SH steelmaking arc furnace Usage : Steelmaking electric arc furnace inputs electric energy into furnace by graphite electrode. Electric arc producing between electrode tips and furnace burden is used as heat source to smelt steel. The heat source of electric arc furnace is electric energy. Atmosphere inside the furnace can be adjusted, which is helpful to melt steels containing easier oxidation of elements. SH series three-phase steelmaking arc furnace is used to smelt high-quality carbon steel and all kinds of ferro-alloy steel. The designed volume is from 0.5-150t. And the rate power of transformer can reach 120 MVA. Constitution: Electric arc furnace transformer, short net, electrode lifting device, current conducting arm, furnace lid, furnace lid lifting and rotary device, furnace body, furnace titling device, ladle cart, water cooling system, compressed air system, hydraulic system, charging system, high voltage electric system, low voltage electric control system, basic automation and computer control system.
SH steelmaking arc furnace Usage : Steelmaking electric arc furnace inputs electric energy into furnace by graphite electrode. Electric arc producing between electrode tips and furnace burden is used as heat source to smelt steel. The heat source of electric arc furnace is electric energy. Atmosphere inside the furnace can be adjusted, which is helpful to melt steels containing easier oxidation of elements. SH series three-phase steelmaking arc furnace is used to smelt high-quality carbon steel and all kinds of ferro-alloy steel. The designed volume is from 0.5-150t. And the rate power of transformer can reach 120 MVA. Constitution: Electric arc furnace transformer, short net, electrode lifting device, current conducting arm, furnace lid, furnace lid lifting and rotary device, furnace body, furnace titling device, ladle cart, water cooling system, compressed air system, hydraulic system, charging system, high voltage electric system, low voltage electric control system, basic automation and computer control system.
Construction: Steelmaking arc furnace inputs electric energy into furnace by graphite electrode. Electric arc producing between electrode tips and furnace burden is used as heat source to smelt steel. The heat source of electric arc furnace is electric energy. Atmosphere inside the furnace can be adjusted, which is helpful to melt steels containing easier oxidation of elements. Sh series three-phase steelmaking arc furnace is used to smelt high-quality carbon steel and all kinds of ferro-alloy steel. The designed volume is from 0.5-150t. And the rate power of transformer can Equipment constitution Purpose: Electric furnace transformer, short net, electrode lifting device, current conducting arm, furnace lid, furnace lid lifting and rotary device, furnace body, furnace titling device, ladle cart, water cooling system, compressed air system, hydraulic system, charging system, high voltage electric system, low voltage electric control system, basic automation and computer control system. Main parameter and chosen type Container
This Cast Iron slag is a by-product derived from the production of thermal insulating products. The byproduct is a ferrous slag which can be utilised in an electric arc furnace to produce crude steel. Physical Description On visual inspection, it appears to be made up of irregular shapes. Dimension: 500mm -800mm Chemical Composition Its chemical composition is homogeneous and stable with Fe contents in the range of 90 +/- 5% and P contents < 0.6% S around 0.15% and C% around 3.5%. Packing: Loose in container Loading: in 20 Container For further information, please feel free to contact us.
