPA 7 With 5 banking days Seller and Buyer companies negotiates for subsequent monthly shipments continue as per terms and conditions of contract between companies B TTO Vopak and other Tier 1 Storage 1 Buyer issues ICPO incorporated with Sellers working procedures Buyers banking details company registration certificate and Buyers Passport 2 Seller issues Commercial Invoice to Buyer, Buyer signs and return Commercial Invoice alongside the NCNDAIMFPA endorsed by intermediaries within 48 hours 3 Seller issues a copy of ATV from a world-renowned tank storage companies VTTI VOPAK KOOLE SVNT etc for Buyer to contact and obtain visit approval for physical inspection of product and DIP TEST at Buyers expense 4 Buyer receives official scheduled invitation date and appointment time from Sellers tank to carry out physical verification of product 5 Upon completion of successful the physical verification process Buyer takes over Sellers tank by making payment for the total value of product injected via TT wire MT103 6 Seller confirms payment and transfers Product Title alongside full POP documents to Buyer and pays commission to intermediaries as per NCNDAIMFPA 7 With 5 banking days Seller and Buyer companies negotiates for subsequent monthly shipments continue as per terms and conditions of contract between companies Please lock these deals down today
PRODUCTS PRICES AND LIFT ABLE QUANTITIES (FOB) - VOPAK TERMINALS. AVIATION FUEL: JET -A1 LIFT ABLE QUANTITY FOB: Minimum Quantity: 500,000 Barrels per Month, Maximum Quantity: 2,000,000 Barrels Lift able. FOB Price: Gross USD $76.00 / Net USD $74.00, Per Barrels, FOB Rotterdam | Houston / Jurong & Fujairah Ports Commissions: $2, Seller side - $ 1.00 per Barrel / Buyer side - $ 1.00 per Barrel, Payable by Seller. FOB TRANSACTION PROCEDURE FOB VOPAK TERMINALS DIP & PAY 1. Buyer Sends CIS and ICPO of their purchasing product to Seller for verification and processing: 2. Seller submit buyer files to Vopak Terminal Manager. 3. Vopak Terminal Manager send Vopak Agreement to buyer through Seller. Buyer within 48 hours sign and return the Vopak Agreement through Seller. 4. Buyer finalizes the Vopak Terminal Protocols cost through the supplier with the Vopak Terminal Manager, and obtain the following and submit the same to Seller as listed below. o VopakBarcode o VopakRegistrationinformation. o VopakReferenceCode. 4b. Format of Authorization Form to accompany the information LETTER OF AUTHORIZATION: We, (Buyer Name), with registered Office, at (Address). represented by Mr. ________________, with Passport number ________________. Owner of Barcode code at Royal Vopak Rotterdam, with contract reference number: _____________. NB: Immediately buyer complete the above process and receive Vopak Reference through Vopak Terminal Manager, buyer will have access to communicate directly to Vopak Management with the help of the Reference code assigned to the buyer. 5. Seller, sends Cl for Buyer's endorsement. Buyer signs the CI and retune back within 24 hours of receiving alongside side with Sign Letter of Authorization. 6. Seller issue Buyer Full POP documents along with fresh SGS (Not less than 48 hours, one-time official confirmation mail from SGS official). Fresh SGS Report or Saybolt (Not later than 24 72 hours) Tank Storage Receipt (TSR) with GPS Coordinates of where the Tanks/Vessel are located. Injection Report Agreement Authorization to Sell Authorization to verify the product in the tank (ATV) Country Certificate of Origin Approved Dip Test Authorization (DTA Availability of Product, Commitment to Supply, 7. After verification of full POP by buyer, injection begins. 8. Upon completing the Injection, seller transfers title to buyer. 9. Buyer makes full payment after via MT103.
