Please click here to check who's online and chat with them.

Find Verified Alstom 8163 4002 Suppliers, Manufacturers and Wholesalers

Sep-01-17

Alstom 8163-4002

$666.00
MOQ: Not Specified
 
ALSTOM 8163-4002

Name:Addy Lee
mailbox:addy@nseauto.com
phone:0086 18050035546
QQ:1920412918
Skype:8618050035546
WhatsApp:18050035546

We currently stock over 100+ branded products.
---Westinghouse:OVATIONN system, WDPF system, WESStation system card.
---Modicon: Quantum 140 Series processor, control card, Power module and so on.
---Rockwell Allen-Bradley: Reliance, SLC500/1747/1746, MicroLogix/1761/1763/1762/1766/1764, CompactLogix/1769/1768,Logix5000/1756/1789/1794/17 , 60/1788, PLC-5/1771/1785 and etc.
---Motorola: MVME162, MVME167, MVME1772 and MVME177 series.
---GE FANUC: Module, card, drive various kinds of spare parts,etc.
---Yaskawa: Servo controller, servo motor, servo driver, etc.
---Bosch Rexroth: Indramat, I/O module, PLC controller, drive module.
---Woodward: SPC valve position controller, PEAK15 digital controller.
---ABB: Advant OCS, ABB MOD 30/MODCELL, ABB MOD 300, ABB Procontic, ABB Procontrol
---Moore APACS, Moore Panel ControllersER
---Siemens Iskamatic
â??
IC693CPU311
IC693CPU313C
IC693CPU311J
IC693CPU331W
IC693CPU331AA
IC693CPU341
IC693CPU351
IC697CPU731R
IC697CPU771J
IC697CPU731X
IC697CPU780E
IC697CPU772L
IC697CPU732
IC697CPU771
IC697CPU781
IC697CPU772
IC697CPU782
IC697CPU782
IC697CPU731
IC693CPU323N
IC693CPU331
IC693CPU331W
IC693CPU311
IC693CPU363
IC693CPU341
IC693CPU331W
IC693CPU311T
IC693CPU340
IC693CPU340H
IC693CPU323N
IC693CPU311U
IC693CPU350
IC693CPU374
IC693CPU374
IC693CPU311
IC693CPU340G
IC693CPU340H
IC693CPU351
IC693CPU331
IC693CPU331Y
IC693CPU323V
IC693CPU331L
IC693CPU321B
IC693CPU350
IC693CPU340J
IC693CPU351
IC693CPU351
IC693CPU360
GOLD Member
Feb-21-25
Supplier From Busan, South Korea (Republic Of Korea)
 
We have 4sets of used Detroit generators that were used as emergency power sources (Standby only) at a municipal water drainage plant in Korea. Please review the attached documents and assess
ENGINE SPECIFICATION
ENGINE MODEL Detroit Diesel 8163-7416 1232HP
ENGINE NO. 16VF013546
RPM 1,800
Cylinder 16
Injection method Direct injection
Cooling method Water Cooled
Fuel consumption rate 246â??/h
GENERATOR SPECIFICATION (AC Generator, 3Ã??, 60Hz, Brushless type
Generator Model DIG 4800
Emergency output 990 kVA / 792 kW
Continuous output 900kVA / 720kW
Voltage and Current 600 v x 86.6 A
Revolution 1800RPM
Excitation Voltage/Current 65V/10A
Power Factor 80%
Insulation Class F
GOLD Member
Apr-13-22

Gas Spring Cold Drawn Seamless Steel Pipe

$1.8k
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Apr-13-22

4130 Steel Tube For Gas Spring

$1.8k
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Apr-13-22

Cold Rolled Carbon Seamless Steel Pipe

$1.8k
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
258 Alstom 8163 4002 Suppliers
Short on time? Let Alstom 8163 4002 sellers contact you.
GOLD Member
Apr-13-22

Gas Struts Bed Frame Gas Spring

$1.8k
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Apr-13-22

Seamless Steel Pipes

$1.8k
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Apr-13-22

Precision Seamless Steel Pipes For Gas Spring

$1.8k
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Apr-13-22

Cold Rolled Precision Seamless Steel Pipes

$1.8k
MOQ: 1  Metric Tonnes
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Dec-15-21

Gas Spring Pipe Made In Henson Metal

$1.38
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Dec-15-21

Steel Pipe For Machinery Bonnet Lift Piston Gas

$1.56
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Dec-15-21

Steel Pipe For Gas Spring Cheap

$1.38
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
Taian Henson Metal Co lTD
GOLD Member
Dec-15-21

Gas Spring Gas Spring Struts

$1.56
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Dec-15-21

Precision Steel Tube Used In Cylinder

$1.56
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Dec-15-21

Gas Tube High Quality Made In China

$1.56
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Dec-15-21

A192 Gas And Water Precision Seamless Tube

$1.38
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
GOLD Member
Dec-15-21

Precision Steel Pipe Tube For Gas Spring

$1.38
MOQ: 1000  Kilograms
Sample Available
Supplier From Taian, Shandong, China
 
High Precision Steel Pipe for Gas spring Cylinder
Type:Seamless and Welded Steel Tube
Roughness 0.1-0.8ra
Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020
Surface:Black/bright
Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101
Size :OD 3mm-140mm Thickness 0.5-20mm
Processing :Cold rolled /cold drawn
1. BK (+C) No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the upper
Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request.
Usage: Gas Spring Cylinder
VERIFIED
Jun-14-21

Alstom Relay

$2.0k
MOQ: Not Specified
 
Alstom Gbcdg21af001zmch
Obsoleted Model Ref.gbcdg21af101zmch
Obsoleted Model Ref.gbcdg21af101zmch
VERIFIED
Jun-14-21

Alstom Relay

$1.5k
MOQ: Not Specified
 
Alstom Gbcdg21af003zmch
Obsoleted Model Ref.gbcdg21af102zmch
Obsoleted Model Ref.gbcdg21af102zmch
VERIFIED
Jun-19-21

Alstom Relay

$1.5k
MOQ: Not Specified
 
Alstom Gbcdg61eg001zmch
Obs.replaced by Gbcdg61eg101zmch
Obs Model .replaced by Model List Gbcdg61eg101zmch
258 Alstom 8163 4002 Suppliers
Short on time? Let Alstom 8163 4002 sellers contact you.