ltrasonic Welding Technology
It is produced with the latest technology fully automatic machines in Aegean mask quality.
Nose Clip
It takes the shape of the nose easily.
It does not cause any problems even with multiple uses.
It is aesthetically hidden compartment.
Since it is in the hidden compartment, it does not create additional risk in terms of occupational safety.
Filter Material
It has ultra thin and light fiber structure.
It has high filtration efficiency.
Provides low breathing / exhalation resistance.
Headband
It does not cause allergies.
It does not contain latex.
It is a circular shape.
It does not lose its elasticity even in multiple uses.
It is resistant to breaking and abrasion.
The headband is colored according to the protection class to facilitate use and control.
Ultrasonic Welding Technology
It is produced with the latest technology fully automatic machines in Aegean mask quality.
Nose Clip
It takes the shape of the nose easily.
It does not cause any problems even with multiple uses.
It is aesthetically hidden compartment.
Since it is in the hidden compartment, it does not create additional risk in terms of occupational safety.
Filter Material
It has ultra thin and light fiber structure.
It has high filtration efficiency.
Provides low breathing / exhalation resistance.
Headband
It does not cause allergies.
It does not contain latex.
It is a circular shape.
It does not lose its elasticity even in multiple uses.
It is resistant to breaking and abrasion.
The headband is colored according to the protection class to facilitate use and control.
Item No.: FFP3 Q5
Material: Meltblown cloth + non-woven cloth
Regular color: white (many colors)
Weight: 12 (g)
Packing method: single OPP, 30 pcs in color box
Mask style: ear strap wear
Breathing valve device: No
Filtering effect: more than 99%
Executive standard: EN149:2001+A1:2009
Obtained certification: EU CE
Cover material: melt blown cloth non-woven cloth
Series: FFP3 series
Specification: 10.5*15cm
Packing: single opp packaging, 30 boxes in a box, 30 boxes in a box
Order number: Q5
Nose clip: built-in
Model: FFP3 folding
Main sales area:
Africa, Europe, South America, Southeast Asia, North America, Northeast Asia, Middle East
Product standard: EN149:2001+A1:2009
Executive standard number: EU CE0370
Folding method: horizontal folding
Footwear Type : Leather Sandal
Material : PU
Color : Brown
Occasion / usage : Casual Wear
Pattern : Plain
Ideal for : Ladies Casual wear
Sole Material : PU
Upper Material : PU
Heel Height : No Heel
Toe Shape : Round Toe
Flexibility : Flexible
Packaging Type : Pair
Country of Origin : Made in India
Women's Casual wear footwear
Size: UK 4 to UK 9, UK 3 to UK8
Color: Brown, D. Brown
MOQ: 36 pairs with color variation
Ocassion: Casual and Semi Formal
Upper Material: PU leather
Sole Material: PU
(Material of the sole can be customised including the shape of the toe if quantity is higher than MOQ)
Additional Information:
Delivery Time: Depends on the country
Packaging Details: Pairs of footwear Packed in box and further packed in Master Carton
Specifications: Standard Export Quality.
* Payment: By MT103/760
* Price/Commissions: Final price to Buyer is the Gross, including all commissions.
Commissions
* payment is then made by Seller, who carries out all commissions transfers.
* Contract: 12 Months with possible rollovers.
* Inspection: SGS or similar
CIF DLC or SBLC PROCEDURE
1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank
Statement or equivalent
2. Seller issues Sales and Purchase Agreement (SPA).
3. Buyer signs and returns SPA.
4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP.
5. Seller issues PPOP to Buyer including the following:
A. Copy of license to export issued by the Department of the Ministry of Energy.
B. Copy of approval to export issued by the Department of Ministry of Justice.
C. Copy of statement of availability of the product.
D. Copy of the refinery commitment to produce the product.
E. Copy of contract to transport the product to port
F. Copy of the port storage agreement
G. Copy of the charter party agreements to transport the product to the discharge port.
H. Tank Storage Receipt (TSR)
I. Q & Q by Current SGS report.
6. Buyers bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760
to Sellers fiduciary Bank account.
7. Seller issues 2% Performance Bond to Buyers bank.
8. Shipment Commences
9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller.
10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
Specifications: Standard Export Quality.
* Payment: By MT103/760
* Price/Commissions: Final price to Buyer is the Gross, including all commissions.
Commissions
* Payment is then made by Seller, who carries out all commissions transfers.
* Contract: 12 Months with possible rollovers.
* Inspection: SGS or similar
* CIF DLC or SBLC PROCEDURE
1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank
Statement or equivalent
2. Seller issues Sales and Purchase Agreement (SPA).
3. Buyer signs and returns SPA.
4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP.
5. Seller issues PPOP to Buyer including the following:
A. Copy of license to export issued by the Department of the Ministry of Energy.
B. Copy of approval to export issued by the Department of Ministry of Justice.
C. Copy of statement of availability of the product.
D. Copy of the refinery commitment to produce the product.
E. Copy of contract to transport the product to port
F. Copy of the port storage agreement
G. Copy of the charter party agreements to transport the product to the discharge port.
H. Tank Storage Receipt (TSR)
I. Q & Q by Current SGS report.
6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760
to Seller's fiduciary Bank account.