PRODUCTS PRICES AND LIFT ABLE QUANTITIES (FOB) - VOPAK TERMINALS. DIESEL OIL EN590 -10PPM LIFT ABLE QUANTITY FOB: Minimum Quantity: 40,000 Metric Tons per Month, Maximum Quantity: 300,000 Metric Tons Lift able. FOB Price: Gross USD $430.00MT / Net USD $420.00MT, FOB Rotterdam |Jurong & Fujairah Ports Commissions: $10, Seller side - $ 5.00 per Metric Tons / Buyer side - $ 5.00 per Metric Tons, Payable by Seller FOB TRANSACTION PROCEDURE FOB VOPAK TERMINALS DIP & PAY A. TTT/TTV (Vopak and other Tier 1 Storage) 1. Buyer issues ICPO incorporated with Seller's working procedures, Buyer's banking details, company registration certificate, Buyer�??s Passport alongside CPA/TSA. 2. Seller issues Commercial Invoice Buyer, Buyer signs and return Commercial Invoice alongside the NCNDA/IMFPA endorsed by intermediaries within 48 hours. 3. Seller issues a copy of ATV from world renowned tank storage companies (VTTI, VOPAK, KOOLE, SVNT etc) for Buyer to contact and obtain visit approval for physical inspection of product and dip test at Buyer�??s expense. 4. Upon successful verification of product in Seller�??s tank, there will be a schedule for injection programming of fuel into Buyer�??s nominated vessel/tank. 5. Upon successful completion of injection, Buyer makes payment for the total value of product injected via TT wire MT103. 6. Seller confirms payment and transfers Product Title alongside full POP documents to Buyer and pays commission to intermediaries as per NCNDA/IMFPA. 7. With 5 banking days, Seller and Buyer companies negotiates for subsequent monthly shipments continue as per terms and conditions of contract between companies. B. TTO (Vopak and other Tier 1 Storage) 1. Buyer issues ICPO incorporated with Seller's working procedures, Buyer's banking details, company registration certificate and Buyer�??s Passport 2. Seller issues Commercial Invoice to Buyer, Buyer signs and return Commercial Invoice alongside the NCNDA/IMFPA endorsed by intermediaries within 48 hours. 3. Seller issues a copy of ATV from a world-renowned tank storage companies (VTTI, VOPAK, KOOLE, SVNT etc.) for Buyer to contact and obtain visit approval for physical inspection of product and DIP TEST at Buyer�??s expense. 4. Buyer receives official scheduled invitation date and appointment time from Seller�??s tank to carry out physical verification of product. 5. Upon completion of successful the physical verification process, Buyer takes over Seller�??s tank by making payment for the total value of product injected via TT wire MT103. 6. Seller confirms payment and transfers Product Title alongside full POP documents to Buyer and pays commission to intermediaries as per NCNDA/IMFPA. 7. With 5 banking days, Seller and Buyer companies negotiates for subsequent monthly shipments continue as per terms and conditions of contract between companies.
Cat 326-4700 E320d Excavator Parts C6.4 Fuel Injector 3264700 WUHAN HUACUMDA MACHINERY CO.,LTD Huacumda,Specialized in supplying Cummins,Komatsu,Hyundai,Yanmar Diesel Engine Assy and Engine Spare Parts. Products Including: Engine Assy: B,C,L series,QSB series, QSL series, ISDe series K19,K38,K50,NTA855,QSX15 ....Etc. Engine Spare Parts: Cylinder Block,Head,Crankshaft,Camshaft Piston kit,Gasket kit Connecting Rod Fuel pump,Injector,Water Pump Air compressor, Alternator, Start Motor ...Etc. Delivery Terms: 1)More stock for sale 2)Parcel will be sent in 24 hours after payment , by DHL,FEDEX,UPS. 3)More order, More discount Contact for more details Email: sale002@juntu.biz Cell/Whatsapp:86-13339858813 Wechat/Skype:13339858813 www.huacumda.com
New and remanufactured units available
Engine Type - V8 / DOHC / 32 valves / 4 Valves per Cylinder Displacement - 5.6L Bore x Stroke - 96 x 96 mm (3.78 x 3.78 in) Prop Shaft Horsepower - 425hp at 5500 RPM Full Throttle RPM Range - 5000 - 6000 RPM Alternator Output at W.O.T. - 90 Amp Gross, Max Compression Ratio - 12.2:1 Fuel Induction System - Direct Injection / Up to 2900 PSI Weight* - 432 kg (952 lbs) / 443 kg (977 lbs) / 453 kg (999 lbs) Recommended Fuel - Octane 89 Recommended Engine Oil - Yamalube�® 4M (See owner's manual) Recommended Fuel Filtration - Yamaha 10-Micron Fuel / Water Separating Filter (external) C.A.R.B. Rating - 3-Star Exhaust - Through Propeller (Except in Reverse Under 2500 RPM) Intake - 32 Ignition - TCI Microcomputer Spark Plug - ILMAR7E-9 / Iridium Alternator Output - 90 Amps Gross, Max Starting System - Electric w/ PTT Lubrication - Wet Sump Engine Oil Capacity - 7.8L / 8.2 Quarts | 7.5L / 7.9 Quarts Recommended Cooling - Thermostatic Control Ethanol Blend Limit - 10% Maximum Gear Ratio - (25/14) 1.79 Gear Shift - Forward, Neutral, Reverse Shaft Length - 25" - 30" - 35"
