This DuPont Connectors Kit is like the duct tape of electronics that allow you to connect your electronics components together. Just select your choice of crimping tools and jumper wires (22-28 AWG), with some practice, you can make any customized wire harnesses for your Arduino, Raspberry Pi, and many other electronics prototype projects.
The male ends are meant for insertion into standard 0.1"(2.54mm) female sockets and the female ends are meant for insertion into standard 0.1"(2.54mm) male headers.
The cables can be separated into single roots as you request to do multiple connections.
Copper No. 2 kinds of alloy Wire cooper without lines, containing impurity, contain Copper quantity for 96% (minimum content 94%).
Shall not contain excessive lead and tin change of copper wire, welding of copper, brass and bronze line, excessive oil, prohibition and nonmetal,crisp, burning line, utterly margin of fine copper and excessive yarn. Need appropriate means to remove dirt. Birch Shall consist of clean, untinned, uncoated, unalloyed
copper wire and cable, not smaller than No. 16 B & S
wire gauge, free of burnt wire which is brittle
Copper No. 2 kinds of alloy Wire cooper without lines, containing impurity, contain Copper quantity for 96% (minimum content 94%).
Shall not contain excessive lead and tin change of copper wire, welding of copper, brass and bronze line, excessive oil, prohibition and nonmetal,crisp, burning line, utterly margin of fine copper and excessive sexual yarn. Need appropriate means to remove dirt. Birch
Shall consist of clean, untinned, uncoated, unalloyed
copper wire and cable, not smaller than No. 16 B & S
wire gauge, free of burnt wire which is brittle
1 lv and mv power cables , telecommunication cables , lsfh , solar ,instrument and special cables.
2 copper rod 8 mm and copper wire from 1.60 to 3
3 pvc compounds.
EN590 10ppm Kazakhstan origin from the largest trusted Refinery in Kazakhstan available for CIF or TTO transactions Very competitive price
TCO CIF
Terms Of Transaction
Delivery Ciftto 1521 Days To Any Safe World Port
Payment Term Dlclc Blcmt 103 Tt Wire
Origin Kazakhstan
Specification To Be Provided Upon Receipt Of Buyers Loiicpo
Inspection Any Universally Accepted Qq Inspection Company
Commission To Be Shared 50 Each By Both Sides
Performance
Bond
2
Procedures Transaction Procedure CIF
1Buyer issues Irrevocable Purchase Order ICPO with buyers banking details
and passport data of buyerrepresentative
2 Seller issues Draft contract for both parties to sign within 24 hours buyer signs and send back
with guarantee letter and proof of funds to fulfil the contractual agreement
3 Seller reissues the Proof of Product documents in buyer companys name as listed below
3 a Certificate of Origin
3 b Product quality passport Analysis test Report Kazakhstan GOST R
3 c Commitment to Supply
3 d Statement of Product Availability
3 e Product Allocation Export Permit
4 Upon verification of the sellers partial POP within seven 7 banking days the buyers bank
sends irrevocable operational DLC via MT700 as per the sellers credit bank account for the first
month fee In the event of the buyers banks inability to issue the letter of credit within seven 7
banking days the buyer will make a guaranteed cash deposit of USD 300000 by TT WIRE bank
transfer to the sellers bank account as security of the product allocation and also to enable the
seller to charter a vessel and start shipping This payment will be deducted from the total cost of
the product after inspection at the port of discharge
5 Upon confirmation of buyers Letter of Credit or Cash Guarantee Deposit payment at sellers
bank seller transfer title holder of the cargo to buyer issue the 2 PB and commence loading of
the cargo into the vessel tanker Upon completion of loading the cargo seller will issue the full
POP and shipping documents to buyer as shown below
Allocation Title Ownership Certificate
TransNeft Contract to transport the product to the loading port
Port storage agreement
