Uk couplers, germany couplers, USA couplers. Bags on pallet
Girder coupler is used in scaffolding / constructions to hold girders with 40nb pipe or cup lock system . Manufactured with best quality row material available in the market in the state of art mfg. Unit by our experienced & dedicated team. These couplers should be used in pairs to bare prescribe load . As per international standerds
We are manufacturers & designers of formwork and falsework for bridges, tunnels, dams & ports, etc. Our specialization : Formwork : launching gantry, segmental girders formwork, psc/ cs girder formwork, pier, pier caps, prestress girders shuttering, anti crash barrier shuttering, trussels, tunnel form work, sky walks, tubular structure for factories, cement godown, warehouse, mushroom plant, etc. We expert in steel girder also. We are backed by in house design team to assist for formwork designing. Having expert team in planning & production. Also inspection department is in separate facility. We are prepared for all types of critical formwork. Shuttering & scaffolding materials : on purchase, rent & hire-purchase also Msf plywood plate : simple and easy-to-use product. Widely use for form-finish. Cuplock system, steel shuttering plate, telescopic steel props, adjustable spans, scaffolding system, pipes, couplers, joint pin, h-frame, cross bracing, etc. We prefer to explore and consider every project with a more proactive approach from the outlet. With legendary reputation for quality, performance, reliability, ease of operation and outstanding value for money. Our products are available through our network and also providing the highest standards of free consultancy & advice, when material purchased from us. Please find the e brochure of our company for your kind consideration. We very much look forward to becoming a part of your team.
Scaffoldings couplers Packing in hdpe bags, 25 each
Scaffolding couplers. 25 Pieces per HDPE Bags.
Scaffolding used for construction.
Ring system scaffold Scaffold accessories Scaffolding prop Coupler Adjustable Jack Steel pipe or tube We can do the different size and color as the buyer requirement. Scaffold is loaded in steel pallet, the size according to the details scaffold size.
• Speed of construction - 4days per floor construction cycle. • Formwork can be re-used over 300 times. • No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight. • Externally, a good quality textured paint applied provides a high quality finish, again no plastering required. • Ceramic tiling can be fixed directly unto the formed concrete finish, again no plastering required to straighten the walls. • No scaffolding required to construct the concrete structure as we provide integrated working platform brackets to We offer a complete redesign service of your formwork into your next project maximizing the number of re-uses.
150 Aluminium Slab Formwork System consists of two parts: Steel props with aluminium prop head, and aluminium frame with plywood. 150 Aluminium slab formwork system is done easy and fast. Comparing with traditional waffle slab formwork adopting main beam and secondary beam, 150 system importantly contributes to time saving. It's easy and fast for erection and dismantlement. Steel prop system consists of adjustable steel props and tripod, or ring lock scaffolding. Steel prop is easy to set up, secure and fast. The common dimension of the slab panel is 1800mm*900mm, 25.92kg in weight, and the max. Thickness of reinforcement concrete slab is 400mm.
Its main features: In line with European standards EN 1004 High-strength aluminum alloy 6005 T5 Riding stick with non-slip stripes Connection using arc welding, strength and reliable Can quickly build (demolition) as aerial work platforms Platform for the distribution of maximal load 2KN/M2 Mobile portable designs, improve project quality, speed up the progress of the project, ensure the safety of construction 1,With EN 1004 approval 2,High-strength aluminum alloy 6005-T5 3,Anti-skid strips on the rung surface 4,Connected by argon arc welding make it strength relianle. 5,Quickly put up(disassenble) altitude working platfome. 6,Maximun equidistribution load of platform is 2KN/mm2. 7,Easy to move & portable design. 8,Safe & portable & efficient Casters: 5 inch rubber casters with brake Overall Weight (KG) 54.34 ~ 117.08 Pedal load (KG) 216 Machine load (KG) 216 ~ 432 QTY (20 feet / PCS) 60 QTY (40 feet / PCS) 122 Pedal size (M) 1.8 ¡Á 0.6 Feet Size (M) 2.5 ¡Á 1.5 Specification 1.8, 3.5.
Type: Gantry, Specifications: 2000, Model: W, Variety: wide straight ladder rack, Working height: 8 (m), Uses: high-altitude maintenance, The whole tower bearing capacity: 900 (kg), Wall thickness: 2.0 (mm), Nominal pipe diameter: 50 (mm), Tube length: 2 (m), Wheel diameter: 25 (mm), Material: aluminum alloy, Scaffolding Category: Scaffolding. The weight of a Aluminum scaffolding is only equivalent to the 1 / 3 of the traditional wood or bamboo scaffolding and 1/5 of Iron scaffolding. The elaborate tower structure without any incidental tools makes the work efficiency 6 times more than ordinary scaffolding. Two workers can install a working platform more than 20m high. Its its structure, security and stability are all the first in among the similiar products. Application: widely used in electricity power industry, aviation industry, House Church tubes, shopping malls, film industry, high-altitude construction, installation decoration industry and the inside and outside maintenance work of trough, cans, tanks, hearth .
