Mini crane, manipulator, suction cup, outboard.
This VWT-FFS-4372 Double Loop tunnel construction and its technology equipment are optimized for a professional use of sportsmen, army troop as well as general public and schools. Optimization of the fan can be performed on any other scenario of the use of the tunnel (like only sport tunnel utilization, or only to tourism utilization, military and special training purposes, or eventual their combination...). Optimization means a proper selection of tunnel dimensions, fans and engines parameters for proposed purposes to gain an optimal ratio between desired performance and operational costs. Dimensions and technical parameters of this tunnel offer the best conditions for the professional requirements on speed, space and height. Its size provides ample space for the entire training even of group formations of eight skydivers. Tunnel with 4,3 m of flying chamber diameter is the perfect place for training of army parachutes and special troops with their specific equipment. From tourist's point of view, the tunnel offers comfortable space even for flying couples with instructors or other smaller groups. Thanks to a comprehensive fan optimization the, tunnel allows operation of profi-flights as well as fun-flights at very low operation costs. Materials and Dimensions Air conductors in the aboveground part of the tunnel are made of sheet steel. All steel elements are provided with corrosion protection. Tunnel skin is made by sound-insulation panels KINGSPAN. Net dimensions of the tunnel are: width 30 m depth 10 m height 32 m The typical depth of foundation of ground concrete structure is 7,5 m. The typical height of the tunnel above the ground is 24 m. Flight chamber Flight chamber consists of a glass part, which is on its top connected to a steel construction of tunnel shell. Lower part of the flight chamber is purely cylindrical with a diameter of 4,3 m and a height of 5 m. The upper part of a flight chamber is made from steel and its height is 9 m. The shape of this part of flight chamber is gradually changing from a circular diameter of 4,3 meters to circular diameter 4,3 x 4,3 m. The overall maximum height of flight chamber 14 m The height of the glass part of flight chamber 5 m Diameter of flight chamber 4,3 m Maximum speed Maximum air speed at which the tunnel can be operated continuously is 80+ m/s (300+ km/h). Motors, fans and electronic equipment The air stream is formed by four vertically stored fans, each of 3.15 m in diameter, which are powered by a 4 electro-motors, each rated at 355 kW. RPM are controlled and regulated by 4 frequency changers from ABB. Control and monitoring system of the tunnel is realized using SIEMNS technology. Cooling Tunnel cooling is provided by an active cooling unit with a maximum power consumption of 330 kW, which corresponds to a maximum cooling performance of 1 000kW. Cooling compressor unit is located outside the tunnel and two pairs of optimized coolers installed in the tunnel design ensures a comfortable temperature in the flight chamber even during very warm summer period. During cold seasons, from the certain threshold temperature, the compressor unit is automatically switched to dry coolers, which maximize utilization of outside cold air and rapidly decrease the power consumption (up to 30 kW). -------------------- Offered price represents VWT-FFS-3672 /3.6m , double loop technology ,FOB Cz Praha 20x22ft containers
Offer - EN590 10ppm. Country of origin: Kazakhstan. This offer is intended for Mainland Chinese buyers who only have RMB, which can only be used to open DLC and pay for purchases upon presentation of export and shipping documents.We sell only to Asia Government Buyers The price is equivalent to US$500 per metric ton (MT) in CIF China RMB, including US$5.00 per ton closed commission on the sell side and US$5.00 per ton open commission on the buy side. No further increase in commission is allowed. EN590 PROCEDURES. 1) Buyer KYC includes proof of funds and permission for import quotas (especially to China), as well as the possibility of storage in tanks. 2) After checking point 1 above, we will publish the contract and ICPO. 3) We will provide POP upon signing the contract. 4) The buyer delivers the DLC to our designated bank. We issue a 2% fulfillment guarantee upon receipt of DLC. 5) We then deliver the Title Documents and NOA to the Buyer's name. At this stage, the Buyer receives full control over the vessel and can order the delivery of cargo to any port at the Buyer's discretion.