7. Seller issues 2% Performance Bond to Buyers bank.
8. Shipment Commences
9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller.
10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
* Quantity MIN 1,000,000 Barrels x 12 months with R/E
* Origin: Russian Federation
Specifications: Standard Export Quality.
* Payment: By MT103/760
* Price/Commissions: Final price to Buyer is the Gross, including all commissions.
Commissions
* Payment is then made by Seller, who carries out all commissions transfers.
*Contract: 12 Months with possible rollovers.
* Inspection: SGS or similar
* CIF DLC or SBLC PROCEDURE
1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank
Statement or equivalent
2. Seller issues Sales and Purchase Agreement (SPA).
3. Buyer signs and returns SPA.
4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP.
5. Seller issues PPOP to Buyer including the following:
A. Copy of license to export issued by the Department of the Ministry of Energy.
B. Copy of approval to export issued by the Department of Ministry of Justice.
C. Copy of statement of availability of the product.
D. Copy of the refinery commitment to produce the product.
E. Copy of contract to transport the product to port
F. Copy of the port storage agreement
G. Copy of the charter party agreements to transport the product to the discharge port.
H. Tank Storage Receipt (TSR)
I. Q & Q by Current SGS report.
6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760
to Seller's fiduciary Bank account.
7. Seller issues 2% Performance Bond to Buyers bank.
8. Shipment Commences
9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller.
10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
Specifications: Standard Export Quality.
* Payment: By MT103/760
* Price/Commissions: Final price to Buyer is the Gross, including all commissions.
Commissions
* Payment is then made by Seller, who carries out all commissions transfers.
Contract: 12 Months with possible rollovers.
Inspection: SGS or similar
* CIF DLC or SBLC PROCEDURE
1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank
Statement or equivalent
2. Seller issues Sales and Purchase Agreement (SPA).
3. Buyer signs and returns SPA.
4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP.
5. Seller issues PPOP to Buyer including the following:
A. Copy of license to export issued by the Department of the Ministry of Energy.
B. Copy of approval to export issued by the Department of Ministry of Justice.
C. Copy of statement of availability of the product.
D. Copy of the refinery commitment to produce the product.
E. Copy of contract to transport the product to port
F. Copy of the port storage agreement
G. Copy of the charter party agreements to transport the product to the discharge port.
H. Tank Storage Receipt (TSR)
I. Q & Q by Current SGS report.
6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760
to Seller's fiduciary Bank account.
7. Seller issues 2% Performance Bond to Buyers bank.
8. Shipment Commences
9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller.
10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
Specifications: Standard Export Quality.
* Payment: By MT103/760
* Price/Commissions: Final price to Buyer is the Gross, including all commissions.
Commissions
* payment is then made by Seller, who carries out all commissions transfers.
* Contract: 12 Months with possible rollovers.
* Inspection: SGS or similar
* CIF DLC or SBLC PROCEDURE
1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank
Statement or equivalent
2. Seller issues Sales and Purchase Agreement (SPA).
3. Buyer signs and returns SPA.
4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP.
5. Seller issues PPOP to Buyer including the following:
A. Copy of license to export issued by the Department of the Ministry of Energy.
B. Copy of approval to export issued by the Department of Ministry of Justice.
C. Copy of statement of availability of the product.
D. Copy of the refinery commitment to produce the product.
E. Copy of contract to transport the product to port
F. Copy of the port storage agreement
G. Copy of the charter party agreements to transport the product to the discharge port.
H. Tank Storage Receipt (TSR)
I. Q & Q by Current SGS report.
6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760
to Seller's fiduciary Bank account.
7. Seller issues 2% Performance Bond to Buyers bank.
8. Shipment Commences
9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller.
10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
Specifications: Standard Export Quality.
* Payment: By MT103/760
* Price/Commissions: Final price to Buyer is the Gross, including all commissions.
Commissions
* payment is then made by Seller, who carries out all commissions transfers.
* Contract: 12 Months with possible rollovers.
* Inspection: SGS or similar
* CIF DLC or SBLC PROCEDURE
1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank
Statement or equivalent
2. Seller issues Sales and Purchase Agreement (SPA).
3. Buyer signs and returns SPA.
4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP.
5. Seller issues PPOP to Buyer including the following:
A. Copy of license to export issued by the Department of the Ministry of Energy.
B. Copy of approval to export issued by the Department of Ministry of Justice.
C. Copy of statement of availability of the product.
D. Copy of the refinery commitment to produce the product.
E. Copy of contract to transport the product to port
F. Copy of the port storage agreement
G. Copy of the charter party agreements to transport the product to the discharge port.
H. Tank Storage Receipt (TSR)
I. Q & Q by Current SGS report.
6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760
to Seller's fiduciary Bank account.
7. Seller issues 2% Performance Bond to Buyers bank.
8. Shipment Commences
9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller.
