PLATINUM SPENT CATALYST LOT 1 : 48.990 MT , Pt 2900 PPM/MT LOT 2 : 11.155 MT , Pt 3200 PPM/MT LOT 3 : 10.453 MT , Pt 13 PPM/MT , Re 3225 PPM/MT -
Ores and minerals.
Coke.
Tin ore.
Zinc eaf dust, copper matte, copper lead concentrates, spent catalyst, lead ash.Trading
Wooden furniture, steel pipes, pyrite .