Charter party Agreement to transport the product to the discharge port
Tank Storage Receipt
SGS Quality and Quantity Certificate
Bill of Landing
Vessel Questionnaire 88
6 NCNDA IMFPA shall be issued for all BuyerSeller Intermediaries to complete for further
processing by the Seller
7 Shipment shall commence and upon arrival of the vessel tanker at the final discharge port the
buyer shall conduct the SGSCIQ Inspection and make the balance payment for the full shipment
via TT Wire or MT103 TT Wire Transfer
8 The seller pays all buyer and seller intermediaries the full commission amount as stated in the
NCNDAIMFPA agreement
Vessels for TTO/STS EN590 available on regular basis
TERMS OF NEGOTIATION
INCOTERMS: TTO/STS
ORIGIN: EUROPEAN
INSPECTION: SGS, IQS,CIQ OR SIMILAR
INSURANCE: PAID BY SELLER, COVERING 110% OF SHIPMENT VALUE
ACCEPTABLE PAYMENT TERM: MT103/TT WIRE/USDT
COMMODITIES:
DIESEL FUEL EN590 USLD-10PPM/50PPM/500PPM GASOLINE
MINIMUM QUANTITY: 50,000 MT per Month
MAXIMUM QUANTITY: 400,000 MT Per Month
TTO/STS PRICE: USD $470 PER MT GROSS / USD 460 PER MT Net
NON-NEGOTIABLE TITLE/TANKER TAKE OVER PROCEDURE (TTO)/ SHIP
TO SHIP (STS)
1.The Buyer shall issue an Irrevocable Corporate Purchase Order (ICPO),
accompanied by the company's registration certificate and a Guarantee Letter confirming its intention to assume legal title of the product.
2.The Seller shall prepare and submit a draft Memorandum of Understanding
(MOU) to the Buyer. The Buyer shall review, countersign, and return the
executed MOU to the Seller.
3. Upon receipt of the countersigned MOU, the Seller shall provide the Buyer
with the following documentation for verification and confirmation:
A. Vessel Declaration
B. Bill of Lading
C. Loadline Report (Ullage Report)
D. Q&Q Analysis Report at Loading Port
E. Payment Invoice for Title Transfer Approval
F. Cargo Manifest
4. Upon verifying that the submitted documents, Buyer shall proceed to remit
the statutory governmental fee for Ttitle Transfer Approval in the amount of 95,000 via T/T wire transfer within two (2) international banking days. This
amount shall be deducted from the final purchase price.
5. If vessel rerouting is required, Buyer shall authorize the shipping company to
redirect the vessel to the Buyer's preferred port of discharge. The Seller shall
complete the transfer of product title to the Buyer through the relevant
governmental authority and shall issue the following documents to the Buyer:
Freshly dated Dip-Test Authorization (DTA)
Authority to Board (ATB)
Authority to Verify (ATV)
The Buyer shall then appoint SGS or an equivalent inspection agency to carry out the Q&Q analysis.
6. Upon successful completion of the dip test and once the vessel/tanker is
securely moored at the designated dock, the Buyer shall remit the remaining
balance of the purchase price via MT103 wire transfer. Following confirmation
of payment, the Seller shall issue the official Certificate of Ownership to the
Buyer, thereby finalizing the legal transfer of title. Trans-loading shall begin
immediately thereafter.
7. Trans-loading operations shall commence without delay upon confirmation of payment and title transfer.
8. The Seller shall release commissions and any agreed payments to intermediaries involved in the transaction within forty-eight (48) hours of receipt of full payment from the Buyer's bank.
7. Trans-loading commence immediately.
8. Seller will release payments to the intermediaries involved within 48 hours of receiving the Payment for the product from the Buyer's bank.
EN590 10ppm & Jet Fuel A1 available .Tank to Tank procedure :
TRANSACTION PROCEDURES FOR FOB â??TTTâ??
(TANK-TO-TANK)
1. Buyer issues ICPO together with tank storage agreement (TSA) for
seller approval.
2. Seller issues Commercial Invoice (CI), ICC WARNING LETTER for the
available product quantity in the
storage tank in the terminal port.
3. Buyer signs and then returns the commercial invoice with NCNDA/IMFPA
signed by all buyer Groups
with commission structures.
