Color: Black Capacity: 170 tons per month Use: Pipes and plastic bags Location: United States
LDPE film recycled pellets, Melt Flow Rate (MFR)1.2~1.3 Mesh #6, #6, #9 Place of Origin: : JAPAN, US, EUROPE Unit : Ton/Tons Minimum Order : 25 Tons Payment Term : T/T 50/50 and L/C 100% at sight Estimate Lead Time : 15 - 20 days Origin: Tokyo, Yokohama, Hamburg, New York, Long Beach Supplying Capacity : 200 tons/month Packaging : Jumbo Bags
DATA SHEET FOR EPOXY EPOXY COATING :- INTRODUCTION - EPOXY COATING (HYB) is a two part high solids solvent free epoxy phenolic resin based coating system designed for hard wearing, smooth surface finish for floors, walls and on steel structures. Nonskid surface finish can be achieved on floor, if required. FEATURES: 1) Hard Wearing 2) Non Dusting 3) Excellent Surface Finish 4) Non Smelling 5) Good Aesthetics 6) Highly Chemical Resistant APPLICATION: 1.Stir well before mixing Part A and Part B and mix in the prescribed ratio. 2.Apply one coat of EPOXY primer on the clean and dry surface. 3.EPOXY COATING (HYB) should be applied on the surface by brush or roller within 24 hrs. After application of primer coat it should be allowed to air dry for min. 4 hrs. Preferable in a dust free atmosphere. 4.Apply min. 2 coats with the intercoat interval of 6-8 hrs. PRODUCT SPECIFICATIONS: Application - Brush, Roller Mixing Ratio - As Directed on Packing Port Life - 30 Mins. Drying Time - Touch Dry- 30 Min, Hard Dry 6 Hrs. - Intercoat Interval 6-8 Hrs. Min. - Dry Film Thickness 125-150 Microns/per coat - depending on porosity Covering Capacity - 6-8 sq.met/kg per coat depending on porosity, roughness & method of application. Color Shades - All Standard Shades RECOMMENDED USES: 1) Food & Pharmaceutical 2) Work Shop 3) Clean Room Application 4) Chemical Resistant Coating for Concrete& Steel 5) Petrochemical, Fertilizer plants METHOD OF APPLICATION: SURFACE PREPARATION The long-term durability of the applied Epoxy coating (HYB) epoxy coating is dependent on the adhesion between sub-base and coating material. It is most important therefore, that the substrate surfaces are correctly prepared prior to application. 1.Before application of the Epoxy coating (HYB) surface should be free from loose partials, rust, oils, grease or earlier coatings and should be totally dry. 2.New concrete or cementations surface should be placed at least 28 days and have a moisture content of less than 5% before application of Epoxy coating (HYB) 3.After surface is dry, all repair work like sealing of joints, cracks filling of cavities and crevices should be carried out. HEALTH & SAFETY - Keep the containers tightly closed when not in use. Avoid contact with skin & eyes. It comes in contact with the body, wash affected parts with plenty of water and contact a doctor. Other known sector for Epoxy floor lining, Epoxy garage floor lining, Concrete epoxy lining, Concrete floor epoxy lining, Epoxy pipe lining, Marine epoxy lining, Sub marine epoxy lining, Basement lining epoxy floor shield, Louisiana, Oregon, Chip lining color epoxy floor, Aviation lining epoxy interior.
Supplier: Plastic scrap (ldpe, pp, pvc, pet, pmma, hdpe, bopp, pe, ps, abs etc)., textile waste (cotton hosiery clips, cotton thread waste), denim, unbleached, selvedges rama string, rags for mattresses, wiping rags, licekrin dropings 100% cotton bales, card fly etc.) paper scrap
Subject: Recycled PP Pellets and PE Pellets This is Ahmed from Sharmeen Group. We are the manufacturer of recycled plastic pellets PE pellets. We are pleased to offer as follow: 1- PE pellet, natural color Input material: LDPE films/liners Process: Sorting > Washing > Pelletizing No additional fillers added Available Quantity: 300 tons per month. On-going supply Pictures attached. Kindly confirm your interest to proceed. Looking forward to hearing from you