FOB PROCEDURES (TTV / TTT) (JURONG, HOUSTON, ROTTERDAM, FUJAIRAH) WITH USDT 2MIL AS (UNDERTABLE WITH VERIFIED FRESH SGS NOT MORE THAN 48HOURS) 1. The Buyer issues the following documents to the Seller: â??(ICPO) Irrevocable Corporate Purchase Order, according to the seller's Procedures. â?? Company Profile and Company Registration Documents. â?? Client Information Sheet (CIS) â?? Bank Confirmation/Comfort Letter (BCL) â?? Passport of Owner/Director/Buyer. â?? Valid and Approved Chartered Party Agreement (CPA) or Tank Storage Agreement (TSA) 2. The Seller issues a Commercial Invoice (CI) for the product available in the tanks at the port for the Buyer's assessment and acceptance. At the same time, the Seller will provide an NCNDA/IMFPA to the Buyer for completion. 3. The Buyer signs and returns the Commercial Invoice (CI), together with an acceptance letter of commitment to complete the transaction and the completed NCNDA/IMFPA 4. Within 48 to 72 hours, the Seller verifies the Buyer's Chartered Party Agreement (CPA) / Tank Storage Agreement (TSA), and upon successful verification and confirmation of the Vessel's / Tank Storage validity and availability, the Seller provides the following documents Proof of Products. (POP) 1. Certificate of Origin of the Product 2. Copy of Fresh SGS Report not more then 48hours or equivalent 3. Copy of Injection report 4. Authorization to Sell and Collect (ATSC) 5.Physical Authorization to Verify (ATV) 6. Unconditional Dip Test Authorization (UDTA) 5. Buyer issue Q88/TTVIA, or TSR/TTIA, The Buyer conducts a Dip Test(OPTIONAL) of the product in the Seller's Tanks at the Buyers expense and upon a successful dip test QnQ is Verified , Not More then 72Hours Buyer make Full payment of the total cargo, and also Transfer USDT 2mil to Seller as (UNDERTABLE) and PAYS FOR EXTENSION TANK 2DAYS The Seller authorize the injection of the fuel into the Buyer's Vessel / Tank. 6. Within twenty-four (24) hours following the completion of the injection, the Seller transfers title to the Buyer 7. The Seller pays commission to all Mandates and Intermediaries according to the signed NCNDA/IMFPA that is involved in the transaction. The monthly shipment continues as per the terms and conditions of the Commercial Invoice / SPA, and the transaction gets extended by providing a 12-month contract to the Buyer and Seller. Price $680 with USDT $2,000,000 allocation is 100,000MT
Product: Virgin Fuel Oil (D6) Origin: Russian Federation MOQ Quantity: One Hundred Million (100,000,000) Gallons With R&e Into Yearly Contract CIF PRICE: US$0.88 GROSS / US$0.86 PER GAL FOB PRICE: US$0.84 GROSS / US$0.82 PER GAL Mark Up Or Over Price Not Allowed By The Refinery*** Freight On Board (fob) Transaction Procedure: 1. Buyer accepts sellers procedure and issues Irrevocable Corporate Purchase Order (ICPO) with Tank Storage Agreement (TSA if absent buyer extends Sellers Tank Storage with product for a minimum of five (5) business days), Banking details, company registration and Valid Passport Copy. 2. Seller conducts due diligence on buyer and issues Commercial Invoice agreement if buyer is approved. Buyer signs Commercial Invoice and returns to Seller for countersigning and endorsement. 3. Seller issues to Buyer the below Partial Proof of Product (PPOP) documents as endorsed: Refinery Commitment to Supply Certificate of Origin Authorization to Sell (ATS) Confirmation of Allocation Product Quality Passport (Analysis Test Report) Company Registration Certificate 4. Buyer requests for a Commitment Letter from its tank storage company to be signed by Buyer's Tank Storage Company (if absent Buyer extends Seller Tank Storage with product for a minimum of five (5) business days), Buyer then return a copy of the Commitment Letter to be signed and confirmed by the seller. 5. Seller issues Buyer Unconditional Dip-Test Authorization Letter to enable Buyer along with its SGS team conduct Dip-Test on Seller's Tanks with its Terminal Access Permit and Clearance to come into its tank facilities to conduct its Dip test and confirm product Quantity and Quality. 6. Seller issues full Proof of Product documents: Company Registration Certificate Tank Storage Receipt Fresh SGS Injection Report Change of Ownership Certificate Authorization to Sell and Collect Company Tax Payment Certificate 7. Signing of Non-Circumvention, Non-Disclosure Agreement (NCNDA)/Irrevocable Master Fee Protection Agreement (IMFPA)-for intermediary fees protection and legalization by all intermediaries.
