1,Blend dosage range is 0.5-1.2%. Appropriate blend dosage can be selected according to project object and the materials used during application. 2,FDN powder is recommended to be applied in solution. It can be used in dry form, but make sure mix it thoroughly with concrete. 3,If this product is applied with adoption of stagnant water blending method or post-blend approach, water reduction and dispersion will be better. 4,This product can be formulated with concrete additives of other varieties. It can be "double blended" with blending materials such as fly ash, ground slag, etc. But the blend dosage shall be calculated based on the total of cementing materials. 5,When this product is used for the first time or cement variety is changed, concrete trial preparation shall be conducted according to the adopted materials and construction requirements in the field. Construction mixing rate shall be adjusted based on testing result to serve as instruction for construction blending.