High impedance electric arc furnace Usage: It is used to melt plain steel, high-quality carbon steel and kinds of alloy steel. It's used to scrap steel operation, scrap steel and molten iron charging operation, scrap and pellet, pre-heating scrap, hot-pressing reduced iron, sponge iron, etc. Features: The primary loop series reactor can improve the system impedance to realize the secondary higher voltage. It operates with long arc and low current. The electric arc is stable and the arc power is high. Various performance indicators approach direct current arc furnace. On-load voltage regulation is adopted during the operation of arc furnace. The structure of furnace body is frame type water cooling structure. The furnace shells up and down can be taken down. Proportional value is used to control electrode lifting, the rotary of furnace lid and the furnace body tilting. This device is installed with the whole set PLC system and computer control system, computer image monitoring system and neuron network artificial intelligent electrode control adjustment system. The device is also set with oxygen lance of furnace door, speed oxygen lance of furnace wall, burner and carbon injection system. Constitution: furnace body, tilting device, electrode lifting device, furnace lid lifting and rotary device, cooling water and its alarming display device, hydraulic station, compressed air system, feeding system, high-voltage switch system, transformer, series reactor, low-voltage power supply system, computer control system and picture monitoring system, neuron network artificial intelligent electrode control adjustment system. Main performance parameter: Smelting period/tap-to-tap cycle: 60min (ultra high power) Power consumption: ?¤ 380 KWh/t (scrap) Consumption of electrode ?¤ 2.5Kg/t (scrap) Service life of water cooling furnace wall ?¥ 3500 ( per furnace) The average oxygen consumption: 25-50 M3/t
Pig Iron for sale at high quantities from India. Payment Term - LC For price and specification. This Pig Iron slag is a by-product derived from the production of thermal insulating products. The byproduct is a ferrous slag which can be utilised in an electric arc furnace to produce crude steel. Physical Description On visual inspection, it appears to be made up of irregular shapes. Dimension: 300mm -1000mm Chemical Composition Its chemical composition is homogeneous and stable with Fe contents in the range of 85 +/- 5% and P contents < 0.8% S around 0.15% and C% around 3.5%. Packing: Loose in container Loading: in 20 Container.
We are supplier of Reinforcement Bars. can supply REBARS as per below: -Size: 6mm to 50 mm -Length: 6 meters up to 16 meters -Packing: Once folded bundles available. hese corrugated steel bars are used as tension devices in the construction of concrete slabs and walls, as well as decorative/ornamental grille work. When used in concrete constructions, these help to strengthen and hold concrete when it is compressed, and come in a wide variety of sizes to fit various building construction needs. At ARC. AVAILABLE IN 3/8 (10mm), 5/8 (16mm), (20mm), (12mm), 1 (25mm) and 1 (32mm)
ITO GLOBAL, SALE OFFER ZINC ASH ,Product: Furnace Plant Material Zinc Ash, 35-40% basis. Origin: INDIA Quantity: 500 t Trial; 10,00 ton per month thereafter with possibility to increase. Contract Period: 12 Months. PAYMENT TERMS: Letter of Credit 100% LC Confirmed and Irrevocable, Non-Transferable and Indivisible. Payable At Sight at the Port of Loading against boarding documents. PERFORMANCE BOND: 2% Performance Bond to be issued by Seller to Buyer on issue of DLC. DELIVERY CONDITIONS (INCOTERMS): FOB INDIA or CIF AWSP Buyer choice PACKAGING: Bulk. Shipments are initiated 30 days after confirmed DLC. PROCEDURES: 1. Seller issues FCO. 2. Buyer signs FCO on acceptance and submits ICPO / LOI. 3. Buyer returns signed and stamped FCO. 4. Seller issues Contract with full banking details. 5. Buyer and Seller sign and exchange contracts. 6. Seller provides Proof of Product &/or Buyer conducts a site Visit to verify goods and local conditions. 7. Buyer's Bank opens Letter of Credit. 8. Shipment commences as per contract.
ITO GLOBAL, SALE OFFER ZINC ASH / EAF DUST ,Product: Furnace Plant Material Zinc Ash, 35-40% AND 40-45% basis. Origin: INDIA Quantity: 100 ton Trial; 1000 ton per month thereafter with possibility to increase. Contract Period: 12 Months. PAYMENT TERMS: Letter of Credit 100% LC Confirmed and Irrevocable, Non-Transferable and Indivisible. Payable At Sight at the Port of Loading against boarding documents. PERFORMANCE BOND: 2% Performance Bond to be issued by Seller to Buyer on issue of DLC. DELIVERY CONDITIONS (INCOTERMS): FOB INDIA or CIF AWSP Buyer choice PACKAGING: Bulk. Shipments are initiated 30 days after confirmed DLC. PROCEDURES: 1. Seller issues FCO. 2. Buyer signs FCO on acceptance and submits ICPO / LOI. 3. Buyer returns signed and stamped FCO. 4. Seller issues Contract with full banking details. 5. Buyer and Seller sign and exchange contracts. 6. Seller provides Proof of Product &/or Buyer conducts a site Visit to verify goods and local conditions. 7. Buyer's Bank opens Letter of Credit. 8. Shipment commences as per contract.
