PP, HDPE.Transport
Aluminium rods, wire rods
Dental implants.
Rubber granules, chips, shredded, baled tires, steel wire.
Wood.
Laptop computer, desktop computer, monitors.
This VWT-FFS-4372 Double Loop tunnel construction and its technology equipment are optimized for a professional use of sportsmen, army troop as well as general public and schools. Optimization of the fan can be performed on any other scenario of the use of the tunnel (like only sport tunnel utilization, or only to tourism utilization, military and special training purposes, or eventual their combination...). Optimization means a proper selection of tunnel dimensions, fans and engines parameters for proposed purposes to gain an optimal ratio between desired performance and operational costs. Dimensions and technical parameters of this tunnel offer the best conditions for the professional requirements on speed, space and height. Its size provides ample space for the entire training even of group formations of eight skydivers. Tunnel with 4,3 m of flying chamber diameter is the perfect place for training of army parachutes and special troops with their specific equipment. From tourist's point of view, the tunnel offers comfortable space even for flying couples with instructors or other smaller groups. Thanks to a comprehensive fan optimization the, tunnel allows operation of profi-flights as well as fun-flights at very low operation costs. Materials and Dimensions Air conductors in the aboveground part of the tunnel are made of sheet steel. All steel elements are provided with corrosion protection. Tunnel skin is made by sound-insulation panels KINGSPAN. Net dimensions of the tunnel are: width 30 m depth 10 m height 32 m The typical depth of foundation of ground concrete structure is 7,5 m. The typical height of the tunnel above the ground is 24 m. Flight chamber Flight chamber consists of a glass part, which is on its top connected to a steel construction of tunnel shell. Lower part of the flight chamber is purely cylindrical with a diameter of 4,3 m and a height of 5 m. The upper part of a flight chamber is made from steel and its height is 9 m. The shape of this part of flight chamber is gradually changing from a circular diameter of 4,3 meters to circular diameter 4,3 x 4,3 m. The overall maximum height of flight chamber 14 m The height of the glass part of flight chamber 5 m Diameter of flight chamber 4,3 m Maximum speed Maximum air speed at which the tunnel can be operated continuously is 80+ m/s (300+ km/h). Motors, fans and electronic equipment The air stream is formed by four vertically stored fans, each of 3.15 m in diameter, which are powered by a 4 electro-motors, each rated at 355 kW. RPM are controlled and regulated by 4 frequency changers from ABB. Control and monitoring system of the tunnel is realized using SIEMNS technology. Cooling Tunnel cooling is provided by an active cooling unit with a maximum power consumption of 330 kW, which corresponds to a maximum cooling performance of 1 000kW. Cooling compressor unit is located outside the tunnel and two pairs of optimized coolers installed in the tunnel design ensures a comfortable temperature in the flight chamber even during very warm summer period. During cold seasons, from the certain threshold temperature, the compressor unit is automatically switched to dry coolers, which maximize utilization of outside cold air and rapidly decrease the power consumption (up to 30 kW). -------------------- Offered price represents VWT-FFS-3672 /3.6m , double loop technology ,FOB Cz Praha 20x22ft containers
We offer spruce wood log. pine logs. Spruce and pine lumber. Prices on request Wood from the Czech Republic
Wood.
Garden Furniture, Grills.
Copper And Aluminum Products.
Inflatable advertising, inflatable attractions and pneumatic structures.Manufacturer
Copper rods, copper wire rods of different dimensions.
Manuka Honey MGO+100 Its Pure Certified raw Manuka Honey from New Zealand. Minimum consumption 1 barrel. Maximum consumption 10 barrels. Delivery time - IMMEDIATELY. The barrels are already physically in Europe / Czech Republic and you can pick them up or organize shipment /. So you don't have to pay for shipping from New Zealand with the usual waiting time of 10-12 weeks. The current import duty in the EU of 17.3% on honey has already been paid and is already included in the price!
Attention. Looking for serious buyers. EN590 10ppm NWE Platt Price, with -10 % in Discount 1. The Buyer Issue ICPO, C/P to the Seller along with the CPA. 2. The Seller issues Commercial Invoice for the available quantity in the Sellerâ??s Storage Tank to the Buyer along with the Commitment to Supply 3. The Buyer signs and returns the CI to the Seller with the buyers vessel information and details of port clearance through the nominated vessel terminal. 4. Upon receipt and confirmation of the vesselâ??s information the Seller issues the POP documents as below and send to the Buyer within 48 hours: a. Fresh SGS (not older than 48 hours) b. DTA (Dip Test Authorization) c. Certificate of origin d. Tank Storage Receipt (TSR) e. ATSC â?? Authorization to Sell and collect f. Injection Report g. NCNDA/IMFPA. 5. The Buyer conducts Dip Test in the Seller's Reservoir. Upon successful Dip Test, the injection commences immediately into buyers vessel as scheduled. 6. Within Twenty-Four (24) hours, Buyer issues 100% TT wire transfer payment to the Seller. The Seller transfers the title ownership to the Buyer. 7. The Seller pays commission to all the intermediaries the buyer and seller. 8. The Seller issues 12 Months Contract for the Buyerâ??s review and execution
The seller offers for purchase copper powder of chemical purity 99.99%. Isotopic composition Cu(63)=69.1%, Cu(65)=30.9%. Copper powder is packaged in a plastic bottle of 2 kilograms and a plastic box of 20 bottles. The powder can be stored in glass vacuum ampoules. The product was manufactured in the Russian Federation. The product is located in Germany and Russia. The material is available for review. The cost of 1 kilogram of copper powder is 350 euros (excluding medical expenses and insurance). Minimum order quantity 520 kg (maximum 2 tons per month, contract for 12 months) Payment term: prepayment of 100% of the Seller's invoice amount after verification at the Seller's specified warehouse. The set of documents will include: - certificate of chemical purity; - invoice - check Procedures (Highlights): (Full details of procedures are available from the FCO): 1. Letter from the buyer (addressed to the seller) 2. Buyer's CIS. 3. FCO from the Seller and accompanying documents. 4. Check by the Buyer at the Sellerâ??s warehouse (if necessary). 5. Payment 6. Transport (if necessary)
Copper Powder, Copper Wire, Nickel Wire, Pure Aluminium, Copper Ingots..
BUFFINGS from truck tires , 1mt big bags size 2-3cm
black or galvanized Depth-free scrap loose, pices upto 500mm - galvanized Mn do 0,3% Steel shavings Scrap to production blue above3m Construction scrap above 10 mm Mill scale Fe 98% Scrap after depreciation above 6mm
Different grades of SBR