This bathroom shower caddy rack is designed for organizing your space, especially for 90�°corner. It is ideal for your kitchen or bathroom to hold and organize soap, shampoo, comb, cleaning supplies, etc.
Hotel Use Prefab Modular Bathroom Pod
Bathroom pod is ideal for large-scale building project now, especially hotel, school, healthcare, student accommodation, and some residential building. This type modular bathroom units can be made significantly more efficient and profitable by exact specifications of each client to guarantee complete satisfaction.
The structure of the bathroom pod toilet is light gauge steel framing which is made of cold formed galvanized or galvalume steel material, Z275/AZ150, high strength G550. The vertical structure will be supplied with holes in advance for the passage of electrical cables and hydraulic pipes.
3777 Bathroom Accessories Suppliers
Short on time? Let Bathroom Accessories sellers contact you.
Product Details
Place of Origin: Zhejiang, China
Brand Name:TITA
Model Number: t9311-48w
Style: Modern
Type: Vanity Combo
Vanity: 48"w x 22"d x 33.5"h
Vanity Material: Solid Wood
Mirror: 44"W x 31.5"H
Mirror Type: 5mm Silver Mirror
Counter Top: Cararra White
Countertop Material: Marble
Volume: 0.92cbm
Finishing: Lacquer
Basin Material: Ceramic
Installation Type: Foor Mounted
Include Faucet: No
Basic
1) soft close for door, optional for drawer runner
2) pop up, faucet no included
Options
1) 10 usual vanity color for choosing, customerized color also acceptable
2) 14 kinds of counter top options for choosing
3) hundreds of handle design for choosing, customerized handle acceptable
4) hundreds of faucet and drainer system for choosing.
Supply Ability 10000 piece/pieces per month
Payment
Price: 335-365$ per set( based on fob ningbo and quantity of 40 hq container)
Term:30% t/t in advance + 70% after seeing the copy of bl or l/c at sight
Moq:10pcs/design, 40hq for mixed container
Packaging & delivery
Packaging details:
1) Standard carton packing with 6 sides 2 cm foam
2) Marble top basin with mdf frame outside
3) Mirror separated packing
Port: ningbo or shanghai
Lead time: 40 days after getting deposit