Carbon fish meat grill oven process: A. special high temperature resisitant material,high heat deformation,the overall structure uses professtional plate ; B.all into oxygen at the bottom of the damper desigh,fast burning heat rapidly ,at teh top of the air valve design,effective control of heat loss; C. origianl putty separation technology,completely avoiding using process because of the putty mixed soot and open flame,ensure clean,health and safety ; D.equipment applied double high temperature heat insulation material,insulation system,insulation with security,external direct touch with no hidden dangers. Operation method: A. all burning charcoal in the burning charcoal ,open at the top the smooke at the bottom of the mouth and damper; B.charcoal burning closed 10 minutes to the degree of smoke-free smoke at the top of the mouth,the heat; C.after the temperature reaches the standard,in the baking objects to buy object ; D.5-10minutes,bake fish until brown on both sides,are taken from the furnace, the plate feeding . Equipment advantages : A. unique design principle ,the use of charcoal smoke all gathered in the grilled fish inside furnace,through the top of the exhaust pipe directly emitted; B.rapid heat,guarantee the production speed,let the charcoal furnace cavity fully burning rapied heating up,wind valve,and through the top to the bottom of the design of air supply outlet temperature in the furnace in a 300-350 degree,put the fish in the distribution on the stove on content cabinet ,only 8-10 minutes can be produced; C. a novel view and admire a gender ,the design of the gear type appeared in front of customers,the grilled fish process more transparent,more ornamental ,fish and clients directly face to face "communication " ; D this design flexibility ,the real achieve a multi-purpose furnace, can bakering chicken duck cattle and sheep for equipment use diversification more rich . Fuel: dual-use carbon box ,burning charcoal or alcohol (vegetable oil ) ,pump design. Installation and commissioning Overall production : have direct admission requiements,no installation commissioning ,one pace reachs the designated position . 1.Solve the smoke problem charcoal grilled fish we are familiar with most of the fish appeared in the night street food stalls ,a rectangular fish furnace ,a big fan, the air is filled with smoke smell fish .
High impedance electric arc furnace Usage: It is used to melt plain steel, high-quality carbon steel and kinds of alloy steel. It's used to scrap steel operation, scrap steel and molten iron charging operation, scrap and pellet, pre-heating scrap, hot-pressing reduced iron, sponge iron, etc. Features: The primary loop series reactor can improve the system impedance to realize the secondary higher voltage. It operates with long arc and low current. The electric arc is stable and the arc power is high. Various performance indicators approach direct current arc furnace. On-load voltage regulation is adopted during the operation of arc furnace. The structure of furnace body is frame type water cooling structure. The furnace shells up and down can be taken down. Proportional value is used to control electrode lifting, the rotary of furnace lid and the furnace body tilting. This device is installed with the whole set PLC system and computer control system, computer image monitoring system and neuron network artificial intelligent electrode control adjustment system. The device is also set with oxygen lance of furnace door, speed oxygen lance of furnace wall, burner and carbon injection system. Constitution: furnace body, tilting device, electrode lifting device, furnace lid lifting and rotary device, cooling water and its alarming display device, hydraulic station, compressed air system, feeding system, high-voltage switch system, transformer, series reactor, low-voltage power supply system, computer control system and picture monitoring system, neuron network artificial intelligent electrode control adjustment system. Main performance parameter: Smelting period/tap-to-tap cycle: 60min (ultra high power) Power consumption: ?