Origin: Malaysia
Load Port: Klang Port
Incoterms: CFR
Grade: ISRI CODE 200-206 (1& 2, 80:20)
Quantity: 500 - 2000 MT
Destination Port: Any India/Pakistan/Bangladesh/Korea/Taiwan
Payment: L/C at SIGHT 100% Confirmed
Packing: Loose
Weight: 25 MT per container
Shipping: Any Shipping Line (MBL/HBL)
Inspection: SGS or GeoChem at Seller's Option
Visit: Allowed once LC operative
Loading: within 7-10 days of LC operative and advised
HEAVY MELTING SCRAP
Origin: South Africa
Load Port: Any South African Port
Grade: ISRI Code 200 - 206
Quantity: 10,000 - 50,000 MT
Incoterms: CFR
Payment: Letter of Credit at Sight 100%
Destination: Any ASEAN Port
Packing: loose in 20' FCL
Shipping: any shipping line (HBL/MBL)
Loading: within 10-14 days of LC operative
Inspection: SGS, GeoChem or other
Visit: Allowed at time of loading
Photos:
HEAVY MELTING STEEL SCRAP
Origin: Poland
Load Port: GdaÅ?sk or other Polish Port(s)
Incoterms: CFR
Grade: ISRI CODE 200-206 (1& 2, 80:20)
Quantity: 500-2000 MT
Tolerance: +/- 10%
Destination Port: Any India/Pakistan/Bangladesh/Korea/Taiwan
Payment: L/C at SIGHT 100% Confirmed
Packing: Loose
Weight: 25 mt per container
Shipping: Any Shipping Line (MBL/HBL)
Inspection: SGS or GeoChem at Seller's Option
Visit: Allowed once LC operative
Loading: within 7-10 days of LC operative and advised
STAINLESS STEEL SCRAP
Origin: Malaysia
Load Port: Klang Port
Incoterms: CFR
Grade: SS304, 18/8 (Cr/Ni)
Quantity: 25-100 mt (SPOT)
Tolerance: +/- 10%
Destination Port: Any India/Pakistan/Bangladesh/Korea/Taiwan
Payment: L/C at SIGHT 100% Confirmed
Packing: Loose in bales
Weight: 25 mt per container
Shipping: Any Shipping Line (MBL/HBL)
Inspection: SGS or GeoChem at Seller's Option
Visit: Allowed once LC operative
Loading: within 7-10 days of LC operative and advised
PLATE & STRUCTURAL SCRAP
Origin: Malaysia
Load Port: Klang Port
Grade: ISRI Code 231, 232
Quantity: 500-1000 MT
Incoterms: CFR
Payment: Letter of Credit at Sight 100%
Destination: Chittagong, Bangladesh
Packing: loose in 20' FCL
Shipping: any shipping line (HBL/MBL)
Loading: within 10-14 days of LC operative
Inspection: SGS, GeoChem or other
Visit: Allowed at time of loading