All spices, pulses,red chilliy, kashmir red chilly powder , turmeric powder , giner powder , coriander powder , cloves powder , clove whole , asafoetida, bay leaf , cumin, fenugreek , green cardamom, cardamom, nutmeg, black pepper, wishops weed, garam masala whole, fenugreek seed, whole sago, poha'siya chunks, chilli flakes, oregano, oregano seasoning, white pepper powder, yellow chilli powder, fennel seeds, dried ginger , tamarind, dehydrated garlic , dehydrated onion, cinamon powder , nutmeg powder, white peper , fenugreek powder , large cardamom, gigner powder , tomato powder , tamrind powder, amchur powder green chilliy powder, Pu roller Rubber roller , Normal ms rollers , Any kind of rollers.
DATA SHEET FOR EPOXY EPOXY COATING :- INTRODUCTION - EPOXY COATING (HYB) is a two part high solids solvent free epoxy phenolic resin based coating system designed for hard wearing, smooth surface finish for floors, walls and on steel structures. Nonskid surface finish can be achieved on floor, if required. FEATURES: 1) Hard Wearing 2) Non Dusting 3) Excellent Surface Finish 4) Non Smelling 5) Good Aesthetics 6) Highly Chemical Resistant APPLICATION: 1.Stir well before mixing Part A and Part B and mix in the prescribed ratio. 2.Apply one coat of EPOXY primer on the clean and dry surface. 3.EPOXY COATING (HYB) should be applied on the surface by brush or roller within 24 hrs. After application of primer coat it should be allowed to air dry for min. 4 hrs. Preferable in a dust free atmosphere. 4.Apply min. 2 coats with the intercoat interval of 6-8 hrs. PRODUCT SPECIFICATIONS: Application - Brush, Roller Mixing Ratio - As Directed on Packing Port Life - 30 Mins. Drying Time - Touch Dry- 30 Min, Hard Dry 6 Hrs. - Intercoat Interval 6-8 Hrs. Min. - Dry Film Thickness 125-150 Microns/per coat - depending on porosity Covering Capacity - 6-8 sq.met/kg per coat depending on porosity, roughness & method of application. Color Shades - All Standard Shades RECOMMENDED USES: 1) Food & Pharmaceutical 2) Work Shop 3) Clean Room Application 4) Chemical Resistant Coating for Concrete& Steel 5) Petrochemical, Fertilizer plants METHOD OF APPLICATION: SURFACE PREPARATION The long-term durability of the applied Epoxy coating (HYB) epoxy coating is dependent on the adhesion between sub-base and coating material. It is most important therefore, that the substrate surfaces are correctly prepared prior to application. 1.Before application of the Epoxy coating (HYB) surface should be free from loose partials, rust, oils, grease or earlier coatings and should be totally dry. 2.New concrete or cementations surface should be placed at least 28 days and have a moisture content of less than 5% before application of Epoxy coating (HYB) 3.After surface is dry, all repair work like sealing of joints, cracks filling of cavities and crevices should be carried out. HEALTH & SAFETY - Keep the containers tightly closed when not in use. Avoid contact with skin & eyes. It comes in contact with the body, wash affected parts with plenty of water and contact a doctor. Other known sector for Epoxy floor lining, Epoxy garage floor lining, Concrete epoxy lining, Concrete floor epoxy lining, Epoxy pipe lining, Marine epoxy lining, Sub marine epoxy lining, Basement lining epoxy floor shield, Louisiana, Oregon, Chip lining color epoxy floor, Aviation lining epoxy interior.
