Supplier: Construction materials E.G. sand, stones, crusher run
Services: Transportation
Buyer: Sand, stones, crusher
Supplier: Diesel, Minerals, River Sand, Crusher Run
Buyer: Petroleum Products (Petrol And Diesel)
Supplier: Gravel, limestone, boulders, crusher run, sharp sand, and quarry materials.
Supplier: Minerals kaolin, silica sand, aggregate, crusher run, mix rubble, hard core and armour rock
Services: Export
Buyer:
Supplier: Natural Foods And Beverages, Edible Oils, Ginger, Garlic, Apples, Lemons, Oranges, Mandarins, Avocado, Fruits And Vegetables, Cement Clinker, Gypsum, Salt, Portland Cement, Cement Aggregates Such As Gravel, Crusher Run, Chemical, Food Additives, New Energy Products (ups, Outdoor Energy Storage Power Supply, Solar Panels, Generators, Portable Power Stations, Power Conversion Devices, Wood And Wood Waste, Charcoal Etc),
Supplier: Armour rock, aggregates, crusher run stone column ballast, constructions washed river sand, construction marine sand, reclamation marine sand, dumping river sand, construction courses sand, construction fine sand clay, silica quartz, silica sand, iron ore, limestone, palm oil, marble
Services:
Buyer: Petcoke, coal
Advantage: , 1.Crushed process flow introduction Crusher breaks up large sized gypsum ore, to small granule less 25mm. 2.Boiling furnace The equipment has over 95% dust collection efficiency and eliminate the dust polltion, and sustainable structure Because of the fluidization material, funace doesn't need rotatable component Damaged by over heating and has longer operating life. , 2. Compact design and less space requirement With vertical arrangement, the dust catcher on the top of the furnace body is integrated with the boiling furnace compactly. The system not only less space but also avoids condensation of the dust catcher. Our service 1) the machine, guarantee 5 years, except the easy worn parts such as bearings, electric buttons. 2) machine delivery time:, 2 to, 4, months after the deposit. 3) payment terms: tt or lc 4) machine installation and commissi on:, 2 to, 3, months when the buyer prepare the installation and commission conditions. 5) we offer engineers train the buyers' worker to operate the machine and after you master the machine then pay us the installation and commission payment. 6) in order to guarantee the machine running, each year we will send engineer to check and development the technology with the buyer. 7) if the buyer can not run the machine well then we will send the production engineers to help the buyer to run the machine, and we can cooperate for long terms.