4. Seller Issue (3 DAY unconditional Dip Test Authorization (DTA) to be
endorsed by Sellerâ??s Company,
Buyerâ??s Company and Buyerâ??s chosen Logistic Company. Upon confirmation
of the signed unconditional
Dip Test Authorization (DTA) by both parties, Seller programs the
injection and then issues buyer the
following documents.
A.FRESH SGS REPORT INSPECTED IN LOADING TERMINAL PORT.
B.TANK STORAGE RECEIPT (TSR) WITH GPS COORDINATES).
C.AUTHORIZATION TO VERIFY (ATV).
D.INJECTION REPORT SHORE TANK.
E.CERTIFICATE OF ORIGIN.
F.AUTHORIZATION TO SELL & COLLECT (ATSC).
5. Buyer upon physical verification of the product and PPOP
confirmation, contracts SGS to conduct the
Dip test in Seller Storage Tank on Buyerâ??s expense.
6. Upon successful Dip Test, Buyer presents the tank storage receipt
(TSR).
7. Seller commences injection immediately into buyer tank and â??issues
buyer Title of Ownership
Certificate to be followed by all export Documentation.
8. Buyer makes payment by MT103 or TT wire transfer for the total
product and lifts the product, andseller pays all
intermediary involved in the transaction
1. Berry copper wire scrap conforming to ISRI standards/specs.
2. Minimum order quantity: 200 Metric tons. The seller can offer 1000MT - 2000MT per month / per shipment on a long term basis ( for quantities greater than the above mentioned, please write to us in detail )
3. Origin of scrap wire ( either S.A / Europe / Russia ) seller's option.
4. SOP: Letter of Intent with Bank Confirmation letter from the Buyer (trading companies). If the buyer-importer is end-user/consumer, BCL is not required but due to manufacturing licence/end products' details and other information as required before the execution of a contract.
5. Price $5500pmt CFR one safe port
6. Delivery/shipment - shall be provided after the receipt of LoI with BCL and due diligence.
7. Payment terms by Irrevocable, confirmed Letter of credit from first-class/internationally recognized bank
SizeMagikTM-LP4 - LOW PICK UP ONE-SHOT PRODUCT
DESCRIPTION An unique copolymer sizing agent for cotton compact yarn. Special product for air jet loom. Heavy fabric constructions are easier to weave at low-size add-ons using SizeMagik-LP4. The low add-on also permits greater protection on high-speed looms expensive reeds and sensitive mechanical parts life.
SPECIFICATIONS
1. Appearance: Off white Granules
2. Solubility: Soluble at 800C
3. Viscosity of 4% solution: 10 to 30 cPs
(Brookfield viscometer LVDV II+ pro -Spl.2 , rpm:100 @ 80oc)
4. Ash content (w/w) : Max 3%
5. Bulk density (gm/ml) : 0.65 to 0.85
COOKING METHOD
1. Fill the required quantity of water in the cooker.
2. Gradually sprinkle SizeMagikTM-LP4.
3. Add the required quantity of softener.
4. Close the pressure cooker lid.
5. Open the steam value and cook to @ 120�¯�¿�½?�?�ºC or 35psi.
6. Retain in the cooker for 15 to 20 minutes.
7. Then transfer the size mix to storage.
ECONIMICAL ADVANTAGES
Yarn abrasion resistance is an important factor affecting weave ability. The friction between the warp to warp and warp to the weft is important in determining the weaving quality. Another important abrasion point in the loom is mechanical parts (Reed, Dropper pin, Heald wire, Weft picking element). Compare with other conventional size mixes and one-shot size products SizeMagik-LP4 gives better abrasion resistance strength.
DE-SIZING
Easily de-sizable product with hot alkali treatment.
STORAGE
Keep away from direct sunlight and store in a cool, dry, and well-ventilated place.
STABILITY
Stable for one year from the date of manufacture.
PACKING
Available in 50Kg net weight PP bags with moisture-proof liner inside.