Supplier: GE gas turbine spare parts
Supplier: GE gas turbine spare parts
Model GE Frame 6 (6001B) Make By Scotland (K.E.L) Year Make 1997 Turbine Stage 3 Compressor Stage 17 Rating 34,490 KW Operating Speed 5114 rpm
Supplier: Urea n46, diesel en590 10ppm, jet fuel a1, dap, basalt fiber products, nitrocellulose centralite ii wind turbine gearbox accessories
Services: Import and export of goods and technology
Buyer: Urea 46, diesel oil en590 10ppm, jet fuel a1, dap 18 46 , crude benzene, pure benzene
Supplier: Firewood, pellets from sunflower husks, bran and straw; briquettes from corn straw etc.; e bikes; small wind turbines
Buyer: Sunflower husk pellets
Hi, We have the below W251B8 gas turbine parts (OEM) for immediate sale. 1. Honeycomb Seal - 236T983001 - 1 SET (24 Pc's) 2. Row 1 Ring Segment - 2128T59001 - 1 SET (36 Pc's)
70 MW GE 6FA Gas Turbine, simple cycle, Natural Gas Fuel, 3000 rpm, 11.5 KV, 50 HZ, Very low hours since installation at new. Gas-supply pressure requirement bar 27, Dry Low NOx, water steam injection with no emissions. Complete plant with auxiliary equipment. All operation and service reports available. Plant is presently stopped and maintained under the OEM preservation program. The plant is in exceptional condition and can easily be installed at the new facility to generate 70 MWâ??s of electricity. Gas Turbine package is being sold at a budgetary affordable price and is a very good investment return
31 MW GE LM2500+ Gas Turbine General Electric LM2500+HSPT 31132 kW, Commissioned in 2004, Natural Gas, Brush Generator rated at 47500 KVA, 50 HZ, 11500 V, can be upgraded to dual fuel system. Next overhaul hours are required after 3579 running hours. Turbine package can be put into service or used for spares for an already existing plant. This plant is reduced in price and is the most affordable LM2500 + on the market.
New Surplus (3) GE 40 MW 6B (HFO) Gas Turbines New Surplus Heavy Duty (3) GE 40 MW 6B Simple Cycle Heavy Fuel Oil Turbines with Warranty. The New surplus turbines are available due to a cancelled project and come with GE transferable warranty. The turbines are heavy duty and designed to run on heavy fuel oil, 11.5 KV, 3000 rpm, 50 HZ, Fuel: Heavy Fuel Oil (HFO) and Distillate Fuel Oil. These are complete turbines with all fuel systems, electrical systems, control systems, air systems, cooling systems compressor systems, starting system, Lubricating system, fire fighting system and much more.