Used Bulldozers CAT D7G D7G with winch for pulling logs Working ready Excellent conditions.
Central asphalt stationary, with oven, mixer, filter sleeves and dust deposit, deposit of naphtha, boiler heating, deposition of glue, 4 silos for inert with lanyard, 1 silo ready for tarmac, 1 compressor. 280.000 euros. 5 trucks.
Tadano TG751(75TON,1978Year) TG452(45TON.1978Year) TR151(15TON.1978Year).
Used kawasaki 70.
Used loader kawasaki 80.
Tadano crane, good condition ready for work. Tadano 50t truck crane.
Year:2003 Engine:nisson Chassisi:nisson Boom:4 sections Base boom:10.7 m Full-extent boom:32.4m Capacity:25 ton Place of origin:japan Front cab:left side Back cab:right side Overall length:12.9m Overall width:2.5m Overall height:3.4m Max speed:75km/h Priceú¦us$50, 000 fob shanghai The prcie negonitable Original computer controlled
Wheel loader Komatsu loader wa150(year 1986)
Komatsu motor grader gd605a One (1) each used 1997 komatsu gd650 motorgrader, enclosed cab, 14' moldboard, scarifier, tires average 30%, unit runs out strong Roro vessel or open track
DEMAG 32t hoist unit Brand: demag Year of construction: 1989 Model: p2080 Load capacity: 32t
Used Good Condition 2021 Year second-hand 3T Forklifts
Used Hyundai R 340 is now available for sale
used Caterpillar 320D excavator made in Japan Year 2012used 1040  hoursS/N: JJGZ01496original painting shipping dimensions: 9.44x2.8x3.74mWeight: 20330kgBucket capacity: 1.2cbmEngine model:CAT 3066ATAACPower: 140hp/104.4kwMax Digging Depth20.7 ft in/6300 mmMax Reach Along Ground31 ft in/9460 mmMax Cutting Height30.5 ft in/9290 mmMax Loading Height20.6 ft in/6290 mmMax Vertical Wall Digging Depth18.5 ft in/5650 mmFor more details please feel free to contact me
For dismantling Common Piping Steel shoe(450mm) Rubber pad ROPS CAB Multi lever A/C Security key Side reinforcing cover Front guard Head guard Additional counter weight
Construction Equipments
Made in japan Year 2006 Working 2900 hours Very good working condition. Machinery location shanghai china 21t
Used construction machinery, excavators, dozers, cranes, backhoe loaders, access platforms, boom lifts, dumpers, telescopic handlers.
We can deliver construction equipment as per your requirement at your port.
Used construction equipment and machinery.
* PHOSCAST Phoscast : Phosphate Bonded Castables * PURPOSE customers using FBC boilers (Particularly underbed feed FBC boilers) for the protection of inbed coils against erosion potential by applying highly abrasive resistant refractory on inbed coils above fuel feed system. BACKGROUND * Two of such actions are providing special alloy studs on inbed coils and applying highly abrasive resistant refractory on the outer bottom loops of inbed Coils which are above the fuel feed nozzles. * GANESHAS has taken number of approaches to identify the key factors affecting erosion rates with an objective to enhance the life of inbed tubes as well as implementing the corrective action to reduce the erosion rates. Phosphate coatings are often used to protect steel parts against rusting and other types of corrosion * Erosion of inbed coils in fluid bed combustor is unavoidable phenomenon however the rate of metal wastage and thus the life of tubes depends on various factors like ash & fuel properties, design of Combustor / feeding system, flue gas velocities operating conditions etc. It has been also observed that maximum erosion prone inbed coils are those which come above fuel feed nozzles and an area of approximately 1 to 1.5 mts around fuel feed systems are badly affected. APPLICATION Phoscast-90 XR can be applied by ramming with wooden mallet having adequately large head @" dia x 5" length x 10â?? Jong handle). The desired lining or repair thickness is built up in several courses while ramming the mass to uniform thickness. Phoscast refractory should never be trawled to obtain smooth surface; ramming only should finish surface. Any excess mass is to be sliced off with trowel edge and then finished by ramming again for bed coil. Tube application of AFBC boiler, the material pasty mass should be finger pressed into the studs of the tube with maximum force. Finish should be given by pressing the hand palm against material applied, using surgical type thin rubber hand gloves.