10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
Specifications: Standard Export Quality.
* Payment: By MT103/760
* Price/Commissions: Final price to Buyer is the Gross, including all commissions.
Commissions
* Payment is then made by Seller, who carries out all commissions transfers.
* Contract: 12 Months with possible rollovers.
* Inspection: SGS or similar
* CIF DLC or SBLC PROCEDURE
1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank
Statement or equivalent
2. Seller issues Sales and Purchase Agreement (SPA).
3. Buyer signs and returns SPA.
4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP.
5. Seller issues PPOP to Buyer including the following:
A. Copy of license to export issued by the Department of the Ministry of Energy.
8 B. Copy of approval to export issued by the Department of Ministry of Justice.
C. Copy of statement of availability of the product.
D. Copy of the refinery commitment to produce the product.
E. Copy of contract to transport the product to port
F. Copy of the port storage agreement
G. Copy of the charter party agreements to transport the product to the discharge port.
H. Tank Storage Receipt (TSR)
I. Q & Q by Current SGS report.
6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760
to Seller's fiduciary Bank account.
7. Seller issues 2% Performance Bond to Buyers bank.
8. Shipment Commences
9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller.
10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
Specifications: Standard Export Quality.
* Payment: By MT103/760
* Price/Commissions: Final price to Buyer is the Gross, including all commissions.
Commissions
* payment is then made by Seller, who carries out all commissions transfers.
* Contract: 12 Months with possible rollovers.
* Inspection: SGS or similar
CIF DLC or SBLC PROCEDURE
1. Buyer issues ICPO, company registration, I.D. and Top World Bank redacted Bank
Statement or equivalent
2. Seller issues Sales and Purchase Agreement (SPA).
3. Buyer signs and returns SPA.
4. Buyer's Bank issues a RWA letter to guarantee to issue an instrument on behalf of the Buyer within three working days after receiving the following PPOP.
5. Seller issues PPOP to Buyer including the following:
A. Copy of license to export issued by the Department of the Ministry of Energy.
B. Copy of approval to export issued by the Department of Ministry of Justice.
C. Copy of statement of availability of the product.
D. Copy of the refinery commitment to produce the product.
E. Copy of contract to transport the product to port
F. Copy of the port storage agreement
G. Copy of the charter party agreements to transport the product to the discharge port.
H. Tank Storage Receipt (TSR)
I. Q & Q by Current SGS report.
6. Buyer's bank issues operative Letter of Credit DLC MT 700 or SBLC MT-760
to Seller's fiduciary Bank account.
7. Seller issues 2% Performance Bond to Buyers bank.
8. Shipment Commences
9. On getting to Buyer's port of discharge, the Buyer's inspection team board the vessel and perform an inspection. Buyer sends SGS report to Seller.
10. Seller provides shipping document and a master commercial invoice to Buyer, within 3 banking days, Buyer makes the payment in full via MT 103/TT to Seller's Bank account.
Ultrasonic Welding Technology
It is produced with the latest technology fully automatic machines in Aegean mask quality.
Nose Clip
It takes the shape of the nose easily.
It does not cause any problems even with multiple uses.
It is aesthetically hidden compartment.
Since it is in the hidden compartment, it does not create additional risk in terms of occupational safety.
Filter Material
It has ultra thin and light fiber structure.
It has high filtration efficiency.
Provides low breathing / exhalation resistance.
Headband
It does not cause allergies.
It does not contain latex.
It is a circular shape.
It does not lose its elasticity even in multiple uses.
It is resistant to breaking and abrasion.
The headband is colored according to the protection class to facilitate use and control.
Ultrasonic Welding Technology
It is produced with the latest technology fully automatic machines in Aegean mask quality.
Nose Clip
It takes the shape of the nose easily.
It does not cause any problems even with multiple uses.
It is aesthetically hidden compartment.
Since it is in the hidden compartment, it does not create additional risk in terms of occupational safety.
Filter Material
It has ultra thin and light fiber structure.
It has high filtration efficiency.
Provides low breathing / exhalation resistance.
Headband
It does not cause allergies.
It does not contain latex.
It is a circular shape.
It does not lose its elasticity even in multiple uses.
It is resistant to breaking and abrasion.
The headband is colored according to the protection class to facilitate use and control.
Ultrasonic Welding Technology
It is produced with the latest technology fully automatic machines in Aegean mask quality.
Nose Clip
It takes the shape of the nose easily.
It does not cause any problems even with multiple uses.
It is aesthetically hidden compartment.
Since it is in the hidden compartment, it does not create additional risk in terms of occupational safety.
Filter Material
It has ultra thin and light fiber structure.
It has high filtration efficiency.
Provides low breathing / exhalation resistance.
Headband
It does not cause allergies.
It does not contain latex.
It is a circular shape.
It does not lose its elasticity even in multiple uses.
It is resistant to breaking and abrasion.
The headband is colored according to the protection class to facilitate use and control.
386 Dex 700 Ffp3 Nr D Suppliers
Short on time? Let Dex 700 Ffp3 Nr D sellers contact you.