Please click here to check who's online and chat with them.

Find Verified Nickel Products Suppliers, Manufacturers and Wholesalers

Oct-20-11

Nickel Ore

$55 - $80
MOQ: Not Specified
Supplier From Sydney, NSW, Australia
 
Nickel ore 1.8-1.7 US$55 by LC US$55. Stable supply, supply up to 100, 000 tones/month. Port Kolaka, Sulawesi Indonesia.


50, 000 mt per vessel.
Dec-13-11

Nickel Ore

$60
MOQ: Not Specified
Supplier From Balikpapan, Kalimantan, Indonesia
 
We are selling nickel ore :
1.Ni 1.8-1.75
2.Ni 1.8-1.7
3.Ni 1.7-1.6

Payment by cash FOB MV 541. / Usance LC
Qty: - / + 50rb MT / monthSo if you seriously want to buy nickel ore please send us official LOI and draff contract complete data bank .
Nov-11-09
Supplier From Shenzhen, Futian, China
 
Ni content: 1.9 % Reject 1.8 % (below 1.8 % rejection but not include 1.80%)

SiO2: 45 % max
Fe (ferrum): 18 % max (above 20 % rejection)
P: 0.01 % max (above 0.01 % rejection)
H2O: 30 % max (above 32 % rejection)

Name: Nickel Ore
Packing: In bulk
Origin: Indonesia
Loading Port: Tambea’s Open Sea, One Safe Anchorage, Southeast Sulawesi, Indonesia
Stockpile and Barge Jetty: One Safe Anchorage Tambea’s Open Sea, Southeast Sulawesi, Indonesia
The approximate coordinates of the Ship’s anchorage point is:
Longitude: TBA
Latitude: TBA
Loading Rate:6,000mt PWWD SHINC.
Oct-07-11

Nickel Ore (No)

$50 - $80
MOQ: Not Specified
Supplier From Samarinda, Kalimantan Timur, Indonesia
 
1. price nickel ore 1.9%:US$80 (cash), 1.8%:US$79 and 1.6-1.7%:US$65 (all item is cash at place)
2. Please send to us your LOI with your price request.
3. delivery system is FOB Vessel or barge
4. Nickel Ore origin from midle sulawesi (pomala'a) of Indoensia.


Minimun required (MOQ) is 50.000 MT/month for long contract (mimimum 1 year).
We can serve until 150.000MT/month.
Sep-30-11
Supplier From Sorowako, Indonesia
 
NI or,$.060.00,00/m.ton
NI land for mining joint operation 007.00,00 Ni or /m.ton.

Ni or 55000.m.ton(fecel)
Ni land 55000 m.ton (fecel).
3066 Nickel Products Suppliers
Short on time? Let Nickel Products sellers contact you.
Aug-24-11

Nickel Ore

$53
MOQ: Not Specified
Supplier From Surabaya, East Java, Indonesia
 
Nickel ore from mining south east sulawesi-indonesia. We able supply 60.000 mt/month and long term contract 7 years up. We have area mining of 2.450 hectare specification ni 1.7 up .



Bulk in mother vessel.
Aug-06-11

Nickel Ore

$50.00K
MOQ: Not Specified
Supplier From Jakarta, Jakarta, Indonesia
 
QUANTITY :
Supply Capacity : 100.000 WMT/month
Loading Rate : 6.000 WMT/day

COMMODITY:
Ni Total : 1,95 % min.
Fe : 20 % min.
Phosphor : 0.01% max.
Sulfur : 0.1% max.
Moisture : 30% max.

PRICE:
Base on LME Price - FOB South Konawe District, Southeast Sulawesi Province - Indonesia.

PAYMENT:
For the fist time to build a mutual trust the Buyer shall arrange Down Payment US$ for securing shipment of 50,000 WMT after Mid of 2011 . The payment shall be made in US Dollars by Telegraphic Transfer (T.T.)

Delivery:
Loading Port : Torobulu Port, Kendari, South East Sulawesi, Indonesia.
Discharging port : ANY PORT IN CHINA
Apr-13-11
Supplier From Jakarta, Jakarta Selatan, Indonesia
 
Ni 1.8% and below origin Indonesia, Quantity 6000-50000 MT payment at cash or L/C 100% at sight. Buyer and company user only can have a deal with us not brokers.


