Main Features:
1. The gasifying incineration way is utilized and the rubbished produced each day is able to handle the one-off incineration treatment.
2. The gasifying incineration, mixed incineration, burn-out treatment and other technologies are used to make the content of the smog exhaust and dust lower than the discharge standard regulated by the nation.
3. Fully seal operation is adopted to be applied to dealing with the infectious medical waste and avoid the secondary pollution.
4. Small volume and site area.
5. The series of incinerator are divided into the fuel and gas kind which can be selected according to the different needs of the users.
Incinerator structure:
Vertical type furnace body (including feeding door, ash door),first burning chamber, secondary combustion chamber, flue gas purification chamber, secondary combustion chamber, fan, independent chimney, fuel transfer system, blower and air supply system, control system of emergency discharge flue, etc.
Main Features:
1. The gasifying incineration way is utilized and the rubbished produced each day is able to handle the one-off incineration treatment.
2. The gasifying incineration, mixed incineration, burn-out treatment and other technologies are used to make the content of the smog exhaust and dust lower than the discharge standard regulated by the nation.
3. Fully seal operation is adopted to be applied to dealing with the infectious medical waste and avoid the secondary pollution.
4. Small volume and site area.
5. The series of incinerator are divided into the fuel and gas kind which can be selected according to the different needs of the users.
Incinerator structure:
Vertical type furnace body (including feeding door, ash door),first burning chamber, secondary combustion chamber, flue gas purification chamber, secondary combustion chamber, fan, independent chimney, fuel transfer system, blower and air supply system, control system of emergency discharge flue, etc.
Main Features:
1. The gasifying incineration way is utilized and the rubbished produced each day is able to handle the one-off incineration treatment.
2. The gasifying incineration, mixed incineration, burn-out treatment and other technologies are used to make the content of the smog exhaust and dust lower than the discharge standard regulated by the nation.
3. Fully seal operation is adopted to be applied to dealing with the infectious medical waste and avoid the secondary pollution.
4. Small volume and site area.
5. The series of incinerator are divided into the fuel and gas kind which can be selected according to the different needs of the users.
Incinerator structure:
Vertical type furnace body (including feeding door, ash door),first burning chamber, secondary combustion chamber, flue gas purification chamber, secondary combustion chamber, fan, independent chimney, fuel transfer system, blower and air supply system, control system of emergency discharge flue, etc.
Main Features:
1. The gasifying incineration way is utilized and the rubbished produced each day is able to handle the one-off incineration treatment.
2. The gasifying incineration, mixed incineration, burn-out treatment and other technologies are used to make the content of the smog exhaust and dust lower than the discharge standard regulated by the nation.
3. Fully seal operation is adopted to be applied to dealing with the infectious medical waste and avoid the secondary pollution.
4. Small volume and site area.
5. The series of incinerator are divided into the fuel and gas kind which can be selected according to the different needs of the users.
Main Technical parameters:
Model
item
LDF-20 LDF-30 LDF-50
LDF-100 LDF-150 LDF-300 LDF-500
Burning Capacity 10-20KG/time
3-6 times per day 20-30kg/time
(3-6 times per day) 30-50kg/ time
(3-6 times per day) 50-100kg/time
(3-6 times per day) 100-150kg/ time
(3-6 times per day) 200-300kg/ time
(3-6 times per day) 300-400kg/ time
(3-6 times per day)
Size of the Burner (m)(L*H*B)
1.6*1.2*1.7m 1.45*0.9*1.75 1.8*1.15*3
1.8m*1.4m*3.4m 2*1.4*3.5 2.2*1.4*3.8 3*2*4.8
Size of the filling entrance (mm)
380*480 480*600 620*800
520*720 760*960 900*1100 1080*1280
Chimney(mm) Ã?280(OD) Ã?280(OD) Ã?280(OD) Ã?300(OD) Ã?300(OD) Ã?400(OD) Ã?460(OD)
Air-blower
0.25kw 0.37kw 0.37kw
0.5kw 0.5kw 1.1kw 1.1kw
0.55kw
Auxiliary machine Power 0.11kw
oil consumption 4-6kg/h Power 0.11kw
Oil consumption 4-6kg/h Power 0.11kw
Oil consumption 4-10kg/h Power 0.11kw
Oil consumption 4-10kg/h Power 0.11kw
Oil consumption 4-10kg/h Power 0.22kw Oil consumption 7-14kg/h Power 0.22kw Oil consumption 7-14kg/h
Incinerator structure:
Vertical type furnace body (including feeding door, ash door),first burning chamber, secondary combustion chamber, flue gas purification chamber, secondary combustion chamber, fan, independent chimney, fuel transfer system, blower and air supply system, control system of emergency discharge flue, etc.