Scarifier
Description:-
This is the latest in grinding technoiogy for rernoving all types of coatings, stains, contamination and flooring inperfections.
High performance machine for concrete floor preparation.
Ideal machine for preparing ondustrial floors to take epoxy or other toppings.
Removes up to 4mm in one pass.
Handwheel for precise grinding depth.
Two speed forward and reverse transmission.
High performance octagonal carbide tipped cutters.
Vacuum attachment, lifting sling, safety switch.
7.5 KW, 440 w motor, Weight 350 Kg.
Working width 300mm.
Output : 50 m2/hr.
Rammer
Specifications:-
Length of compaction shoe - 700mm
Width of compaction shoe - 500mm
over all length - 1500mm
over all width - 500mm
over all height - 1500mm
Travel speed - 10m/min
Depth of compaction - 30cm
Weight - 150kg
Ride on Trowel
Description:-
Engine - Honed 24 HP/B & S vanguard 22 HP
Start - Elrc.starter
Overlap - No
Net weight - (kg) 270
Working Weight - (kg) 330
Blades speed - (RPM) 140
WORKING Width - (MM) 1880
Size (MM) - 1900 x 1000 x 1050
Vacuum Dewatering System
Double beam screed vibrator
Jamshedji double beam screed vibrator is self-traveling and only requires guiding along the formwork dragged by two operators and they do not need to work in concrete. It is light in weight, economical to maintain, durable high quality heavy-duty spring steel, portable stressing bars for leveling.
Beams of different sizes can be provided, if ordered.
Walk Behind Roller
Description --------------- Value
Working weight --------------- 180kg
Working width --------------- 560 mm
Actual load --------------- 2.9 kg/cm
Walking speed --------------- 1.6 km/hr
Frequency --------------- 4620/rpm
Centrifugal Force --------------- 10 km
Engine --------------- G X 160 5.5hp (Petrol)
Concrete Mixers
Drum: Constructed of rolled steel plateand steel end plateswelded together with machined roller path.A central cast iron gear ring is fitted in segments.Special abrasiveresisting blades are provided for perfect mix.
Strip: The fully automatic loader is designed to give a steep angle of feed. A shakeris is fitted to assist the discharge.
Watertank:Self measuring type is fitted on the frame of the mixer.
Transmission:Suitably encased bushed roller chain with machine cutsprokets driving directly on the drive shaft. In the drum roller assembly each roler is mounted with renewable bearings.
Chassis:Strong all steel welded constructions with swivelling front axle provided with four iron wheels. Luberication is by means of grease ripples.
Note:All moving parts are enclosed affording complete protection to operator and immunity from weather.
Transit Mixer
Description:-
Nominal capacity - M3 6
Geometric volume - M3 10
Filling ratio - % 59
Drum speed - PM 0 - 14
Diameter - Mm 2200
Rollers - No 2
Water pump - L/min 375
Water pump pressure - Bar 3
Water meter scale - L 0 - 400
Water tank capacity - L 400
Total weight - Kg 3400
Reverse Drum Mixer
Description:-
Water tank capacity - Lighter 120
Skip loading capacity - Lighter 750
Output per hour - Cu. M. 10-20
Output per batch - Cu. M. 0.5(1/2)
Hydraulic system working pressure - Bar 90
Test pressure - Bar 120
Crompton Greaves make electric motor three phase û 440V - H.P. 12.5
Over all dimension Length - mm 3470
Width - mm 2100
Height - mm 3350
Pneumatic wheels - 600 X 19 4 Nos.
Hopper Drum etc. made from M.S. Sheets - 6 & 8 mm
Weight - kg 2500
Concrete cutter
Description:-
Power Motor - 7.5 H.px2800rpmx3P.h
Engine - 8 H.px3600rpm
Cutting Speed - 15mtr./ltr.
Cutting Depth* - 4in-6in
Transpotation - olid rubber wheels with bass bearings
Dimensions - L-1420xW-730xH-800
Weight - 130kg approx.
Water Tank - 50ltrs
Concrete Pump
This is multi purposes pump with number of advantages because of high pressure it can be used for plastering, shotcreting, grouting and pumping concrete @ 15m3 hr. it is most ideal pump for a standard builder of India. The equipment is mounted on a strong framed chassis with pneumatic tyres for mobility on site at 25 Km/hr. An additional feature of Jamshedji pump is that an additional tyre is givern for easy move ability manually by a couple of workers for a short distance on site.
The pump has been commissioned at the site of Tala Hydro Electric project, Bhutan for shortcreting job of tunnels and mountains slope, and the performance was very successful up to satisfaction of our customer.