A tiny detail of the hydraulic check valve symbol direction is wrong, which put the hydraulic check valve manufacturer in a very difficult position, the factory is almost closed. There is a devil in the details. Whether you can grasp the devil of the hydraulic check valve symbol requires you to think every day, in addition to hydraulic check valve, hydraulic check valve, and still hydraulic check valve.
When I opened the mailbox, I saw the e-mail of Adair who we had known for 3 years. There was a habit with Adair. He purchases only one type of hydraulic valves from each one hydraulic valve manufacturer. We AAK HYDRAULIC VALVE has been his supplier for the hydraulic pressure valves. After reading the email, it was actually a proofing request for a hydraulic check valve, not a hydraulic pressure valve. It was a little abnormal. I thought he sent the wrong email.
I reminded him whether the e-mail was sent by mistake. He said bluntly that he would need 3 samples of the hydraulic check valve as soon as possible, according to the drawings in his email. Somehow, I always felt there was a problem somewhere, and I went to see the drawing of the hydraulic check valve. It is found that in the layout at the bottom of the drawing, the arrow direction on the hydraulic check valve symbol is reversed. For the hydraulic check valve symbol, the arrow direction is reversed, which is fatal. It seems that a designer is unlikely to make such a low-level mistake.
When the technical team got the drawing and started proofing, they called me. The hydraulic check valve symbol on the drawing seemed wrong. I'm glad they can also find that there is an objection to the hydraulic check valve symbol. I asked what they think of the hydraulic check valve symbol. They suggested making two sets of samples, one according to the hydraulic check valve symbol on the customer's drawing, and the other is for the hydraulic check valve symbol we understand.
When Adair received two sets of samples, he deliberately asked why they were two sets of samples. When we pointed out the details of the hydraulic check valve symbol, Adair began to tell me the devil's story of the hydraulic check valve symbol.
6 months ago, he sent his hydraulic valve manufacturer the drawing with this hydraulic check valve symbol, which was made by their chief designer overnight. The hydraulic valve manufacturer proofed according to this drawing. As a result, the hydraulic check valve sample was also approved at one time. The devil began to make trouble from this time. The 2,000 hydraulic check valves were produced and shipped to his customer. The customer is testing a new production line and needs to use these hydraulic check valves. After installation, there is a big problem in startup and commissioning. Because of the wrong direction, the medium returned, polluting the whole new production line, and directly causing a loss of more than 260,000 US dollars.
Brass Universal Check Valve BS 5154 Pressure Rating : PN-20 Material : Forged Brass Description : One Piece Body, Spring Loaded, Resilient Seated Ends : Screwed Female to BS:21 Specials : Suitable for Horizontal & Vertical Installation Item Code : FLB00048 Size : 15mm Notes : Available Valve Size : 15mm to 50mm
Forged Steel Check Valve BSEN ISO 15761, ASME B16.34 Pressure Rating : Class-800 Bore : Full & Regular Material : Forged Steel (A105) Description : Bolted Cover (Welded Cover for CL-1500 & 2500) Ends : Socket Weld, Butt Weld, Screwed Specials : LT & Cryo, Fire Safe, Seismic, IBR Item Code : FCS00012 Size : 15mm Notes : Available Valve Size : CLASS-800 8mm to 50mm CLASS-1500 15mm to 40mm CLASS-2500 15mm to 25mm Material : LF2, F5, F9, F11, F22, F304, F304L, F304H, F316, F316L, F316H, F91, F51, F321H, F321
Forged Steel Check Valve BSEN ISO 15761 Pressure Rating : Class-150 Material : Forged Steel (A105) Description : Bolted Cover Ends : Welded on Flanges Specials : LT & Cryo, Fire Safe, Seismic, IBR Item Code : FCS00035 Size : 15mm Notes : Available Valve Size : CLASS-150 15mm to 50mm CLASS-300 15mm to 50mm CLASS-600 15mm to 50mm Material : LF2, F5, F9, F11, F22, F304, F304L, F304H, F316, F316L, F316H, F91, F51, F321H, F321