EN590 10 PPM Mediterranean SEA 760 USD/MT+ 104180 MT(VAC) FOB TRANSACTION PROCEDURE : 1. Buyer sends Corporate Profile 2. Seller issues Commercial Invoice (CI) . Buyer signs CI. 3. The Seller releases the FULL POP â?? Load Port i.e Cargo and Shipping Documents 4. Buyer will verify the POP and provide the Buyer Inspection Company + Buyer Local Agents details to the Seller within 24 hrs of receipt of the POP documents. 5. Seller issues the UDTA/MATB and vessel proceeds to Buyer POD. 6. Seller Vessel arrives and tenders NOR to Buyer and Buyer Agents. 7. Buyer Agent + Surveyors will board and complete UDTA within 48hrs of the NOR 8. Within 72 hrs of successful Dip test Inspection report issued , the Buyer will pay for the product and provide valid Q88/CPA OR do a TTO of the Seller Vessel 9. Documentation Completed 10. Transaction Over .
We can now offer 5900+ coal at $109/MT at CFR, N. China ports are as follows on the following payment terms: Part 1: 1%of the Goods value to be paid by means of TT payment within 2 Banking Days after signing the contract and of receipt of the proforma invoice Part 2: 49% of the Goods value to be paid by means of TT payment within 2 Banking Days after of receipt of the FCR (Forwarder's Cargo Receipt) at the port of loading. Part 3: 50% of the Goods value to be paid by means of TT payment within 3 (three) Banking Days of receipt of the scan copies of the following documents, issued in strict compliance with the documentary instructions provided by the Buyer but anyway before the start of the discharge of the vessel: (a) Commercial invoice signed by the Seller in 1 original and 2 copies; (b) Clean on-board Bill of Lading: Full set of 3/3 originals and 3 non-negotiable copies made out to order and blank endorsed, marked "freight payable as per charter party" and notifying to order; (c) E-Certificate of Quality in 2 copies issued by the Surveyor at the Load Port; (d) E-Certificate of Weight in 2 copies issued by the Surveyor at the Load Port; (e) E-Certificate of Origin in 2 copies issued by the Surveyor at the Load Port; (f) E-Draft Survey Certificate in 2 copies issued by the Surveyor at the Load Port; (g) E-Certificate of Cleanliness of Holds in 2 copies issued by the Surveyor at the Load Port. The Shipping Documents: (a) Commercial invoice signed by the Seller in 1 original and 2 copies; (b) Clean on-board Bill of Lading: Full set of 3/3 originals and 3 non-negotiable copies made out to order and blank endorsed, marked "freight payable as per charter party" and notifying to order; (c) E-Certificate of Quality in 2 copies issued by the Surveyor at the Load Port; (d) E-Certificate of Weight in 2 copies issued by the Surveyor at the Load Port; (e) E-Certificate of Origin in 2 copies issued by the Surveyor at the Load Port; (f) E-Draft Survey Certificate in 2 copies issued by the Surveyor at the Load Port; (g) E-Certificate of Cleanliness of Holds in 2 copies issued by the Surveyor at the Load Port. All E-certificates issued by the Surveyor shall be photocopies electronically signed, stamped and color-printed. Copies of the Shipping Documents shall be sent to the Buyer by e-mail within three (3) Business Days after Bill of Lading date.