Product Name: DONGFENG Fuel Injection Pump 3908568 Product Description: Mainly used for DONGFENG trucks, Parts Number: 3908568 Packaging Method: Wooden cases or Carton boxes or designed by customers' requirements. Delivery Method: By sea or by air or discussed with customers. Delivery Time: Within 10 workdays after receiving the deposit. Trade Term: EXW, FOB, CFR, CIF, DAF, etc. After-sales service: Response and provide satisfactory solutions within 24 hours. Our Advantages: Competitive Price ; Durable Quality ; On Time Delivery ; Excellent After-sales Service.
Denso, delphi, caterpillar, cummins, siemens. volvo, bosch, injection, fuel pump , injection parts, fuel pump spare parts..
Com-emc bosch fuel injection pump tester 1.Computer display 2.Test rpm, count, temperature, pressure, advance angle Com-emc bosch fuel injection pump tester >>>functions 1. Measurement of each cylinder¡¡¥s delivery at various rotation speeds; 2. Checking of each cylinder¡¡¥s injection time with static state; 3. Checking of the mechanical speed governors; 4. Checking of the electromagnetic valve of distributor pumps; 5. Checking of the pneumatic speed governors¡¡¥ positive pressure performance; 6. Checking of the pneumatic speed governor¡¡¥s vacuum performance; 7. Measurement of the reflux delivery of distributor pumps; 8. Measurement of the distributor pump¡¡¥s body internal pressure; 9. Checking of sealing of fuel injection pump body; 10. Measurement of the advance angle. >>>characteristics 1. Changing frequency changing rotation speed; 2. Low fall of rotation speed and high output torque; 3. High measurement precision; 4. The functions of over voltage, overload and short circuit protection; 5. Ten kinds of rotation speeds presetting; 6. Constant temperature controlled; 7. Ultra low noise; 8. Operating position: arbitrary side of the two work sides of the test stand; 9. Rotation speed, count, temperature, air pressure and advance angle are displayed on lcd; 10. Built-in air resource; 11. Data can be searched, printed(options). >>>technical parameters Adjustable rotation speed range 0~4000rpm Double series of graduates 45cc, 150cc Volume of oil tank 60l Temperature stabilization 40¡¨¤2¡ãc Test oil filtering unit 5|¨¬ Dc. Supply 12/24v Feed pressure 0~0.4mpa (low), 0~4mpa (high) Air pressure (mpa) 0~0.3 Rack travel range 0~25mm 3-phase power supply 380v/50hz or on request Flywheel inertia¡¡¥s moment 0.8kg¡¡èm2 Center height 125mm Output power 7.5kw, 11kw, 15kw, 18.5kw or on request Overall dimensions (mm) 2100¡¨¢960¡¨¢1750 Net weight (kg) 1000
Diesel fuel injection pump test benches, common rail system test bench and tools, nozzle tester, test benches accessories, test bench tools etc Diesel fuel injection pump test benches, common rail system test bench and tools, nozzle tester, test benches accessories, test bench tools etc
1.Imported international advanced technology,use original packing imported converter,the test stand has wide speed scope and good dynamic performance. 2.Direct output of main motor,start up with low voltage,save energy,small value of reduction of speed,high measurement accuracy,good reliability,and complete automatic protection function. 3.Clockwise or anticlockwise rotation speed is 0-4000r/min.It adopts WZ-I full-function digital controller and displays seven shifts preset of speed, rotate speed, count, fuel oil temperature. And equipped with systems such as air supply positive and negative pressure,VE pump inner pressure, reture oil amount, direct current electric power source and so on. It has full functions 4.Controlled by industry computer and equipped with digital display. It can be used normally even if the computer is not start. Its really reliable and high cost performance. 5.The computer in the test bench has large-scale data base,more than 2000 technical parameters of fuel pump can be referred easily.
Overall dimension