Please click here to check who's online and chat with them.

Shanghai Hs International Trading Limited

Supplier From China
May-19-16
Supplier : GE gas turbine spare parts

Established: 2004 Standards: ISO 9001:2008

Verification Status



Contact Details:
30c Xi-jiao-jing-yuan, Lane 999, Gaojing
Shanghai 201702
Shanghai China


Recent User Reviews

This user has not received any reviews yet!
 
 
Contact Supplier
Renew

More Items Similiar to: Shanghai Hs International Trading Limited

Jun-06-14
Supplier From Mashhad, Iraq
Nov-26-21
Supplier From Las Vegas, Nevada, United States
Apr-12-21
Supplier From Petaling Jaya, Selangor, Malaysia
 
Model
GE Frame 6 (6001B)

Make By
Scotland (K.E.L)

Year Make
1997

Turbine Stage
3

Compressor Stage
17

Rating
34,490 KW

Operating Speed
5114 rpm
GOLD Member
Jan-31-22
Buyer From Chongqing, Yuzhong District, China
SILVER Member
Mar-04-23
Buyer From Schwanewede, Germany
Oct-13-20

W251B8 Gas Turbine Parts

$98.0k
MOQ: Not Specified
Supplier From Abu Dhabi, United Arab Emirates
 
Hi,

We have the below W251B8 gas turbine parts (OEM) for immediate sale.

1. Honeycomb Seal - 236T983001 - 1 SET (24 Pc's)

2. Row 1 Ring Segment - 2128T59001 - 1 SET (36 Pc's)
Oct-27-18
Supplier From Miami, Florida, United States
 
70 MW GE 6FA Gas Turbine, simple cycle, Natural Gas Fuel, 3000 rpm, 11.5 KV, 50 HZ, Very low hours since installation at new. Gas-supply pressure requirement bar 27, Dry Low NOx, water steam injection with no emissions. Complete plant with auxiliary equipment. All operation and service reports available. Plant is presently stopped and maintained under the OEM preservation program. The plant is in exceptional condition and can easily be installed at the new facility to generate 70 MWâ??s of electricity. Gas Turbine package is being sold at a budgetary affordable price and is a very good investment return
May-22-18
Supplier From Miami, Florida, United States
 
31 MW GE LM2500+ Gas Turbine
General Electric LM2500+HSPT 31132 kW, Commissioned in 2004, Natural Gas, Brush Generator rated at 47500 KVA, 50 HZ, 11500 V, can be upgraded to dual fuel system. Next overhaul hours are required after 3579 running hours. Turbine package can be put into service or used for spares for an already existing plant. This plant is reduced in price and is the most affordable LM2500 + on the market.
GOLD Member
May-06-22
Supplier From Guangzhou, Guangdong, Hong Kong

Verification Status