Coal, silica sand, briquette, white tin, zircon sand, palm shells, wood charcoal, wood pellet, palm oil, We are also consultants for investors who need mining land such as coal mines, silica sand, boxside, tin, copper, we have mining data for take over and joint operations.
D grade coal, mm: 0.13
Ash content in dry fuel max., % :9,0
Total moisture in operating condition of fuel, max., % :14.0
Mass fraction of total sulfur in dry fuel, max., % :0.8
Volatile matter yield to dry ash-free state max., % : 42-48
Net calorific value, min., kcal / kg :5,800
The product is a new charcoal type made of recycled wood waste.
There are three main elements in this product which includes:
- Sawdust recycles the wastage of industrial usage of wood.
- Nutshells are an excellent replacement for tree wood and a perfect eco-friendly option.
- Charcoal dust, which recovers an essential raw material, contributes to protecting the environment.
ALL Green Materials!
Echo-friendly
Forests are essential to the health of our environment, which we must protect as much as possible.
Sadly, traditional making charcoal destroys many forests and trees every year.
4500-7500 GCV coal available in large quantities or different sizes from our own mine in Afghanistan. Moreover, large quantities (minimum 50,000 MT) of coal ranging from GCV 3500-6800 available from various other countries such as Indonesia, Colombia, South Africa, Pakistan.
Total moisture as received basis-10,98;Mass fraction of total moisture on analysis/air-dried-0,24;Ash content on dry basis-5,57;Yield of volatile matter on dry ash free basis-45,77;Mass fraction of total sulfur on dry basis-0,35;Net calorific value-6110. Country of origin-Kazakhstan.
Delivery basis- CIF seaport Szczecin.
To proceed with the above subject matter as plan
and scheduling :
1. Buyer sends LOI / ICPO or can directly draft the
official SPA Contract from the LC opening company.
better to complete the identity / passport of the
person in charge
2. Buyer shall approved the Full Corporate Offer (FCO),
signing and endorse.
3. Buyer shall submitted Draft Contract to our Company
within 3 (Three) days after signing and approved the
Full Corporate Offer (FCO).
4. Buyer shall submitted copy of Import Permit
5. SelleR will review DrafT Of Contract from Buyer.
6. Seller and Buyer signing Electronic Draft Contract.
7. Buyer or appointed Independent Surveyor at Buyer
choice will make a schedule of Site Visit to the
(Mine/Stockpile/Jetty) if required.
8. Satisfied with the Visit and Coal Quality, Buyer and
Seller shall sign Hard CopyContract based on
Electronic Contract agreed.
9. Buyer shall issued the Letter of Credit and Seller will
send documents such as Report Of Analysis (ROA) or
Pre Shipment Analysis (PSA) which issued by
Independent Surveyor and Performa Invoice to
Buyer's Bank to get approval for acceptance of Letter
of Credit (LC).
10. After get confirmation from Buyer's Bank that
Documents has been accepted then Seller will
prepare the Coal to be loaded into the Mother Vessel.