Nickel ore Ni 1.6-1.7%, 1.7-1.8% and 1.8% up. We are able to supply nickel ore 1.75-1.8% and up Origin from south east sulawesi We are direct to miner's owner Our delivery term isonly fob mv Our payment term is cash 5-4-1 or lc at sight But we prefer cash payment since our stock at stockpile around 15.000-20.000mt We are open for any serious investor to have a joint operation in mining. Send me your serious loi and we'll proceed Bulk
We are nickel ore supplier from north konawe, southeast sulawesi, indonesia. Please review our soft offer: -ni: 1, 85% rejection 1, 80% fob = 43usd/mtn (not include commission) -ni: 1, 80% rejection 1, 75% fob = 38usd/mtn (not include commission) -payment: l/c -trade term: fob indonesia port -quantity:50, 000mt to 100, 000mt/month -origin: indonesia -loading rate: front to stock file jetty around 3 km, and from jetty to mv: 1-1, 5km -loading port: konawe utara -others content: sio2: 40-45%, fe: 15%max, p: 0, 01%max, s: 0, 02% max, mgo: 20-25% max.
We are nickel ore supplier from north konawe, southeast sulawesi, indonesia. Please review our soft offer: -ni: 1, 85% rejection 1, 80% fob = 43usd/mtn (not include commission) -ni: 1, 80% rejection 1, 75% fob = 38usd/mtn (not include commission) -payment: l/c -trade term: fob indonesia port -quantity:50, 000mt to 100, 000mt/month -origin: indonesia -loading rate: front to stock file jetty around 3 km, and from jetty to mv: 1-1, 5km -loading port: konawe utara -others content: sio2: 40-45%, fe: 15%max, p: 0, 01%max, s: 0, 02% max, mgo: 20-25% max.
Nickel ore.
Nickel ore 1.8-1.7 US$55 by LC US$55. Stable supply, supply up to 100, 000 tones/month. Port Kolaka, Sulawesi Indonesia. 50, 000 mt per vessel.
We are selling nickel ore : 1.Ni 1.8-1.75 2.Ni 1.8-1.7 3.Ni 1.7-1.6 Payment by cash FOB MV 541. / Usance LC Qty: - / + 50rb MT / monthSo if you seriously want to buy nickel ore please send us official LOI and draff contract complete data bank .
Ni content: 1.9 % Reject 1.8 % (below 1.8 % rejection but not include 1.80%) SiO2: 45 % max Fe (ferrum): 18 % max (above 20 % rejection) P: 0.01 % max (above 0.01 % rejection) H2O: 30 % max (above 32 % rejection) Name: Nickel Ore Packing: In bulk Origin: Indonesia Loading Port: Tambea’s Open Sea, One Safe Anchorage, Southeast Sulawesi, Indonesia Stockpile and Barge Jetty: One Safe Anchorage Tambea’s Open Sea, Southeast Sulawesi, Indonesia The approximate coordinates of the Ship’s anchorage point is: Longitude: TBA Latitude: TBA Loading Rate:6,000mt PWWD SHINC.
1. price nickel ore 1.9%:US$80 (cash), 1.8%:US$79 and 1.6-1.7%:US$65 (all item is cash at place) 2. Please send to us your LOI with your price request. 3. delivery system is FOB Vessel or barge 4. Nickel Ore origin from midle sulawesi (pomala'a) of Indoensia. Minimun required (MOQ) is 50.000 MT/month for long contract (mimimum 1 year). We can serve until 150.000MT/month.
NI or,$.060.00,00/m.ton NI land for mining joint operation 007.00,00 Ni or /m.ton. Ni or 55000.m.ton(fecel) Ni land 55000 m.ton (fecel).
Nickel ore from mining south east sulawesi-indonesia. We able supply 60.000 mt/month and long term contract 7 years up. We have area mining of 2.450 hectare specification ni 1.7 up . Bulk in mother vessel.
QUANTITY : Supply Capacity : 100.000 WMT/month Loading Rate : 6.000 WMT/day COMMODITY: Ni Total : 1,95 % min. Fe : 20 % min. Phosphor : 0.01% max. Sulfur : 0.1% max. Moisture : 30% max. PRICE: Base on LME Price - FOB South Konawe District, Southeast Sulawesi Province - Indonesia. PAYMENT: For the fist time to build a mutual trust the Buyer shall arrange Down Payment US$ for securing shipment of 50,000 WMT after Mid of 2011 . The payment shall be made in US Dollars by Telegraphic Transfer (T.T.) Delivery: Loading Port : Torobulu Port, Kendari, South East Sulawesi, Indonesia. Discharging port : ANY PORT IN CHINA
Ni 1.8% and below origin Indonesia, Quantity 6000-50000 MT payment at cash or L/C 100% at sight. Buyer and company user only can have a deal with us not brokers. In bulk.