Net calorific value 5500 + kcal/kg Capacity up to 150,000 tons per month (one PANAMAX ship 75,000 tons) or 40,000 and 60,000 tons each, depending on the port of acceptance. Price based on delivery: -FOB, Nakhodka, Vanino - $ 92-93 from the volume - CFR, Northeast ports of China $103-104; CFR Vietnam and CFR Korea $109-110 Payment terms: LC -MT 700 (LC Draft attached) - FOB disclosure per clause 46A upon submission of all shipping documents
We can offer crude oil in Rotterdam** Minus 8$bbarel BLCO, actual 6-8 million barrels per month. *Oman light Price minus $7 Delivery anywhere in Europe.CIF PROCEDURE 1. Buyer issues Corporate Profile and CIS/KYC 2. Seller and Buyer have a Conference Call to confirm the transaction 3. Seller issues the FCO to the Buyer 4. Buyer issues the ICPO to confirm the Order with a valid Bank Statement ( with cover letter to seller ) 5. Seller issues the following ; a) Commercial Invoice â?? For the First Trial Lift on FOB or CIF Incoterms b) Letter of Confirmation of Product from NNPC â?? Nigeria c) Certificate of Origin d) Specifications Sheet for Grade from NNPC â?? Nigeria e) QnQ Report â?? Fresh SGS f) Sellers Banking Verbiage for the BG / SBLC 6. Buyer will execute the Commercial Invoice and lodge same along with the POP documents at his Bank 7. Buyer will issue bank to bank a BG/SBLC MT760 in favor of the Seller WITHIN 3 DAYS ONLY for 100% of the Cargo Nomination 8. Seller will on successful receipt of the Buyers Payment Guarantee load and dispatch a Loaded VLCC to the Buyers POD WITHIN 10 (TEN) days. 9. Seller Vessel arrives and tenders NOR to the Buyer and Buyer Local Agents at the Disport 10. Onboard Inspection and Inward formalities will be done by Buyer Agent and Inspectors 11. Vessel is taken to berth and discharges the cargo ashore to Buyer Shore Tanks 12. Buyer will pay via MT103/TT within 48hrs of the discharge completed 13. Seller vessel sails out . Transaction Over 14. Buyer and Seller sign and execute the SPA for the Monthly Deliveries and same commences. FOB PROCEDURE 1. Buyer issues Corporate Profile and CIS/KYC 2. Seller and Buyer have a Conference Call to confirm the transaction 3. Seller issues the FCO to the Buyer 4. Buyer issues the ICPO to confirm the Order with valid Bank Statement ( with cover letter ) 5. Seller issues the following ; g) Commercial Invoice â?? For the First Trial Lift on FOB or CIF Incoterms h) Letter of Confirmation of Product NNPC â?? Nigeria i) Specifications Sheet for Grade NNPC â?? Nigeria j) QnQ Report â?? Fresh SGS k) Sellers Banking Verbiage for the BG / SBLC (if contract) l) UDTA6. Buyer will execute the Commercial Invoice and lodge same along with the POP documents at his Bank 7. Buyer will give a Performance Bank Guarantee â?? Cash Backed or Escrow in Buyer Bank to the Seller for the Cargo Nomination Value of USD$10,000,000.00/- (Ten Million USD) 8. On confirmation of the BG â?? Buyer the seller will issue the MATB / UDTA 9. Buyer will DIP TEST on Seller Vessel and then pay for the nomination via a MT103/TT within 48hrs 10. Buyer will then bring his own vessel in the laycan window , load via STS OR TTO Seller Vessel . 11. Transaction Over . 12. Buyer and Seller sign and execute the SPA for the Monthly Deliveries and same commences. Buyer will place SBLC for the Contract .
We are looking for a buyer En 590 10 ppm,quantity 40 000 mt, price FOB MED ITALY -25 USD/MT at Black Sea , FOB delivered.For end September to mid of October. We can also arrange the shipping for the buyer ad additional service.First step LOI.
The request is addressed to real suppliers only. Please, all virtual brokers, stop sending fake offers to sell snow in the summer! The buyer's company is seeking 4 million barrels of OMAN LIGHT BLEND crude oil. Shipping CIF CFR China. Interbank procedure. Payment SBLC\DLC. 2%PB. Discount minus $14 per barrel.
Manuka Honey MGO+100 Its Pure Certified raw Manuka Honey from New Zealand. Minimum consumption 1 barrel. Maximum consumption 10 barrels. Delivery time - IMMEDIATELY. The barrels are already physically in Europe / Czech Republic and you can pick them up or organize shipment /. So you don't have to pay for shipping from New Zealand with the usual waiting time of 10-12 weeks. The current import duty in the EU of 17.3% on honey has already been paid and is already included in the price!
BULK or CONTAINERS
Rubber granules, chips, shredded, baled tires, steel wire.