Price based on 62%Fe Platts, at currently Platts minus 5%. Price is reviewed every month
to conform to this discount. Platts price is determined as 5 day average before shipment date.
If Buyer wants a fixed price over the duration of the 12 months, we can quote at time when
Contract is about to be issued. Spot or Trial shipments normally paid via MT-103. Negotiable.
For 67%Fe, Price is 64.5%Fe price plus $10.
- Payment by Irrevocable Non-transferable DLC (MT700) or SBLC (MT760).
Issuance shall be within 10 days after Contract signatures by both parties.
SPECIFICATIONS
Chemical Composition (on Dry basis, percentage by weight)
Guaranteed Fe 64.5% basis, Reject <63%
SiO2: 1.90% Max
TiO2: 0.0022% Max
Al2O3: 0.06% Max
MnO: 0.011% Max
MgO: 0.365% Max
Na2O: 0.025% Max
K2O: 0.01% Max
P2O5: 0.04% Max
P: 0.0011% Max
S; 0.001% Max
CaO: 0.0850% Max
FeO: 15% Minimum
Moisture Content (Free moisture loss at 105 degrees centigrade):Guaranteed 8.00%
Max) . Physical size max. 10 mm.
Physical Specification (Natural Basis): LUMP Nominal 50 mm �¢?? 90% min. as a load
basis set by seller.
Physical Specification (Natural Basis): FINES
Guaranteed below 3.0 mm �¢?? 1 mm 80% min as load basis set by seller.
MoQ - 150,000 MT x 12. Quantities can be increased by multiples of
150,000 MT (300 KMT, 450 KMT, 600 KMT up to 1050 KMT)
Break bulk. Ore shipped as DRY Metric Tons.
Please ask detailed and specific
questions about Pricing, Minimum Order Quantity, Delivery Timelines etc. Detailed Messages
result in prompt responses.