1. Buyer issues L.O.I
2. Seler issues S.C.O
3. Buyer issues Irrevocable Corporate Purchase order (ICPO) on their official company letterhead with POF and C.P with Company Certificate.
4. Seller issues Commercial Invoice (C.I) for the lift able goods.
5. Sller issues Draft SPA Contract for 12 months to the buyer.
6. Buyer Returns Signed and Accepted Commercial Invoice (CI) and SPA Contract with NCDA/IMFPA to the seller.
7. Buyer Issues BG or SBLC via MT760 to seller's Fiduciary Bank
8. Seller's Fiduciary Bank swifts Full set of POP with shipping documents plus 2% Performance Bond (PB) to Buyer's Bank within 72 hours after Seller's Confirmation of the Bank Instrument
8.1 Full POP Documents Listed Below:
-The letter of guarantee of an oil refining
-Copy license to export issued by the ministry of enerygy
-Copy of approval to export issued by the ministry of justice
-Copy of statement of availability of the product
-Copy of the refinery commitment to produce the product
-Copy of TRANSEFT contract to transport the product to the port
-Copy of the Port Storage Agreement
-Copy of the charter party agreement(s) to transport the product to the discharge Ports
-Copy of tank storage receipts
-Copy of DIP test authority
-SGS Reports from loading port
-Ocean Bill of Lading
-Insurance (110%)
9. Shipping of the goods will/shall be commenced within 10-15 days from the date of the seller's receipt of the acceptable payment instrument or earlier
10. SGS(or Equivalent) inspection at buyer's discharge port together with final Commercial Invoice submitted to Buyer and Buyer's Bank
11. Buyer makes payment by MT103/TT wire transfer.
12. Seller's receipt of full payment
13. Title of ownership shall automatically be transfered to the buyer's Bank from seller bank
14. Seller or Seller Mandate via seller pays all the commisions to the intermediaries involved in this transaction within 24 hours after seller's Confirmation of buyer's payments.
5080 Industrial And Automotive Suppliers
Short on time? Let Industrial And Automotive sellers contact you.
1. Buyer sends ICPO to seller on receiptof seller's Soft offer along with tank storage agreement (TSA) as proof of storage availability.
2. Seller issues Draft Contract /Commercial invoice (CI) for the available quantity in the storage tank to buyer, Buyer signs nd returns to seller with scan passport copy/IMFPA signed by all buyer groups with commision structure.
3. Seller issues DIP Test Authorization letter sign by all parties including buyers tank farm.
4. Seller issues as below:
4.1
-DTA - Dip test Authorization
-Fresh SGS Report
-Tank Receipt
-ATV
-ATS
and buyer order SGS to conduct Dip test of the product in the tank on buyer's expense
5. Upo succesfull Dip test, Buyer to provide vessel details or Tank details. Seller shall immediately submit the SGS inspection report along with the full Proof of product (POP) to the buyer.
6. Buyer make 100% payment by MT103 TT wire transfer for the total product and seller and seller mandates pays commision to all intermediaries involved in the transaction 24 hours after confirmation of buyer payment.
Putty soft fast silicone impression material , 2x400 grams , Made in Germany CE&ISO
Based on Additional vinyl silicon
Setting time in patient mouth 1:30 minutes
Excellent Tear strength
High Elastic recovery 99.89%
Shade Violet
Suitable for Single or Sandwitch impression technique
Product Description
The insulated box liners are constructed with foil(can be aluminum or metalized) and bubble, being used to as liners in cartons or other containers.The good reflection and insulation effect of this product can provide the protection of buffer and heat insulation when transporting or storing goods like temperature-sensitive goods.
Structure
Double side metalized foil+one layer of bubble
one side metalized foil+one layer of bubble
Double side metalized foil+double layer of bubble
One side metalized foil+double layer of bubble
Other Shapes
2D,3D(With self adhesive or Without self adhesive)
Product Description
The insulated box liners are constructed with foil(can be aluminum or metalized) and bubble, being used to as liners in cartons or other containers.The good reflection and insulation effect of this product can provide the protection of buffer and heat insulation when transporting or storing goods like temperature-sensitive goods.
Structure
Double side metalized foil+one layer of bubble
one side metalized foil+one layer of bubble
Double side metalized foil+double layer of bubble
One side metalized foil+double layer of bubble
Other Shapes
2D,3D(With self adhesive or Without self adhesive)
Product Description
The insulated box liners are constructed with foil(can be aluminum or metalized) and bubble, being used to as liners in cartons or other containers.The good reflection and insulation effect of this product can provide the protection of buffer and heat insulation when transporting or storing goods like temperature-sensitive goods.
Structure
Double side metalized foil+one layer of bubble
one side metalized foil+one layer of bubble
Double side metalized foil+double layer of bubble
One side metalized foil+double layer of bubble
Other Shapes
2D,3D(With self adhesive or Without self adhesive)
Our company PDY Metal Recycling, is a Philippine based ferrous and non ferrous scrap supplier. We are direct from collecting, marketing, packing and trucking.
We are looking for a serious and honest buyer to have a long and lasting business relationship.
Description: Scrap Stainless 309, 310, 316, inco 800, monel, Ti etc....
Origin: Any port of philippiens
Packing: Soft Press or Loose in 20 ft container.
Destination: Any port in asia pacific Region ( other port please inquire)
Payment Terms: 20 % advance deposit or irrevocable l/c at sight
Direct buyer preferred and agents also welcome.
Please include your required port of discharge, indicative price. Direct e-mail and
Company Profile