Can be used on all types of building construction or for any type of use where an adjustable load bearing member is recurred. The high tensile steel pin is located through a slot in the outer section and a hole on the inner section for coarse adjustment. The cost collar located below the gives fine adjustment for leaving or striking. The roiled thread ensures no loss of material or strength at this critical point. Medium Duty Prop: Code Screw Threaded Tube L/O D/T (mm) Outer Tube L/O D/T (mm) Inner Tube L/O D/T (mm) Height of USE M/n. Max. KIC. 201 220/60.3/3.2 1500/60.3/2.0 1500/48.3/2.0 1750 2650 KIC. 102 220/60.3/3.2 1500/60.3/3.2 1500/60.3/2.0 2000 3150 KIC. 103 220/60.3/3.2 1500/60.3/2.0 2500/48.3/2.0 2500 3650 KIC. 104 220/60.3/3.2 1500/60.3/2.0 3000/48.3/2.0 3000 4150 KIC. 105 220/60.3/3.2 2000/60.3/2.0 3000/48.3/2.0 3000 4650 Heavy Duty Prop: Code Screw Threaded Tube L/O D/T (mm) Outer Tube L/O D/T (mm) Inner Tube L/O D/T (mm) Height of USE (mm) M/n. Max. KIC. 201 220/60.3/3.2 1500/60.3/3.1 1500/48.3/3.1 1750 2650 KIC. 202 220/60.3/3.2 1500/60.3/3.1 2000/48.3/3.1 2000 3150 KIC. 203 220/60.3/3.2 1500/60.3/3.1 2500/48.3/3.1 2500 3650 KIC. 204 220/60.3/3.2 1500/60.3/3.1 3000/48.3/3.1 3000 4150 KIC. 205 220/60.3/3.2 2000/60.3/3.1 3000/48.3/3.1 3000 4650
Kwikstage scaffold standard: 1.Q235,Galvanised 2.500mm-3000mm,3.92kg-19.23kg 3.ISO9001:2008,SGS 4.Main market: Australia,etc. Steel pallet, safe and standard package.
Cuplock standard, cuplock ledger, prop, jacks, shuttering plates, steel planks, coupler etc. Loose or gunny bags, container lot approx. 25.00mt.
Scaffolding that we sell here is the accessories. To Main frame, we do not currently supply. Scaffolding we offer are with JIS & BS1139 standard, which is the Japan International Standard JIS & BS = British Standard. Have in common with standard BS1139 EN74. Our Scaffolding Load Test is accompanied by a certificate which became one of the requirements for oil and gas products can be used in the project. Packed in bundle, Suitable sea transport.
1. Material: Q235/Q345. 2. Surface treatment: painting, hot-dipped galvanizing.etc. 3. OEM service offered. 4. Price term: FOB,CIF,CFR 5. Port of loading: QingDao, China 6. Suppy ablity: 1000000 pieces per month 7. Sample days: 7-10 days 8. Payment: T/T,L/C 9. ISO 9001-2000 approved . fasten by steel strap on pallet.
Aluminium scaffold 2-8m height Easy for installation Both for single and double width Frame ladder and inner ladder are available.
Scaffolding pipe in hot dip galvanized and black Outer diameter 48.3mm/60.3mm or others Thickness 4mm, 3.2mm, 3.0mm or others Lengther: 6m, 21'or others Conform to bs 1387/en39 standard 61 pcs per bundle/ 37 pcs per bundle
04. Pressed double coupler (fixed clamp/fixed coupler), bs 1139 standard / en 74 05. Pressed swivel coupler (swivel clamp/swivel coupler) bs 1139 standard / en 74 06. Pressed putlog coupler, bs 1139 standard / en 74 07. Drop forged fixed girder coupler, bs 1139 standard / en 74 08. Drop forged swivel girder coupler, bs 1139 standard / en 74 09. Sleeve coupler, bs 1139 standard / en 74 10. Base plate, size 150 x 150 mm 11. Metal plank dengan ukuran panjang 2 sampai 4 meter, lebar 25 cm, tinggi 4 cm, tebal 1, 2 mm, ss 280 standard 12. Drop forged double coupler, bs 1139 standard / en 74 13. Drop forged swivel coupler, bs 1139 standard / en 74 14. Inner joint pin 15. Stair thread coupler 16. Putlog head 17. Oyster coupler 18. Board retaining coupler 19. Ladder clamp 20. Roofing coupler 21. Toe end clip 22. Supa tie coupler ii 23. Locking pin 24. Fencing coupler 25. C-clamp fixed coupler 26. C-clamp swivel couple Steel pallets
Steel prop in light duty, middle duty, heavy duty 60.3mm, 56mm outer tube, 1.6mm -4mm thickness 48.3mm inner tube, 2.0-4.0mm thickness Steel pallets, woodern pallets, bundles