Bitumen Primer * Bitumen Primer is Bituminous air curing ready mixed Acid & Alkali resistant special primer. Application * Concrete surface must be clean, dry and rough. No primer should be applied over smooth and wet surface. * After cleaning the concrete surface, one coat of Bitumen Primer should be applied with brush and allow to dry thoroughly. * The drying time will depend upon the temperature. * 24 Month at the temperature 30C (+2OC) Packing * Bitumen Primer: 25 Liter Drum Note * Bitumen Primer contains volatile and slightly toxic solvent. Keep away from spark and open flames at working area. * Bitumen premier it is manufactured using bitumen solution which is used for sealing of prime porous and non-porous surface, and also to protect residential and commercial building. * Bitumen Primer is used to protect substrate against corrosive attack, is suggested to apply anti-corrosive primer.It is best for protection against sub-striate against atmospheric corrosion and chemical corrosion. It is a mixed substance made up of organic liquids that are highly sticky, water proof, viscous,acid proof as with all surface coating, good Bitumen Premier is used for long life of the system. it is applied by brush or roller and allowed to dry before any water proofing treatment so to avoid solvent it is used in defects such as cracks, broken mortar joints, etc. are to be repaired prior to Bitumen primer application. Product Details: Grade Standard Technical Grade Physical State - Liquid Usage - Industrial Color - Black Characteristics: Appearance/Color - Pasty liquid/ black Chemical Base - Bituminous rubber emulsion. Density - 1.0 kg/l Curing Speed/ Rate - 3 - 4 hours Tack free after - 5 - 10 hours Cured after - 2 - 4 days (Dependent on ambient Solid Content by - temperature, substrate temperature, Weight - relative Water Content by weight - humidity and thickness of the coating) Bitumen Content - 41% by weight - Thixotropic (The viscosity can be adjusted by - Viscosity adding up to max. 5% of clean water. - Stir well prior use) - For light protection: 1.0 mm min. Coating - For greater protection: ~ 1.5 - 2.0 mm Thickness applied - in two coats. Water Penetration - 48 h, 1 bar: 78.5 cm2: 0 ml under Hydrostatic - 96 h, 4 bar: 78.5 cm2: 33 ml Pressure - Water vapor 6 x 10-7 mg / hmPa Permeability Service - -30 C to 200 C Temperature - Adhesion Concrete - Very good, Timber: Very good, Metal: Moderate Glass: Poor
Technical Specifications : Overall Dimension M.M Rolling Width 1800 Height With Roof 2760 Over all Length 4750 Diameter of Front Roll 1150 Diameter of Front Roll(2Nos.) (Each) 500 Diameter of Rear Roll 1450 Width of Rear Roll (2 Nos) (Each) 500 Weights : Standard Weight 8 tonnes ± 5% With stand ballast 10 tones ± 5% Engine : Perkins (P4) or Simpson(S4) No of Cylinders 4 B.H.P 35.5 at 1400 R.P.M Consumption of Fuel Oil : At Rated Power output 0.22 Liters / BHP/Hr. Gear : Hindustan - 50. Specifications & Salient Features : Body : Body & chassis of road roller is made from the best quality tested steel plates and MS. Gear box and differential (transmission assembly): Heavy duty suitable gear box and differential assembly with gears made out of special alloy steel is installed. Steering system Best performing easy and simple adjustable steering system is provided. Rear axle and final drive : a full length through-out rear axle is fitted in two extra heavy duty spherical roller bearings housed in steel cast housing fixed to main of roller which ensures smooth and stress free running. Brake system :A specially designed most powerful, reliable & dependable foot operated brake system is provided. Dash board :Attractively designed meter box with locking arrangement for safety purpose is fitted with oil meter, water temperature meter, hour meter, battery charging meter, starter switch, head light switch, horn button etc. for easy access from driver's seat. Scrapers :adjustable and reversible scrapers are fitted covering full width of front & rear rolls. Starting system :a 12 volt (25 plates) battery device is provided for starting purpose. Tool kit :a tool kit containing suitable size spanners, Grease gun etc is provided with rollers. Lubrication :all bearings are arranged for lubrication. Grease nipples, oiling holes provided at appropriate places for lubrication purpose. Rolls : rolls are fabricated out of tested ms steel plates, electrically welded with best quality welding electrodes. Optional accessories :optional accessories such as lights, reflectors, clarifier, water sprinkler etc. May be provided at an extra cost.