Up to 100,000 MT / Months Nickel ore with specifications as follows: Parameters Specification Ni 1.8% +óGé¼GÇ£ 2.05% , 1.8% min. Fe 9 - 15% , 18% max. MgO 19 - 23% CaO 0.30% max SiO2 38 +óGé¼GÇ£ 46% P 0.009% max Terms and Condition : 1. FoB Port 2. L/ C 100% 3. Quality Check at discharging por
Laterite nickel ore; manganese lumpy Bulk
We can supply nickel ore ni with quantity 2 x 50.000 mt per month with the following condition. Ni total = 1.85%, reject below ni 1.80% Fe total = 15% maximum Sio2 = 45% max P = 0.03 % maximum Total moisture = 30% max Prices = usd, , , .00/mt, fob any indonesia port or cfr main china port Payment : irrevocable lc at sight (usance 30 days after sight) transferable from international prime bank. Fist shipment = 30 days after received lc Quantity = every month +/-300.000 mt As attache we will sent copy past shipment and picture Raw, 50-100.000 mt, bulk
Nickel ore, Nickel ore 0.9 -1.1 % Iron fe - 50 % min Moisture - 35 % max. 50, 000 - 100 000 mt can be supplied regular basis.
Nickel ores Product: nickel ores from philippine supply Specs:0.9% to 2.2% Quantity:8 million mt a year Terms:lc In bulk
NICKEL ORE 600,000 TONs 1. Quantity: Nickel Ore is readily available, and the approximate quantities are 600,000MT at the mining site, and ready for loading on the tipper lorry transportation to Seaport. 2. Lab Testing Company Report Rate per Metric Ton method: Prior to loading the Nickel Ore on the Vessel, both the Seller and Buyer to Test and Identify the actual percentage of Nickel Ore content through the approved Laboratory Testing Company Report at their own expenses. This Lab Test Report will be the basis, to levy LME rate per Metric Ton-FOB. Every time, the same method will be followed prior to loading Nickel Ore on the vessel. This is to ensure the accuracy of Nickel Ore Content Percentage in each lot, and to follow the proper LME-FOB rate prior to loading of nickel ore on the vessel. 3. 10% discount will be given from the LME â?? FOB rate per Metric Ton to the Purchaser. 4. Stock yard to Sea Port Distance is 25 km from the Nickel Ore stock yard to the sea port name Subic Bay in Philippines. 5. Rate per TON only FOB- Subic Bay Port in Philippines. No CIF rate. The buyer is the one arrange for the suitable vessel for transportation of Nickel Ore at his own responsibility and expenses. 6. Advance Payment to guarantee the Nickel Ore: The buyer need to pay USD300,000/- at the time of signing the agreement with the seller for 600,000MT quantity. This USD300,000/- will be adjusted in instalment basis from the cost of the Nickel Ore shipped each time. 7. Payment Terms: The Seller should pay the amount of the quantity of Nickel Ore loaded on the Vessel, prior to leaving nickel ore cargo from the Subic Bay in Philippines. The same method should be followed on every time shipment.
NICKEL ORE 600,000 TONs 1. Quantity: Nickel Ore is readily available, and the approximate quantities are 600,000MT at the mining site, and ready for loading on the tipper lorry transportation to Seaport. 2. Lab Testing Company Report Rate per Metric Ton method: Prior to loading the Nickel Ore on the Vessel, both the Seller and Buyer to Test and Identify the actual percentage of Nickel Ore content through the approved Laboratory Testing Company Report at their own expenses. This Lab Test Report will be the basis, to levy LME rate per Metric Ton-FOB. Every time, the same method will be followed prior to loading Nickel Ore on the vessel. This is to ensure the accuracy of Nickel Ore Content Percentage in each lot, and to follow the proper LME-FOB rate prior to loading of nickel ore on the vessel. 3. 10% discount will be given from the LME â?? FOB rate per Metric Ton to the Purchaser. 4. Stock yard to Sea Port Distance is 25 km from the Nickel Ore stock yard to the sea port name Subic Bay in Philippines. 5. Rate per TON only FOB- Subic Bay Port in Philippines. No CIF rate. The buyer is the one arrange for the suitable vessel for transportation of Nickel Ore at his own responsibility and expenses. 6. Advance Payment to guarantee the Nickel Ore: The buyer need to pay USD300,000/- at the time of signing the agreement with the seller for 600,000MT quantity. This USD300,000/- will be adjusted in instalment basis from the cost of the Nickel Ore shipped each time. 7. Payment Terms: The Seller should pay the amount of the quantity of Nickel Ore loaded on the Vessel, prior to leaving nickel ore cargo from the Subic Bay in Phillipines. The same method should be followed on every time shipment.
We are direct mandate to Nickel Ore Mine under Philippine Government trading Company , we have below products available to supply from Nickel Ore Mine, the available offer is only for serious and genuine buyers. Our primary objectives are to search for Serious & potential buyers looking to closed deals expediently. We offer a wide range of purity of Nickel Ore that are directly from mine on FOB basis only. Loading port at Port of Davao Oriental and Surigao Del Norte Philippine. We anticipate your feedback with buyer''s (LOI) for our official offer ( SCO) and further proceedings.