We manufacture gensets for container chassis and containers COMPACT UNITS WITH LOW FUEL CONSUMPTION
Mining machinery, emerald gemstones.
Cnc Laser Machines.
Sale used & new construction equipment - Excavator : Doosan, Hyundai, - Attachments : Vibration hammer, scraper, crusher- - Cranes : all terrain cranes, crawler cranes, tower cranes, rough terrain cranes, truck - Concrete pump car
Tunnel mine locomotives, road-rail trucks and equipment, heavy machinery.Import, export and trading
Industrial equipments, satellite and telecom equipments, construction equipments, used plants, process plants, earth stations, DVB hubs.System integration and installation services
Marine heating ventilation air conditioning (hvac-marine).
Construction machinery parts like excavators, graders, trenchers, loaders.
We are supplier of used car parts and engines for all car models. We like to partner with car part dealers in all of Africa to supply from Netherlands to Africa. We look forward to your reply.
Heavy duty equipment like trucks, excavator, trailers, bitumen trailers, parts. .
Complete equipment for production of paper valve bags, consisting of:- Tuber with 3 color in-line printer Bottomer Slitter & winder Vacuum pumps / compressor / glue mixer (1m3) / trolley Tuber, manufactured by fischer & krecke (giant) - 3 colors in-line flexo, manufactured by w+h (alina 800) in 1989 - 3 inking stations, printing width max: 1270mm / printing length: 360 1350 mm - 1 to 3 layers - straight cut only - web guide by fife for 3 layers - tube width: 350 650 mm - tube length: 600 1200 mm Bottomer, manufactured in 1975 by w+h (ad2360/16) - for tube width: 300 700 mm - for tube length: 480 1400 mm - bottom width: 70 160 mm - 1 x flexoprint for each bottom patch Slitter & rewinder, manufactured in 1985 by la meccanica - working width upto : 1460 mm - max.Paper reel diameter : 1200 mm - five (5) sets for format parts complete All machine or equipment is offered as is where is with all faults without warranty and is subject to prior sales. All information provided in this offer is from the source(s), which is/are deemed reliable and trusted.
Kia and hyundai spare parts.Import and Export of products
Truck/trailer/busses/commercial vehicle parts.
3 or 4 cyl marine engines, marine engines.
Used construction machinery parts.
2 MILLION BARRELS (SPOT) WITH POSSIBLE CONTRACT BLCO TRANSACTION PROCEDURE FOR TTO DELIVERY: 1. Seller and Buyer sign and seal this contract including banking coordinates and exchange the signed copy by electronic mail. The electronic signed copy by both parties is considered legally binding and enforceable. 2. Buyer returns the signed copy with the ATB format (supercargo/inspector full boarding details). 3. Sellerâ??s vessel captain issues Marine ATB from his vessel domain according to buyerâ??s format via e-mail to buyer 4. Buyer issues Notarised/Confirmed Corporate Cheque of N200million which is cashable upon receipt of Attestation 5. Seller issues navy clearance through NNPC. 6. Upon both receipt and confirmation of ATB and Clearance by Buyer, Seller positions the vessel for Quantity and Quality analysis/test (QnQ). 7. Buyerâ??s Supercargo (must be NNPC registered) and a second Buyerâ??s Representative designatedsupercargo/Inspector go on board the sellerâ??s loaded vessel. If Buyerâ??s Supercargo/s is not NNPC Registered, Seller will pay the fees necessary to obtain temporary accreditation for the supercargo, on behalf of the Buyer. 8. Buyerâ??s supercargo confirms product and the vessel captain sends a confirmation/Attestation letter endorsed by the supercargo. 9. Upon receipt of Attestation, Buyer promptly wires N200,000,000.00 into Sellerâ??s Account 10. The Buyers Representative designated as supercargo/inspector, takes samples (total of 4 to 7 litres or as the Captain may allow), and disembarks from the vessel while the first supercargo remains on board until the completion of the TTO transaction. 11. Samples are sent to the laboratory (SGS OR INTERTEK) and Q&Q Report generated and sent to both Buyer and seller. Buyer issues a BG for total cargo, assuming a total volume of 2 million barrels. 12. Seller confirms the BG for total cargo. . 13. Final Q n Q Report is generated 14. Seller sends final commercial invoice (CI) to Buyer based on quantity of cargo. 15. Seller issues the full list of original copies of cargo documents** in the name of the off-taker nominated by the buyer. 16. Upon receipt of the cargo documents, Buyer makes payment for total cargo via MT103 less the N200,000,000 ($600,000). 17. Seller arranges for Buyer to talk to shipping company and take over vessel via charter party agreement. 18. Seller confirms payment for cargo made by swift via MT103 and pays commissions to all mandates & agents. Cost of payment transfer is borne by each individual/entity or Corporation 19. Buyer takes over vessel and sails to destination.
Truck and trailer parts.
Tyres, automotive parts.
Automotive items.
Shovel, excavator.