Please click here to check who's online and chat with them.

Vision Industrial Services

Supplier From India
Feb-23-20
Supplier : 25 mw power plant gas turbine type

Verification Status



Contact Details:
Gupthas Square
Vijayawada
Krishna District
Prakasam 523001
Andhra Pradesh India


Recent User Reviews

This user has not received any reviews yet!
 
 
Contact Supplier
Renew

More Items Similiar to: Vision Industrial Services

May-22-18
Supplier From Miami, Florida, United States
 
30 MW LM2500 Gas Turbine Power Plant
Complete plant with (1) Two 30 MW LM2500 Gas Turbine, HRSG boiler with supplementary burner 10.5 KV, 50HZ, Turbine Year: 2007, Dual Fuel: Natural Gas (NG) and Liquid Fuel, Hours run since overhaul 12000 hrs., Borescope performed in 2016, Large amount of Spares come with Package, Transformers, electrical systems, control systems, cooling systems, starting system, lubricating system, pumps, fire fighting system and much more. Complete package.
GOLD Member
Feb-23-20
Buyer From Singapore, Singapore
GOLD Member
VERIFIED
Aug-08-08
Supplier From Shanghai, China, China
GOLD Member
May-18-01
Buyer From Bengaluru, Karnataka, India
May-22-18
Supplier From Miami, Florida, United States
 
46 MW LM6000 PC Sprint Gas Turbine Power Plant

Complete plant with 46 MW LM6000 PC Sprint Gas Turbine, Brush Turbo Generator, 60 MT/HR (HRSG), Fuel: Natural Gas, 17,000 hrs. since overhaul, Year of commissioning 2006, 11.5 KV, 50 HZ, Transformers, electrical systems, control systems, cooling systems, starting system, lubricating system, pumps, fire fighting system and much more. Complete package.
May-22-18
Supplier From Miami, Florida, United States
 
200 MW Siemens SGT-800 Gas Turbine Power Plant
Three (3) Siemens SGT 800 Gas Turbines, Siemens Steam Turbine, 3000 rpm, 50HZ,
Commissioned Year: 2013, Total operating Hours, 21,000, Hours ran after last inspection
2500 hrs. (3) HRSG, RMS station, HV switchyard,, electrical systems, control systems, air
systems, cooling systems, compressor systems, pumps, starting system, lubricating system, fire fighting system and much more. Complete plant, can be inspected in operation.
May-22-18
Supplier From Miami, Florida, United States
 
60 MW GE LM6000 PC Gas Turbine Power Plant
50 MW GE LM6000 PC gas turbine, Year of manufacture: 2011, Hours since new: 7000 hrs.,
3000 rpm, 50 HZ, 13 MW Siemens SST 300 steam turbine, Year of manufacture: 2012, Hours since new: 5000 hrs, transformers, electrical systems, control systems, air system, cooling system, starting system, lubricating system, air compressors, HV System, MV System, LV System, ABB Pumps, Demi Water Systems, fire fighting system and much more. Complete plant in new condition, can be inspected in operation.
May-22-18
Supplier From Miami, Florida, United States
 
120 MW LM6000 PC Gas Turbine Power Plant
120 MW LM6000 combined cycle power plant consists of ( 2) 47 MW LM6000 PC Gas Turbines, Year 2007, 50 HZ, 11.5KV. HRSG, Steam Turbine, electrical systems, control systems, air system, cooling system, starting system, lubricating system, air compressors, demineralization unit, switch room, transformers, pumps and much more. The LM6000 PC gas turbine power plant is a complete plant that has been well maintained since installation on site. Can be seen in operation.
GOLD Member
May-14-24
Supplier From Kota Kinabalu, Sabah, Malaysia
 
Mobile Compact Desalination Plant
Seawater~Fresh water. No Chemical/Low Energy Consumed
Origin: Malaysia
Capacity: 50m3D ~ 5,000m3D
Packing: 1 x 20' ~ 1 x 40' FCL
Price: Reasonable
Delivery & Installation: 3 months

Verification Status