Semiconductor grade silicon wafers with diameter 2" up to 6". One side or double side polished. Boron, Phosphorus, Antimony and Arsenic doped
This flip clock I made in the likeness of hours 1970. 1 pcs/lot.
Silicon ingots, silicon wafers.
Watches.
Handmade flip clocks.
Silicon ingots and wafers.
Women Fashion Apparel Like Casualwear & Office & Dresses, Blouses, Knitwear, Underwear, Accessories Like Bags, Jewellery, Sunglasses, Watches, PPE Kits Like Medical Masks, Thermometers, Nitrile Gloves.Worldwide Delivery
ORIGIN : TURKEY/VIETNAM PACKING : In 50 Kg Bags/BULK. SPECIFICATIONS: CEMENT - 42.5 R : Chemical Composition SILICON DIOXIDE (SIO2) 21.00 ALUMINIUM OXIDE (A12O3) 5.30 FERRIC OXIDE (FE2O3) 3.30 CALCIUM OXIDE (CAO) 65.60 MAGNESIUM OXIDE (MGO) 1.10 SULPHUR TRIOXIDE (SO3) 2.70 LOSS OF IGNITION (LOI) 0.90 TRICALCIUM SILICATE (C3S) 60.00 DICALCIUM SILICATE (C2S) 15.00 TRICALCIUM ALUMINATE (C3A) 8.05 TRICALCIUM ALUMINO FERRICE (C4AF) 9.76 CEMENT - 42.5 R : Physical and Mechanical Properties BLAIN CM2/GR 3.250 AUTOCLAVE EXPANTION 0.02 INITIAL SETTING TIME (VICAT) 105 MINUTES FINAL SETTING TIME (VICAT) 135 MINUTES @ 03 DAY'S 230 KG/CM2 @ 07 DAY 39 S 305 KG/CM2 COMPRESSIVE STRENGTH @ 28 DAY 39 S 420 KG/CM2 QUANTITY PRICE: SPOT CONTRACTS: 12,500 MT â?? USD 105.00/pmt 25,000 MT USD 104.00/pmt 50,000 MT USD 102.00/pmt 100,000 MT USD 100.00/pmt ANNUAL CONTRACTS: 150,000 MT USD 98.00/pmt 300,000 MT USD 95.00/pmt SMALL QUANTITES 500 MTS -8000 MTS @ FOB US$65.00 PMT VIETNAM/IRAN PORTS. ABOVE PRICES ARE MAJOR SEAPORTS AND NOT ISLAND PORTS. DESTINATION DELIVERY: Destination: CIF ASWP. Shipment: First Shipment in 30-45 Days and Rest in Every 30 Days after Receipt of Payment Instrument to the Sellers Bank. PAYMENT: By Irrevocable, Transferable Confirmed DLC 100% Payment at Sight for total Quantity from Top Western Prime Bank. INSPECTION: S.G.S Inspection for Quality and Quantity Service at Sellers Cost at Place of Loading. PROCEDURES: 1) Buyer issues a LOI + 2) Seller issues FCO 3) Buyer sign seal and return the FCO 4) Seller issues Draft Contract 5) Buyer sign, seal and return the Contract, seller sign the contract and return to the Buyer 6) Buyer Bank sends a DLC to the sellerâ??s Bank 7) Shipment Starts.