Available quantity of tires is right now 691 pcs.There is no problem of filling the whole container. We offer quantity discount with a larger purchase of goods If you are interested, please do not hesitate to contact me at:
BULK or CONTAINERS
Spare parts, toyota spare parts, toyota, armored vehicles, original car parts, car tires, toyota land cruiser 200 vehicles.
Daewoo logs, lumber, tires new & used, cars, spare parts .
Used tyres.
Used tires, chips.
Disassembled Spare Part From Toyota Land Cruiser 200
Used tyre, used clothes, recycling plastic chips.
Polyester putties, acrylic fillers and lacks, protective coatings for automotive repair industry.
Manufacturer of AdBlue for motor vehicles made of synthetic urea meeting EURO 5 standards. - Current production capacity - 50.000 litres /day - By the end of 2022 we will install another production line with a capacity of 150,000 litres/day
Auto spare parts.
Auto spare parts, CNC machinary.
Genuine o.e.m. spare parts of the renault, psa group (peugeot & citroen), opel / vauxhall automobile gmbh, renault trucks, volvo trucks. direct contract holder for supplying spare parts of the renault, psa group (peugeot & citroen), opel / vauxhall automobile gmbh, renault trucks, volvo trucks..
Rubber granules, chips, shredded, baled tires, steel wire.
Flexible packaging products, leno mesh bags, jumbo bags/big bags/ton bags/bulk bags/fibc's, pe bags and pe liners, small pp bags., butcher bags/garbage bags, flexible lining products, warning mat/warning tape/caution tape/caution mat/, cable protection covers/detectable warning tapes., geo textiles and geo bags, other products, hdpe/pp extrusion sheets, hdpe t rib liners.
Engine Oil Shell, Mobil.
Jp54 and d6 fuel oil.
This VWT-FFS-4372 Double Loop tunnel construction and its technology equipment are optimized for a professional use of sportsmen, army troop as well as general public and schools. Optimization of the fan can be performed on any other scenario of the use of the tunnel (like only sport tunnel utilization, or only to tourism utilization, military and special training purposes, or eventual their combination...). Optimization means a proper selection of tunnel dimensions, fans and engines parameters for proposed purposes to gain an optimal ratio between desired performance and operational costs. Dimensions and technical parameters of this tunnel offer the best conditions for the professional requirements on speed, space and height. Its size provides ample space for the entire training even of group formations of eight skydivers. Tunnel with 4,3 m of flying chamber diameter is the perfect place for training of army parachutes and special troops with their specific equipment. From tourist's point of view, the tunnel offers comfortable space even for flying couples with instructors or other smaller groups. Thanks to a comprehensive fan optimization the, tunnel allows operation of profi-flights as well as fun-flights at very low operation costs. Materials and Dimensions Air conductors in the aboveground part of the tunnel are made of sheet steel. All steel elements are provided with corrosion protection. Tunnel skin is made by sound-insulation panels KINGSPAN. Net dimensions of the tunnel are: width 30 m depth 10 m height 32 m The typical depth of foundation of ground concrete structure is 7,5 m. The typical height of the tunnel above the ground is 24 m. Flight chamber Flight chamber consists of a glass part, which is on its top connected to a steel construction of tunnel shell. Lower part of the flight chamber is purely cylindrical with a diameter of 4,3 m and a height of 5 m. The upper part of a flight chamber is made from steel and its height is 9 m. The shape of this part of flight chamber is gradually changing from a circular diameter of 4,3 meters to circular diameter 4,3 x 4,3 m. The overall maximum height of flight chamber 14 m The height of the glass part of flight chamber 5 m Diameter of flight chamber 4,3 m Maximum speed Maximum air speed at which the tunnel can be operated continuously is 80+ m/s (300+ km/h). Motors, fans and electronic equipment The air stream is formed by four vertically stored fans, each of 3.15 m in diameter, which are powered by a 4 electro-motors, each rated at 355 kW. RPM are controlled and regulated by 4 frequency changers from ABB. Control and monitoring system of the tunnel is realized using SIEMNS technology. Cooling Tunnel cooling is provided by an active cooling unit with a maximum power consumption of 330 kW, which corresponds to a maximum cooling performance of 1 000kW. Cooling compressor unit is located outside the tunnel and two pairs of optimized coolers installed in the tunnel design ensures a comfortable temperature in the flight chamber even during very warm summer period. During cold seasons, from the certain threshold temperature, the compressor unit is automatically switched to dry coolers, which maximize utilization of outside cold air and rapidly decrease the power consumption (up to 30 kW). -------------------- Offered price represents VWT-FFS-3672 /3.6m , double loop technology ,FOB Cz Praha 20x22ft containers
Building material, decoration material, textile material, used clothing, furniture, office equipment, construction machinery, used automotive /automotive parts, clothing apparels, tissue paper & tissue holder, tissue paper, baby wet tissue, electrical, and electronics products, computer accessories, used products.Export
Engine Oil And Lubricants.