He has done very well and occasionally inquires about the price with HYDRAULIC VALVE. For the hydraulic check valves purchased some time ago, the production director found that 20% of the hydraulic check valves have parameters that do not meet the standard, so they must get new qualified ones to the workshop within 20 days, otherwise the delivery of customer order would be delayed. Charles asked the original manufacturer of the hydraulic check valve to complete the replacement within 2 weeks. The manufacturer is willing to replenish, but the production can be started only after 15 days, that is to say, it will take 30 days to replenish. tried to find other suppliers of hydraulic check valves, and all replied that it could not be completed in such a short time. realized that something was going to happen and began to look for a new hydraulic valve manufacturer, contacting factories one by one. thought that had also participated in the quotation of this hydraulic check valve, and the samples provided also met the requirements, but it was not considered because the quotation of was slightly higher than that of other hydraulic valve manufacturers by 7%. sent us an e-mail to ask whether the quotation of hydraulic check valve offered 6 months ago can be maintained, and if we can finish an urgent order of 100 hydraulic check valves in 10-12 days. I felt that this should be an order for hydraulic check valve encountered with problem. told us the truth. About 20% of the hydraulic check valves produced by the original factory were unqualified and rejected by their production director. Now he must replenish them as soon as possible. General hydraulic valve manufacturers are unwilling to make such aftercare orders, but HYDRAULIC VALVE don't think so, because , as a production factory, has the same goal as the importer, that is to serve users well, so is more willing to help customers and solve complaints from users together. Fortunately, the corresponding materials are in stock. Combined with the 24-hour production line, our production director conservatively estimates that it can be completed in 12 days. asked us to start blanking now and the hydraulic check valve order will be issued tomorrow. After 10 days, 100 hydraulic check valves were successfully finished. was very happy and quickly air freighted these hydraulic check valves to the Thanks to the God, 100 hydraulic check valves finally arrived at their workshop in 20 days. informed us by email that their engineers installed, debugged and tested hydraulic check valves, which were all normal. The 7% higher price was also agreed by his owner. The owner was very amazed that can deliver so quickly and the quality was better than that of the original manufacturer.