He has done very well and occasionally inquires about the price with HYDRAULIC VALVE. For the hydraulic check valves purchased some time ago, the production director found that 20% of the hydraulic check valves have parameters that do not meet the standard, so they must get new qualified ones to the workshop within 20 days, otherwise the delivery of customer order would be delayed. Charles asked the original manufacturer of the hydraulic check valve to complete the replacement within 2 weeks. The manufacturer is willing to replenish, but the production can be started only after 15 days, that is to say, it will take 30 days to replenish. tried to find other suppliers of hydraulic check valves, and all replied that it could not be completed in such a short time. realized that something was going to happen and began to look for a new hydraulic valve manufacturer, contacting factories one by one. thought that had also participated in the quotation of this hydraulic check valve, and the samples provided also met the requirements, but it was not considered because the quotation of was slightly higher than that of other hydraulic valve manufacturers by 7%. sent us an e-mail to ask whether the quotation of hydraulic check valve offered 6 months ago can be maintained, and if we can finish an urgent order of 100 hydraulic check valves in 10-12 days. I felt that this should be an order for hydraulic check valve encountered with problem. told us the truth. About 20% of the hydraulic check valves produced by the original factory were unqualified and rejected by their production director. Now he must replenish them as soon as possible. General hydraulic valve manufacturers are unwilling to make such aftercare orders, but HYDRAULIC VALVE don't think so, because , as a production factory, has the same goal as the importer, that is to serve users well, so is more willing to help customers and solve complaints from users together. Fortunately, the corresponding materials are in stock. Combined with the 24-hour production line, our production director conservatively estimates that it can be completed in 12 days. asked us to start blanking now and the hydraulic check valve order will be issued tomorrow. After 10 days, 100 hydraulic check valves were successfully finished. was very happy and quickly air freighted these hydraulic check valves to the Thanks to the God, 100 hydraulic check valves finally arrived at their workshop in 20 days. informed us by email that their engineers installed, debugged and tested hydraulic check valves, which were all normal. The 7% higher price was also agreed by his owner. The owner was very amazed that can deliver so quickly and the quality was better than that of the original manufacturer.
a purchaser of in He is responsible for the procurement of hydraulic components. He has done an excellent job some time ago and has been praised by his supervisor for many times. Before the shopping season, he wanted to relax and planned to go on vacation with his family next week. A phone call from the owner disrupted all his plans. A major dealer in asked for help for a excavator produced by their company within 1 week . His engineer came to the user for routine maintenance and found that there was oil leakage in the hydraulic system. After pressure test, it was found that there was oil leakage in the hydraulic check valve, and 12 excavators had such faults. this hydraulic check valve, and got the reply that it was too cold in at this time. For such high frequency operation, even if the hydraulic check valve was replaced, it was estimated that the hydraulic check valve would still leak oil 1 week later. Unless more low temperature resistant sealing rings are used, this will take time to test, but the finishing time is to be determined. was so helpless, he had to find a new hydraulic valve supplier. asked several local hydraulic valve manufacturers. They either didn't have time to produce or require over 50pcs MOQ. After knowing these situations, the supervisor asked Daniel to give the dealer a plan that can be implemented within 10 days. had to cancel the vacation. thought of HYDRUALIC VALVE who he had contacted for inquiry before. He emailed us to ask whether we can produce the hydraulic check valve for the excavator, which needs to be resistant to low temperature. According to the drawings and working conditions provided by him, we advised that it takes 20 days to customize. All our existing hydraulic check valves are not close to this size. reiterated the hydraulic check valve needs to be low temperature resistant, and frankly told us what they are currently experiencing. I answered directly that the core lies in the low temperature resistant sealing ring. Daniel felt that maybe could solve this problem. After 18 days, we sent a sample of hydraulic check valve. The test results proved feeling. The parameters passed the test and there was no oil leakage at low temperature. The order for 12 hydraulic check valves was also easily confirmed. hanging heart can finally be put down. asked why hydraulic valve manufacturer needs time to be determined to test, and we solved it in 18 days. Why hydraulic valve manufacturer is unwilling to do this small quantities, but it is OK for hydraulic valve. At the same time, the price of hydraulic valve is cheaper than that made in and that made in the .