) into plastic mold(500*250*60) and make it vibratory compacted. After 2-5 days when concrete is solidified in mold, we use strip machine to get out the adobe and stack it. Then we follow the maintenance procedures. Equipment features 1. Double-tracks, form at a time automatically. 3. Die-filling; 4. Molding(mechanization); 5. Mold unloading(mechanization) 6. Air-dry; 7. Model processing; 8. Inspection; 9. Leave factory.