Please click here to check who's online and chat with them.

Find Verified Turbines Suppliers, Manufacturers and Wholesalers

Top Supplier Cities : -   Miami   Irvine  
Oct-27-18
Supplier From Miami, Florida, United States
 
70 MW GE 6FA Gas Turbine, simple cycle, Natural Gas Fuel, 3000 rpm, 11.5 KV, 50 HZ, Very low hours since installation at new. Gas-supply pressure requirement bar 27, Dry Low NOx, water steam injection with no emissions. Complete plant with auxiliary equipment. All operation and service reports available. Plant is presently stopped and maintained under the OEM preservation program. The plant is in exceptional condition and can easily be installed at the new facility to generate 70 MWâ??s of electricity. Gas Turbine package is being sold at a budgetary affordable price and is a very good investment return
May-22-18
Supplier From Miami, Florida, United States
 
New Surplus (3) GE 40 MW 6B (HFO) Gas Turbines
New Surplus Heavy Duty (3) GE 40 MW 6B Simple Cycle Heavy Fuel Oil Turbines with Warranty. The New surplus turbines are available due to a cancelled project and come with GE transferable warranty. The turbines are heavy duty and designed to run on heavy fuel oil, 11.5 KV, 3000 rpm, 50 HZ, Fuel: Heavy Fuel Oil (HFO) and Distillate Fuel Oil. These are complete turbines with all fuel systems, electrical systems, control systems, air systems, cooling systems compressor systems, starting system, Lubricating system, fire fighting system and much more.
May-22-18
Supplier From Miami, Florida, United States
 
31 MW GE LM2500+ Gas Turbine
General Electric LM2500+HSPT 31132 kW, Commissioned in 2004, Natural Gas, Brush Generator rated at 47500 KVA, 50 HZ, 11500 V, can be upgraded to dual fuel system. Next overhaul hours are required after 3579 running hours. Turbine package can be put into service or used for spares for an already existing plant. This plant is reduced in price and is the most affordable LM2500 + on the market.
Aug-01-17
Supplier From Miami, Florida, United States
 
52 mw man diesel hfo complete power plant

(7) 7600 kw man 16v32/40 sixteen-cylinder four-stroke, turbocharged and charge-air cooled engines, (7) heavy duty generators, year 2001, 750 rpm, 50 hz, only 7, 000 hours since installation, cooling system, lube oil system, lubricating oil system, control and monitoring system, electrical system, heavy fuel oil system, heavy fuel oil purification system: pumps, air system, exhaust gas system, compressed air system, heat recovery system, steam distribution system, boilers, transformers, tanks, tank farm equipment , water treatment, reverse osmosis system, desox system, start up boiler, fire fighting system, discharge pumps, water pumps, forced draft ventilation system, black-start-diesel generating set, piping, power house crane, hoist equipment and tools and spares. This is a complete plant that can be purchased a very good price.
Aug-01-17
Supplier From Miami, Florida, United States
 
New surplus (3) ge 40 mw 6b (hfo) gas turbines
New surplus heavy duty (3) ge 40 mw 6b simple cycle heavy fuel oil turbines with warranty. The new surplus turbines are available due to a cancelled project and come with ge transferable warranty. The turbines are heavy duty and designed to run on heavy fuel oil, 11.5 kv, 3000 rpm, 50 hz, fuel: heavy fuel oil (hfo) and distillate fuel oil. These are complete turbines with all fuel systems, electrical systems, control systems, air systems, cooling systems compressor systems, starting system, lubricating system, fire fighting system and much more.
8 Turbines Suppliers
Short on time? Let Turbines sellers contact you.
May-22-18
Supplier From Miami, Florida, United States
 
52 mw man diesel hfo complete power plant

(7) 7600 kw man 16v32/40 sixteen-cylinder four-stroke, turbocharged and charge-air cooled engines, (7) heavy duty generators, year 2001, 750 rpm, 50 hz, only 7, 000 hours since installation, cooling system, lube oil system, lubricating oil system, control and monitoring system, electrical system, heavy fuel oil system, heavy fuel oil purification system: pumps, air system, exhaust gas system, compressed air system, heat recovery system, steam distribution system, boilers, transformers, tanks, tank farm equipment , water treatment, reverse osmosis system, desox system, start up boiler, fire fighting system, discharge pumps, water pumps, forced draft ventilation system, black-start-diesel generating set, piping, power house crane, hoist equipment and tools and spares. This is a complete plant that can be purchased a very reasonable price.
May-22-18
Supplier From Miami, Florida, United States
 
80 MW LM2500 + Dual Fuel Gas Turbine Power Plant
Complete plant with (2) Two 30 MW LM2500 + Gas Turbines, (2) Two Steam Turbines, HRSG (Heat Recovery Steam Generators), 11 KV, 50HZ, Plant installed in 2005, Dual Fuel: Natural Gas (NG) and Liquid Fuel, Hours run since overhaul 3700 hrs. & 5000 hrs., (3) Transformers, condensers, electrical systems, control systems, cooling systems, compressor systems, starting system, lubricating system, fire fighting system and much more. Complete package, very well maintained.
Jul-25-17
Supplier From Miami, Florida, United States