White cement paint colors Waterproof cement paint used for exterior and interior decoration for walls, its main ingredient is white cement, it is available in different shades, it can long lost for 2 to 3years on exterior walls and 3 to 4years on interior walls 25 kg laminated gunny pack/polythean bag (17"x27")
Spray Paints (All Paint Colors) 400ML/275GRMS
we have more types paints for wooden for metallic fast dry wayline...
First, the construction conditions: 1, temperature: the general requirements of the site temperature above 10 degrees Celsius, the season is suitable for construction. 2, humidity: no more than 85%, the current season is suitable for construction. 3, ventilation: the best natural ventilation conditions, in the absence of wind, sand, rain, the outside temperature is not high, try to open the doors and windows for ventilation. 4, lighting: the requirements of indoor lighting, so you must meet the requirements of the construction site of the light. 5, water and electricity: the requirements of the construction site has power, water, in order to ensure the normal use of construction machinery. Two, safety and health site management: 1, the construction personnel must wear masks, gloves, wear your badge to enter the construction site. 2, closed area, wearing a breathing mask, to maintain the flow of fresh air. 3, in the construction process, construction personnel and construction site near the wall of the staff to breathe steam, no skin and eye contact material. 4, storage of materials, raw materials must stored in the shade, shelter, ventilation, away from the heat source of fire, prevent the ignition and or deterioration of the material. Placement of "no smoking" sign. 5, fire control measures: construction personnel shall not smoke, point fire. A fire extinguisher with carbon dioxide must be provided at the construction place. 6, the site protection: the prohibition of cross operation, construction period is strictly prohibited without the construction personnel to enter the site, any personnel to enter the construction site has been applied to the construction site inspection, must take off the shoes to enter the thick. Three, construction quality management: 1, the scene by 2 - 3 site Project Manager has overall responsibility for the construction quality, schedule, scheduling and other items, and the other is equipped with 3 - 5 construction technology supervisor. 2, the quality technology supervisor to follow the construction team, the whole process supervision, supervisor to in a timely manner to the project manager in the construction of occurrence problem, and solve the problem in time. 3, quality inspection: Project Manager and supervisor to strict inspection and check each one step, ensure each procedure are qualified, under the procedures in a timely manner.
Colored polyurethane underwater paint Product outline This product is colored. Non-tar double component green environmental protection underwater paint. The cold construction craft simple service convenience may carries on the construction under the normal temperature to the even roofing and each kind of structure complex spot. Whole Cheng Moxing good has rubber elastic elongation ratio the best pupil without the joint to be able to adapt the basic unit crack and the distortion. The cementation intensity high applicable scope is broad. But is welcoming the water to use by Shui Chushi is 1 level of waterproof ideal material. The service life long bears the period of five days to bear the aging, to bear the greasy dirt and certain acidproof alkalinity stable property service life may amount to above 20 years. Mainly uses in the roofing, side the subsurface construction, the ground construction and the building hit and the joint. Material amount used Generally each square meter needs 2-2.7kg thickness 1.5-2mm. to divide 3-4 coating, time coating wants evenly consistent. High and low spreads blows the direction to do alternately in any case. Each time the time interval decides general by the construction ambient temperature and the paint film solidification degree many in 24 hours. Does not stick take feel as the standard. Stick an adhesive-bonded cloth or the Bolivian filament cloth according to the design requirements also coca coating either the multi-layered middle shop are better. Paint film protection In order to lengthen the waterproof layer the service life to guarantee the project quality. On the person roofing makes the cement mortar protector on the paint film when the last paint film has not solidified. Scatters 2-3mm the granulated substance or the stone chips favors the paint film and the protector cementation.
Supplier: Zircon flour, zirconium silicate for foundry, ceramics, paints, rubber, composites, abrasive, ceramic colour
Supplier: Paints
Supplier: Paint colors
Supplier: Paint colors
Supplier: Bridal mehndi, party make up, hair styling, jewellery setting, saree draping/lehnga & chunni setting, nail paints, all types of cuts, hair coloring, hair rebonding, hair perming, hair spa, hair keratine treatment, all types of facials, menicure, pedicure, threading, waxing, body polishing