In bulk.
Apr-20-10
Supplier From Bekasi, Jawa Barat, Indonesia
 
Up to 100,000 MT / Months
Nickel ore with specifications as follows:
Parameters Specification
Ni 1.8% +óGé¼GÇ£ 2.05% , 1.8% min.
Fe 9 - 15% , 18% max.
MgO 19 - 23%
CaO 0.30% max
SiO2 38 +óGé¼GÇ£ 46%
P 0.009% max



Terms and Condition :
1. FoB Port
2. L/ C 100%
3. Quality Check at discharging por
Apr-01-10
Supplier From Cebu, Philippines
 
Laterite nickel ore; manganese lumpy

Bulk
Dec-16-09
Supplier From Diy, Yogyakarta, Indonesia
 
We can supply nickel ore ni with quantity 2 x 50.000 mt per month with the following condition.
Ni total = 1.85%, reject below ni 1.80%
Fe total = 15% maximum
Sio2 = 45% max
P = 0.03 % maximum
Total moisture = 30% max
Prices = usd, , , .00/mt, fob any indonesia port or cfr main china port
Payment : irrevocable lc at sight (usance 30 days after sight) transferable from international prime bank.
Fist shipment = 30 days after received lc
Quantity = every month +/-300.000 mt
As attache we will sent copy past shipment and picture



Raw, 50-100.000 mt, bulk
May-26-09

Nickel Ore

$11.50
MOQ: Not Specified
 
Nickel ore,
Nickel ore 0.9 -1.1 %
Iron fe - 50 % min
Moisture - 35 % max.



50, 000 - 100 000 mt can be supplied regular basis.
Jun-03-08
Supplier From Cebu, Philippines
 
Nickel ores

Product: nickel ores from philippine supply
Specs:0.9% to 2.2%
Quantity:8 million mt a year
Terms:lc

In bulk
GOLD Member
Jan-21-23
Supplier From Valencia, Spain
Supplier Of Rapeseed Oil   |   Soybean   |   Coke   |   Coal   |   Tantalum Ore   |   Salt   |   Peas   |   Aluminum   |   Leather Shoes   |   Bituminous Coal   |   Avocado Oil   |   Limestone   |   Lentils   |   Fresh Cassava   |   Urea   |   Copper   |   Corn   |   Iron   |   Beans   |   Wheat   |   Chickpeas   |   Thermal Coal   |   Nickel   |   Fruit Pulp   |   Copper Cathode   |   Tantalum   |   Anthracite Coal   |   Copper Ore
Mar-26-22

Carbonyl Nickel Powder

$30
MOQ: Not Specified
 
Carbonyl Nickel powder T123 (FSSS 3.8-7.0 micron)- Origin: UK, Clydach - VALE International S.A.
Packing: original metallic drums of 200kg , 1.2T/pallets

Carbonyl Nickel powder T255 (FSSS 2.2-2.6 micron)- Origin: UK, Clydach - VALE International S.A.
Packing: original metallic drums of 75kg , 450kg/pallets
Mar-26-22

Free Flowing Nickel Powder

$30
MOQ: Not Specified
 
Nickel powder produced by hydrometallurgical process
Manufacturer: BHP Billiton
Origin: Australia
Typical:
Ni: 99.8%
-250 microns
Free flowing Nickel powder (Flowability 18s/50g)
Apparent density: 4.18 g/cm3

Packing: 250KG metallic drums
Dec-22-22

Nickel Ore

$165
MOQ: Not Specified
Supplier From Karachi, Sindh, Pakistan
 
Nickel Oxide Ore

Specifications: Ni 2.5% upto 4%, S under 1%

Quantity: 500tonnes to 10,000mt monthly.

Payment terms: 100% LC at sight payable 90% at Loading Port basis of Test reports and 10% at discharge port after inspection.

Packing: 1tonnes sling bags.

Price: Ask
Apr-12-22

Nickel Ore

$69
MOQ: Not Specified
Supplier From Talisay, Philippines
 
FOR SALE
NICKEL ORE
1.2%
1.6% = 69USD/MT
ORIGIN Philippines
Monthly capacity = 80,000mt
Feb-17-22

Laterite Nickel Ore

$39
MOQ: Not Specified
Supplier From Muscat, Oman
 
Laterite Nickel Ore:
Quantity available: 200K MT monthly
Payment Terms: FOB + LC basis

SGS report:
Hematite ore (Fe2O3) 57.4%
Nickel Oxide (NiO) 1.35%
Alumina (Al O ) 5.9%
Silicas (SiO2) 21.78%

Looking for long term contracts.
Dec-17-21
 
Product name:
Sequin Precision Polishing Noise Nickel Plating Blades Spinner
Color:
Sliver,Golden
Material:
Metal
Package:
Carton box
Size:
28*21*2.9 mm,23*17.7*3.17 mm,31.6*24*3.5 mm,17.6*13.5*2.2 mm
Keywords:
Spinner Blades,Fishing products
MOQ:
500pcs
Feature:
Spinner Blades
3066 Nickel Products Suppliers
Short on time? Let Nickel Products sellers contact you.