¤ 380 KWh/t (scrap) Consumption of electrode ?¤ 2.5Kg/t (scrap) Service life of water cooling furnace wall ?¥ 3500 ( per furnace) The average oxygen consumption: 25-50 M3/t
High impedance electric arc furnace Usage: It is used to melt plain steel, high-quality carbon steel and kinds of alloy steel. It's used to scrap steel operation, scrap steel and molten iron charging operation, scrap and pellet, pre-heating scrap, hot-pressing reduced iron, sponge iron, etc. Features: The primary loop series reactor can improve the system impedance to realize the secondary higher voltage. It operates with long arc and low current. The electric arc is stable and the arc power is high. Various performance indicators approach direct current arc furnace. On-load voltage regulation is adopted during the operation of arc furnace. The structure of furnace body is frame type water cooling structure. The furnace shells up and down can be taken down. Proportional value is used to control electrode lifting, the rotary of furnace lid and the furnace body tilting. This device is installed with the whole set PLC system and computer control system, computer image monitoring system and neuron network artificial intelligent electrode control adjustment system. The device is also set with oxygen lance of furnace door, speed oxygen lance of furnace wall, burner and carbon injection system. Constitution: furnace body, tilting device, electrode lifting device, furnace lid lifting and rotary device, cooling water and its alarming display device, hydraulic station, compressed air system, feeding system, high-voltage switch system, transformer, series reactor, low-voltage power supply system, computer control system and picture monitoring system, neuron network artificial intelligent electrode control adjustment system. Main performance parameter: Smelting period/tap-to-tap cycle: 60min (ultra high power) Power consumption: ?¤ 380 KWh/t (scrap) Consumption of electrode ?¤ 2.5Kg/t (scrap) Service life of water cooling furnace wall ?¥ 3500 ( per furnace) The average oxygen consumption: 25-50 M3/t
Raw melting material - aluminum scraps, cans, engine waste etc. Output capacity - 5-30 tons/h, customized Automation - Full automatic/ half automatic (based on output requirement and investment budget Ingot type - ADC12 (7.5kg/ 10kg / customized) 1. After cleaning the oil and grease of waste aluminum, manually put it into the furnace with a forklift; 2. Ignition for melting furnace .Heat up to 680C, and input appropriate proportion of alloy elements. Heat up to 800C, melt and stir evenly, then fetch samples to the spectrometer for testing. Every lot of production need to do testing . 3. Put A tool that attracts iron into the furnace by forklift, to suck away the iron in the aluminum water. 4. Put the slag agent into Alu liquid to remove the slag. After slag removed , put the slags into Aluminum ash separation machine , and let the aluminum water and ash separate. The proportion of slag agent and aluminum liquid is 1:500 5.Open the drain valve and the aluminum water flows automatically to the ingot production line After the ingot casting is completed, the ingot stacking robot will stack the ingots, which means the production is completed.
