* Stabilize shale stratum
* Reduce rotative torque and prevent jamming
* Substitute of oil, including crude oil, waste engine oil and diesel oil
* Depress the solid expansion of drill chips
* Produce thin and tenacious mud cakes.
25Kg net sealed in 4-in-1 compound paper bag with plastic lining.
3889 Bitumen Asphalt Suppliers
Short on time? Let Bitumen Asphalt sellers contact you.
Price for Bitumen is $520 per MT ( C&F India & China )
Terms of Payment - 50% advance & 50% on original BL , IF the buyer wants to open LC it is also acceptable , price will increase by $10.
Bitumen 60/70 in Old Barrels
Description
Bitumen 60-70 is high quality penetration grade asphalt derived from crude petroleum reefing. It is dark in colour and possesses waterproofing and adhesive properties. It is substantially non-volatile and softens gradually when heated.
Uses
Bitumen 60 û 70 is used as a binder of mineral aggregates in asphalt concrete and hot laid plant mix for highways, airports, parking areas, driveways and curbs.
Technical data
Test test method results
Penetration @ 25¦c, 100gm, 5sec. 1/10mm astmd-5 60.0-70.0
Softening point by ring and ball method ¦c astmd-36 (min) 48.0
Ductility @ 25 ¦c cm astmd-113 (min) 100.0
Flash point (Cleveland open cup) ¦c astmd-92 (min) 300.0
Viscosity kinematic @ 135 ¦c cst astmd2170 (min) 350.0
Solubility in trichloroethylene %mass astmd-2042 (min) 99.5
ôThin film oven test. (3.2mm).@163¦c.5hrs: astmd1754
Loss on heating %mass (max) 1.0
Penetration of residue % of original ( min ) 52.0
Ductility of residue (@25 ¦c . 5 cm/min) cm ( min ) 50.0
Available quantity
5000 mt monthly
Backing
Bitumen 60-70 In Old drums.
Time of delivery : 45 days for barrel
Delivery : any port all over the world.
Payment method
* by cash
* Issuance confirmed letter of credit at sight Irrevocable transferable Expiry date will be 3 month from date of issuance the letter of credit place Egypt Docs Required
* Original invoice
* Full set of bill of lading.
* Certificate of Egyptian origin
* Packing list
* Weight list
* SGS or any inspection co..
Instruction
* 100 % payment letter of credit at sight.
* Bill of lading showing not clean on board is acceptable
* Bill of lading showing additional cost is acceptable
* Bill of lading showing name of issuing bank in two fields (consignee and notifying) is acceptable
* Freight forwarder bill of lading is acceptable
* Late presentation or stale docs. Are acceptable
* Presentation period 21 days
* Third part docs. Acceptable
* comm. Of the applicant bank will be paid from the applicant and comm. Of negotiation bank will be paid from the benef..
* Our bank swift code nbegegcx
* Language or spelling mistakes are acceptable.
Penetraction 25 ¦c (100g.5s)0.1mm
80 100
Penetration (AFTER RTFOT )% of original pen
50
Softening Point (Ring and Ball ) ¦c (NEAT)
45 52
Softening Point (R & B) after loss on heating (5hrs 163 ¦c) ¦c
Softening Point (AFTER RTFOT ) ¦c
45
Flashpoint (Cleveland Open Cup ) ¦c
225
Viscosity at 135¦c (VIRGIN ) cst
Viscosity at 135¦c(AFTER RTFOT) cst
CHANGE
300%
Ductility at 25¦c cm
100
Ductility at 25¦c (AFTER rtfot)cm
75
Specific gravity at 25¦c g/cc
1.00 1.05
Thin Film Oven Test (TFOT) (5hrs at 163¦c)%
0.5
Solubility in Trichloroethylene %
99
Loss on heating (5hrs.163¦c) % max.
0.5
Penetration on residue(100g -5s)% of initial Pen Min.
80
Hw-7 is a heat-resistant aging, environmental protection, non-cationic, non-amine, two performances antistripping agent. Solve the antistripping agent prevalent poor heat aging and environmental pollution problems, improving the aging resistance of asphalt, waterproof and antistripping of asphalt. The two performances peculiarity of the product can effectively solve antistripping agent and stone and asphalt compatibility problems, it's a new generation of antistripping agent.
Main characteristics
Novel structure and compact design make it easy to install and transfer
Main parts adopts international famous brand product with credible capability
Lower running cost high aggregate and asphalt weighing accuracy
It can realize auto control, semi-auto control and manual control.
Aggregate supply system adopts modularization structure and frequency conversion timing, making material delivery smooth. Without phenomenon such as block, obstruct and so on.
The heat up area of Dryer drum uses patent technology, which can make full use of heat energy. Dressed heat preservation material to reduce heat loss and have aggregate material drying effectively.
Mine material, dust and asphalt weighing systems which adopt three sensors without disturbing data collection can calculate exactly, steadily, credibly and efficiently.
The dust cleaning system of whole machine are designed on a basis of meeting the discharge request of environment std for sure at the clientsí» request and local environment defense condition.