Why has the steel structure building replaced traditional methods to become the mainstream of modern construction?
Compared with traditional buildings, steel structure buildings have a shorter construction period, are cost-effective, and offer fast construction, eco-friendliness, attractive design, high strength, and excellent seismic performance. All these advantages make steel structure buildings a prominent direction for future development.
You can see the presence of steel structures in various buildings, such as large shopping malls, logistics warehouses, factory workshops, cold storage facilities, livestock farms, schools, hospitals, and residential areas.
What are the advantages of steel structures?
1. Greatly save the construction time, construction is not affected by the seasons
2. Increase residential space usage, and reduce construction waste and pollution.
3. Reusing construction materials can drive growth in new building materials industries.
4. Good seismic performance, easy to remodel, flexible, convenient, and comfortable.
5. High strength, lightweight, safe, and cost-effective.
6. Aligns with sustainability goals: low carbon, green, eco-friendly, and energy-efficient.
Primary Framing
Primary frames are the main load-bearing steel components and can be clear-span rigid frames, continuous beam frames, or post-and-beam frames. They are designed according to the Chinese steel construction manual or any country specific design.
Depending on the building's function, size, and aesthetic requirements, different frame types can be used.
Expert quality control team
Our expert quality inspection team thoroughly checks every part, hole, and weld to ensure durability, stability, and aesthetics. We also welcome third-party inspections, such as those by SGS and BV, and invite customer inspections at any time.
Self-inspection-Worker mutual Inspection-Workshop inspection-Quality inspection department check
Delivery Time
The total production time for one building is approximately 35-40 days, with expedited service available for on-time delivery.