Construction: Steelmaking arc furnace inputs electric energy into furnace by graphite electrode. Electric arc producing between electrode tips and furnace burden is used as heat source to smelt steel. The heat source of electric arc furnace is electric energy. Atmosphere inside the furnace can be adjusted, which is helpful to melt steels containing easier oxidation of elements. Sh series three-phase steelmaking arc furnace is used to smelt high-quality carbon steel and all kinds of ferro-alloy steel. The designed volume is from 0.5-150t. And the rate power of transformer can Equipment constitution Purpose: Electric furnace transformer, short net, electrode lifting device, current conducting arm, furnace lid, furnace lid lifting and rotary device, furnace body, furnace titling device, ladle cart, water cooling system, compressed air system, hydraulic system, charging system, high voltage electric system, low voltage electric control system, basic automation and computer control system. Main parameter and chosen type Container
Product introduction: Calcium is a silvery white metal that is harder and heavier than lithium, sodium, and potassium; It melts at 815 C. The chemical nature of metallic calcium is very active. In the air, calcium is quickly oxidized and masked with an oxide film. When heated, calcium will burn and emit a beautiful glow of brick red. Calcium and cold water have a slower effect, and intense chemical reactions occur in hot water to release hydrogen (lithium, sodium, and potassium can cause intense chemical reactions even in cold water). Calcium is also easily combined with halogens, sulfur, nitrogen, and the like. 1,product name:calcium metal 2,Shape :powder, lump and granulates 3,CAS:7440-70-2 4,Density:1.54g/cm 5,Melting point:850C 6,Boiling point:1440 C(lit.) 7,Application:Wheel keel Product use: At present, in the steel industry, the main use of metal calcium is to process into metal calcium particles, and then to make calcium iron wire or pure calcium wire, and finally used for steel refining outside the furnace, its role is to desulfurization, deoxidation, increase the fluidity of molten steel. Promote the rapid rise of inclusions in molten steel, generally used in the production of high-quality steel; as a dehydrating agent to produce anhydrous alcohol; in the petroleum industry, as a desulfurizing agent, in the metallurgical industry, it is used to deoxidize or desulfurize . However, calcium compounds have a very wide range of uses, especially in the construction industry.
1. Shaft furnace holding furnace up and down launder feeding device hydraulic transmission unit of holding furnace. 2. Shaft furnace holding furnace premixed burner of up and down launder include the control system multistage pressure blower system on-line automatic sampling controlled by plc co continuous automatic detecting system. Melting speed:6-20t/h Start time of melting:
KHODIYAR INDUSTRIA PVT LTD is an ISO-9001:2015 certified Hot Forging & Machined Components manufacturing facility produce all grades of Brass, Copper & Alloys, Aluminium & Alloys, Carbon Steels, Alloy Steels & Stainless Steel in the weight range of 50 GMS to 35KG as a single part to suit your production requirements. We were established in 2014 & produce Forged & Machined components for OEMs in Heavy Engineering, Pump, Valve, Wind turbine, Automotive, Electrical, Aerospace Industry, Oil, Power & Gas, Material Handling, Construction & Mining Equipments, Defense etc., to list a few applications. Our Forge shop includes : a. 100 MT Screw Press Product weight:0.050 0.500 Kgs. + Equivalent Trimming Press (40 MT) b. 200 MT Screw Press Product Weight: 0.100 Kg to 2.000 Kgs. + Equivalent Trimming Press (75 MT) (Non-Ferrous 4 Kg.) c. 300 MT Screw Press Product Weight: 0.100 Kg to 3.000 Kgs. + Equivalent Trimming Press (100 MT) (Non-Ferrous- 5 Kgs.) d. 1 Ton Drop Hammer & 2 Drop Hammer e. Furnace : Oil, Electric, Gas & Coal. MACHINE SHOP 1. Vertical Machining center - BFW ( 800*550*500 MM ) BED SIZE with 4th axis 2. Vertical Machining center - HAAS make ( 800*550*500 MM ) BED SIZE with 4th axis & 3. Turning centers - up to 350 MM DIA. Jobs can be turned
High-quality green petroleum coke is taken into Acheson furnace for graphitization process with temperature around 2500-3600 �°C.The product has higher degree of graphitization with nitrogen content is lower than 300ppm.This product, with lower sulpur and ash content, is ideal recarburizer for steelmaking and foundry industries. Fixed carbon 99% min. Sulphur 0.03% max. Ash 0.5% max. 0.7% max. 1% max. 1% max. Volatile matter 0.5% max. 0.8% max. 1% max. 1% max. Moisture 0.5% max. 0.5% max. 0.5% max. 0.5% max. Size(mm) 1-3/1-5 1-5/5-10 0.2-1 0-0.5 2 HQ-GPC-02 98.5% min. 0.05% max. HQ-GPC-03 98% min. 0.07% max. HQ-GPC-04 98% min. 0.1% max. ä¸? è??楺碳表 HENGGIAO CARBON Semi-graphite Petroleum Coke(SGPC) Semi GPC is from the insulation layer of acheson furnace. The graphitization temperature is in the range of 1700-2500 C.It belongs to the medium temperature graphitization product. It is economical recarburizer with high fixed carbon, lower sulphur content, fast dissolution rate and high absorption rate.
