DATA SHEET FOR EPOXY EPOXY COATING :- INTRODUCTION - EPOXY COATING (HYB) is a two part high solids solvent free epoxy phenolic resin based coating system designed for hard wearing, smooth surface finish for floors, walls and on steel structures. Nonskid surface finish can be achieved on floor, if required. FEATURES: 1) Hard Wearing 2) Non Dusting 3) Excellent Surface Finish 4) Non Smelling 5) Good Aesthetics 6) Highly Chemical Resistant APPLICATION: 1.Stir well before mixing Part A and Part B and mix in the prescribed ratio. 2.Apply one coat of EPOXY primer on the clean and dry surface. 3.EPOXY COATING (HYB) should be applied on the surface by brush or roller within 24 hrs. After application of primer coat it should be allowed to air dry for min. 4 hrs. Preferable in a dust free atmosphere. 4.Apply min. 2 coats with the intercoat interval of 6-8 hrs. PRODUCT SPECIFICATIONS: Application - Brush, Roller Mixing Ratio - As Directed on Packing Port Life - 30 Mins. Drying Time - Touch Dry- 30 Min, Hard Dry 6 Hrs. - Intercoat Interval 6-8 Hrs. Min. - Dry Film Thickness 125-150 Microns/per coat - depending on porosity Covering Capacity - 6-8 sq.met/kg per coat depending on porosity, roughness & method of application. Color Shades - All Standard Shades RECOMMENDED USES: 1) Food & Pharmaceutical 2) Work Shop 3) Clean Room Application 4) Chemical Resistant Coating for Concrete& Steel 5) Petrochemical, Fertilizer plants METHOD OF APPLICATION: SURFACE PREPARATION The long-term durability of the applied Epoxy coating (HYB) epoxy coating is dependent on the adhesion between sub-base and coating material. It is most important therefore, that the substrate surfaces are correctly prepared prior to application. 1.Before application of the Epoxy coating (HYB) surface should be free from loose partials, rust, oils, grease or earlier coatings and should be totally dry. 2.New concrete or cementations surface should be placed at least 28 days and have a moisture content of less than 5% before application of Epoxy coating (HYB) 3.After surface is dry, all repair work like sealing of joints, cracks filling of cavities and crevices should be carried out. HEALTH & SAFETY - Keep the containers tightly closed when not in use. Avoid contact with skin & eyes. It comes in contact with the body, wash affected parts with plenty of water and contact a doctor. Other known sector for Epoxy floor lining, Epoxy garage floor lining, Concrete epoxy lining, Concrete floor epoxy lining, Epoxy pipe lining, Marine epoxy lining, Sub marine epoxy lining, Basement lining epoxy floor shield, Louisiana, Oregon, Chip lining color epoxy floor, Aviation lining epoxy interior.
Product Name: Drilling Machine Detailed product parameter description: Product model: ZOJET Z3050*16/1 Workbench size (mm): 500*630 Maximum drilling diameter (mm): 50 Distance from spindle centerline to column generatrix (mm): Maximum 1600 Minimum 350 Distance from spindle end to base working surface (mm): Maximum 1220 Minimum 315 Spindle travel (mm): 315 Horizontal moving distance of the spindle box (mm): 1250
Product name: Deep hole drilling and boring machine Detailed product parameter description: Product model: Texas deep hole drilling and boring machine (T2120) Main technical specifications and performance Technical specifications parameter Working scope Maximum boring diameter 200mm Drilling diameter range N40-N80mm Maximum boring depth 1000-8000mm Working support diameter range 60-300mm Spindle Spindle center height 350mm Headstock spindle bore 75 Spindle front end taper hole 85mm1:2 Spindle speed range 61-1000r/min 12 types Feed Feed speed range (stepless) 5-1000mm/min Fast moving speed of carriage 2m/min Motor Main motor power 30kW Hydraulic pump motor power 1.5kW Power of fast motor of carriage 3kW Feed motor power 4.4kW Cooling pump motor power 5.5kW4 groups other Cooling system rated pressure 2.5MPa Cooling system flow 100 200 300 400L/min Rated working pressure of hydraulic system 6.3MPa The oiler can withstand the maximum axial force 6.3KN Maximum preload force of the oiler on the workpiece 20KN Dimensions and weight length parameter 1000 2000 3000 4000 5000 6000 7000 8000
Steel construction materials, hardware & tools, glass, cement, plywood, plastic, aluminium.
Turbocharger.
Motors, hydraulic power units, coffee grinders, construction machinery, electirc equipments.
Geogrids, Geotextile, Geocell, Geonet,.
steel structure buildings , we can design and supply all kinds of steel hangar kits, steel hall, steel structure storage shed, steel villa frame, steel structure warehouse, steel structure workshop, steel construction building, commercial buildings, aircraft hangars, stands, platform, indoor horse arena, churches, Logistics Warehouse, apartment building,office building,steel hotel building, steel structure mezzanine floor, industrial buildings , processing plants, steel warehouses, shopping malls,water tower,structural frame, poultry houses,poultry farm building, chicken farm buildings,chicken house,broiler house,cow barn cow shed, dairy farm building, pig building house, goat building house, agricultural buildings and many other steel structures and many other steel structures
Building material just like various ceiling board, drywall tape and adhesive tape.
Minerals, construction machinery, spare parts, ferrous metals.Procurement, inspection, shipping, commission agents
Stone crushing, dryer machinery, grinding mill, raymond mill, ore dressing.
Refractory, slag dart, slag blocking, slag skimmer.
Glassfiber reinforced gypsum, alpha gypsum, beta gypsum, plaster of paris, gypsum powder.
Industrial valve, pipeline, pressure vessel, dish head, elevator, escalator, passenger conveyor, platform screen door, civil building material, pure electric bus.
Calcium silicate board, fireproof board, fiber cement siding, composite siding, fiber cement board, explosion venting board, artistic ceiling board, fiber cement cladding.
40/120 Beam launcher was used for erecting the or concrete beam of 30m 40m which its weight was is equal to or less than 120 tons , Railway project , Generally, this kind of 40/120 Beam launcher often was designed the steel truss girder with the nose girder, and its length will be two bridge spans length. the Beam launcher can feed the concrete beam directly behind with beam trolley, it can carry out the erection concrete beam of 30m 40m over the river or railway it will not influence the ground transportation situation in the city or main traffic road. It has small self-weight for small construction load, construction speed block, safety and stability, and it will be used widely in railway Bridges and highway Bridges construction field.
Eva, peva, pvc, polyester and such as shower curtain series, table cloth series, table cover series , chair cover series , sofa cover series , table flag series, tent flag series, laundry basket series, bath mat series and so on.