Casing is the major structural component of a well. Casing is needed to:
Maintain borehole stability
Prevent contamination of water sands
Isolate water from producing formations
Control well pressures during drilling, production, and workover operations
Casing provides locations for the installation of: Blowout preventers
Wellhead equipment
Production packers
Production tubing
The cost of casing is a major part of the overall well cost, so selection of casing size, grade, connectors, and setting depth is a primary engineering and economic consideration.
Casing is the major structural component of a well. Casing is needed to:
Maintain borehole stability
Prevent contamination of water sands
Isolate water from producing formations
Control well pressures during drilling, production, and workover operations
Casing provides locations for the installation of: Blowout preventers
Wellhead equipment
Production packers
Production tubing
The cost of casing is a major part of the overall well cost, so selection of casing size, grade, connectors, and setting depth is a primary engineering and economic consideration.
Proudct name:professional production and sales of manufacturers of high strength drill pipe, drill pipe, drill pipe short coat
Standard:api spec 5d
Grade:e-75 x-95 g-105 s-135
Wall thickness: 7.11 - 10.92 mm