Semi GPC is from the insulation layer of acheson furnace. The graphitization temperature is in the range of 1700-2500 C.It belongs to the medium temperature graphitization product. It is economical recarburizer with high fixed carbon, lower sulphur content, fast dissolution rate and high absorption rate. Item HQ-SGPC-01 Fixed carbon Sulphur 98.5% min. 0.1% max. Ash 0.7% max. Volatile matter Moisture Size(mm) HQ-SGPC-02 98.5% min. 0.2% max. 0.7% max. HQ-SGPC-03 98.5% min. 0.3% max. 0.7% max. HQ-SGPC-04 98% min. 0.5% max. 1% max. HQ-SGPC-05 98% min. 0.8% max. 1% max. 0.8% max. 0.5% max. 0.8% max. 0.5% max. Graphite Electrode Scrap(GES) Item Fixed carbon Sulphur Ash HQ-CPC-01 98.5% min. 0.5% max. 0.7% max. HQ-CPC-02 98.5% min. 0.8% max. 0.7% max. HQ-C PC -03 98.5% min. 1% max. 0.5% max. HQ-CPC-04 98.5% min. 2% max. 0.5% max. HQ-CPC-05 98.5% min. 3% max. 0.5% max. Size(mm) 1-3/1-5 1-5/30-60 1-3/5-20 1-5 0-2 Item Fixed carbon Sulphur Ash Volatile matter Moisture Size (mm) HQ-GES-01 99% min. 0.03%max. 0.5% max. 0.5% max. 0.5%max. 1-5 HQ-GES-02 98.5% min. 0.05%max. 0.7% max. 0.8% max. 0.5%max. 0.2-1 * Other sizes and specifications are available,please enquire - HENGQIAOCARBON 1% max. 1% max. 0.5% max. 0.5% max. 0.8% max. 0.5% max. 1-5 3-8 1-5 1-5 1-5 Green petroleum coke 144 shaft kiln for petcoke calcined 1% max. 0.5% max. Crush Sieving Packing Volatile matter Moisture 0.8% max. 0.5% max. 0.8% max. 0.5% max. 1% max. 0.5% max. 1% max. 0.5% max.
Silicon carbide si made from hte mixture of pure silica sand and green petroleum coke in ultra high power acheson furnace. Electric current is passed through t h e conductor,bringing about a chemical reaction ni which the carbon ni the coke and silicon ni the sand combined ot form SIC and carbon monoxide gas. Silicon carbide si With annual capacity for 60,000 tons of silicon carbide, we can provide different grade of silicon carbide to meet different clients' requirements, such as 70% SIC, 80% SIC, 85% SIC, 90% SIC, 93% SIC and 98% SIC, etc.We also provide customized size for 90% SIC and 98% SIC, such as 200 mesh and 325 mesh Fe203 Al203 Free carbon 3,5%MAX Moisture Size(mm) Ha-SIC-01 90% min. 1.5% max. 15.% max. 35.% max. 0.5% max. 1-5/1-10 HQ-SIC-02 90% min. 1.5% max. 1.5% max. 3.5% max. 0.5% max. 0-10 HQ-SIC-03 88% min. 1.5% max. 1.5% max. 3.5% max. 0.5% max. 0-1/1-10 HQ-SIC-04 98% min. 0.6% max. 0.6% max. 0.2% max. 0.5% max. 0-1/1-3 HQ-SIC-05 70% min. 2% max. 1% max. 10% max. 0.5% max. 1-10