Used construction machinery, excavators, dozers, cranes, backhoe loaders, access platforms, boom lifts, dumpers, telescopic handlers.
The Aluminium Incinerated scrap is the by-product derived from the reprocessing IBA Incinerator bottom ash). It can be classified as follows: Basel code B1010. EW Code: 17 04 02. With a low melting point at 660'C, on visual inspection, aluminium can be found as melted and re-solidified particles or rocks. This happens to aluminium foil that is converted into small droplets during the incineration process. Some larger and thicker aluminium packaging items can still be partially recognised as they retain their shape. The heterogeneous nature of the processed material is due to the diversified conditions present in the combustion chamber, (some relatively cooler regions in the furnace). The stock can contain all kind of aluminium packing. We can currently provide this material in three different fractions and with different aluminium content: 3-8 mm split in two different qualities: 65% ± 3% Al 85% ± 3% Al 8-16 mm: about 70% ± 3% Al 16-60 mm: about 80% ± 3% Al The material contains minor impurities typically stones, ash, glass. Such components are inherent and adhere to the scrap surface. The total impurities can be sorted, but not fully removed. The collected stock is stored in warehouse on cemented flooring. It can be loaded loose in 20' Feet heavy duty container.
1 x Used Hitachi ZX130LCN-6 Excavator. Year of Manufacture: 2018. Specification: 14,400kg, Hydraulic Quick Coupler, Auxiliary Line, Boom & Dipper Check Valves, A/C, Heated Seat, Good Undercarriage Approximately 70% good. EPA & CE Machine. Working Hours: 5,900. Price: Euro 38,500 GBP ex works United Kingdom. Machine Location: West Yorkshire, United Kingdom Origin: The Netherlands, European Union. Minimum Order: 1 Unit Available. Shipping Terms: Ex Works United Kingdom. Price is Ex Works United Kingdom. We are happy to provide transportation & Shipping Prices should you require this. Payment Terms: 100% TT Before Shipping
Secondary used surplus steel, electrical steel, transformer lamination, crgo, silicon steel cold rolled and hot rolled, seamless steel tubes, steel pipes scrap, transformers scrap, copper scrap, aluminium scrap, aluminium cable, copper cable, bright bars, black bars, shafts, hollow shafts, stainless, brass, wire rope.International trade
Auto spare parts.
Auto spare parts products.
Food, industrial and automotive spare parts.Consultants for International Trading
Automotive soft scrap.
* Quantity MIN 1,000,000 Barrels x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * Payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity : MIN 50,000MT x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyers bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Sellers fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 1,000,000 Barrels x 12 months with R/E * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * Payment is then made by Seller, who carries out all commissions transfers. *Contract: 12 Months with possible rollovers. * Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 50,000MT x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 1,000,000 Barrels x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * Payment is then made by Seller, who carries out all commissions transfers. Contract: 12 Months with possible rollovers. Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 50,000MT x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 50,000MT x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 50,000MT x 12 months * Origin: Russian Federation Specifications: Standard Export Quality. * Payment: By MT103/760 * Price/Commissions: Final price to Buyer is the Gross, including all commissions. Commissions * Payment is then made by Seller, who carries out all commissions transfers. * Contract: 12 Months with possible rollovers. * Inspection: SGS or similar * CIF DLC or SBLC PROCEDURE 1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank Statement or equivalent 2. Seller issues Sales and Purchase Agreement (SPA). 3. Buyer signs and returns SPA. 4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP. 5. Seller issues PPOP to Buyer including the following: A. Copy of license to export issued by the Department of the Ministry of Energy. 8 B. Copy of approval to export issued by the Department of Ministry of Justice. C. Copy of statement of availability of the product. D. Copy of the refinery commitment to produce the product. E. Copy of contract to transport the product to port F. Copy of the port storage agreement G. Copy of the charter party agreements to transport the product to the discharge port. H. Tank Storage Receipt (TSR) I. Q & Q by Current SGS report. 6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760 to Seller's fiduciary Bank account. 7. Seller issues 2% Performance Bond to Buyers bank. 8. Shipment Commences 9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller. 10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
Black LDPE granules is produced from European origin post industrial 60/40 and 80/20 grade raw materials. Standard process includes crushing, washing in three separate pools, agglomerating and extruding in two stages. MFI Range (190 -C 2,16 kg ) 0,80-1,00 g/10 min at 190 C 2,16 kg Density 0,91-0,93 g/cm3.
Exotic wood, automobile parts.
Agricultural machinery & parts, land rover parts, automotive parts.
Iron Ore, Manganese Ore,Chrome Ore, Iron Ore Lumps, Iron Ore Fines, Mill Scales, Copper Ore, Lead Ore. We sell iron ore, iron ore fines, iron ore lumps, hematite iron ore, magnetite iron ore with vairous grades, if you have such demand, pls feel free to contact us. Iron ore is the source of primary iron for the world's iron and steel industries. It is therefore essential for the production of steel, which in turn is essential to maintain a strong industrial base. Almost all (98%) iron ore is used in steelmaking. Iron ore is mined in about 50 countries. The seven largest of these producing countries account for about three-quarters of total world production. Australia and Brazil together dominate the world's iron ore exports, each having about one-third of total exports