105 MW Wartsila HFO Power Plant (7) 15.143 MW Wartsila 18 V 46 Four stroke, Direct Injected, Turbo Charged Heavy Fuel Engines and Generators, Commissioned 2001, 11000 V, 50 HZ, Engines were overhauled and have run between 400 hrs to 9000 hrs. Next overhaul is at 3000 to 11500 hours( depending on the engine) (3) Waste Heat Recovery Boilers:, Cooling system, Lube Oil system, Lubricating Oil System, Control and Monitoring System, Transformers, Electrical System, Pumps, Air System, Exhaust System, Compressed Air System, Tanks and much more. Plant can be purchased as a complete Turnkey Operation on your site if required.
46 MW LM6000 PC Sprint Gas Turbine Power Plant Complete plant with 46 MW LM6000 PC Sprint Gas Turbine, Brush Turbo Generator, 60 MT/HR (HRSG), Fuel: Natural Gas, 17,000 hrs. since overhaul, Year of commissioning 2006, 11.5 KV, 50 HZ, Transformers, electrical systems, control systems, cooling systems, starting system, lubricating system, pumps, fire fighting system and much more. Complete package.
70 MW Wartsila Dual Fuel Power Plant This a complete plant that has Total Power:70840 K, Total Hot Water production :360 ton/h, Total Steam :35 ton/h, (6) six Wartsila Natural Gas and Dual Fuel Generator sets (4) 8730 kW Wartsila 20SV34SG Natural Gas Generator Sets, Year 2006 to 2009, 15000 to 40000 hours (2) 16650 KW Wartsila 50 DF Generator sets (Natural Gas, Light Fuel Oil & Heavy Fuel Oil) Year 2010, 11,000 running hours, 514 rpm, 50 HZ, Siemens Steam Turbine, Boilers, Cooling system, Lubricating Oil System, Control and Monitoring System, Electrical System, Transformers, Pumps, Air System, Exhaust Gas System, Compressed Air System, tanks and etc. The (2) 16650 KW Wartsila 50 DF Generator sets can be purchase separately from the rest of the plant.
60 MW Wartsila Natural Gas Power Plant Consists of (6) 9730 KW Wartsila 20V34SG Natural Gas Engines and AVK Alternators, Fuel: Natural Gas, Year 2010/2011, 11 KV, 50 HZ, low running hours. Complete plant with all auxiliaries. Well maintained by OEM since new with all service records on site.
140 MW Wartsila Natural Gas Power Plant Complete Natural Gas Power Generation Plant in new condition with only 1300 hours of operation, equipment manufactured in 2011/2012. Plant has (13) 9730 KW Wartsila 20V34GS Natural Gas Reciprocating engines with AVK Alternators, Siemens Steam Turbines heat Recovery Boiler, 11 KV, 50 HZ, Fuel Natural Gas, includes all auxiliary equipment. Plant is being sold at a reduced price for quick sale.
95 MW Wartsila Natural Gas Power Plant Consists of (12) Wartsila 20V34SG Natural Gas Engines and ABB Alternators, Fuel: Natural Gas, Year 2005/2009, 11 KV, 50 HZ, Complete plant with all auxiliaries. Well maintained by OEM since new with all service records on site.
80 MW Pratt & Whitney FT8 Combined Cycle Power Plant Two (2) 29 MW Pratt & Whitney FT8-3 Swiftpack single shaft gas turbines with air cooled brush generators, Fuel: Natural Gas (NG), 3000 rpm, 50 HZ, Hours: 16,000 hrs, commission in 2010, (2) Steam turbines, transformers, condensers, electrical systems, control systems, cooling systems compressor systems, starting system, lubricating system, fire fighting system and much more. Complete plant, can be inspected in operation.
200 MW Siemens SGT-800 Gas Turbine Power Plant Three (3) Siemens SGT 800 Gas Turbines, Siemens Steam Turbine, 3000 rpm, 50HZ, Commissioned Year: 2013, Total operating Hours, 21,000, Hours ran after last inspection 2500 hrs. (3) HRSG, RMS station, HV switchyard,, electrical systems, control systems, air systems, cooling systems, compressor systems, pumps, starting system, lubricating system, fire fighting system and much more. Complete plant, can be inspected in operation.
60 MW GE LM6000 PC Gas Turbine Power Plant 50 MW GE LM6000 PC gas turbine, Year of manufacture: 2011, Hours since new: 7000 hrs., 3000 rpm, 50 HZ, 13 MW Siemens SST 300 steam turbine, Year of manufacture: 2012, Hours since new: 5000 hrs, transformers, electrical systems, control systems, air system, cooling system, starting system, lubricating system, air compressors, HV System, MV System, LV System, ABB Pumps, Demi Water Systems, fire fighting system and much more. Complete plant in new condition, can be inspected in operation.
120 MW LM6000 PC Gas Turbine Power Plant 120 MW LM6000 combined cycle power plant consists of ( 2) 47 MW LM6000 PC Gas Turbines, Year 2007, 50 HZ, 11.5KV. HRSG, Steam Turbine, electrical systems, control systems, air system, cooling system, starting system, lubricating system, air compressors, demineralization unit, switch room, transformers, pumps and much more. The LM6000 PC gas turbine power plant is a complete plant that has been well maintained since installation on site. Can be seen in operation.
Power Purchase Agreement (PPA) Power Projects We provide affordable solutions for your energy needs by providing a secure and stable power supply through a Power Purchase Agreement (PPA) contract, where we build, own and operate (BOO) small to medium size power plants and sell the power to your facility at a very competitive rate. Contact us
Joint Venture Agreements (JVA) Power Projects We provide solutions to equipment owners in joint venture agreements by purchasing existing power plants that are operating marginally or at a loss and entering in to a profit sharing arrangement with the power plant owner. Contact us
among non-ferrous and ferrous metallurgy, iron, aluminum, copper, zinc, tin, nickel, tungsten, chromium, burrs and so on metals, use rotary kiln as smelting equipment, sinter, roast and direct return the ore, concentrate and intermediate. For example, during aluminum production, this is used to roast aluminum hydroxide to produce alumina; during iron making this is used to produce pellets for blast furnace.
boiler system, steam turbine system, generator system, dedusting system, and water treatment system. Surplus coal gas is used as fuel, with a small part of lignite, to generate electricity with surplus gas, which saves cost and reduce emissions of carbon monoxide.
Speed Monitor HY-3SFE for thermal power plant professional production and processing. strong technical force, technical experience, good at operating the technical backbone of many, for hundreds of thermal power plants, hydropower stations, metallurgical enterprises overhaul to provide quality equipment selection, construction design, installation commissioning, after-sales service, and provides A lot of accessories and so on. for power plants, steel accessories are as follows: can offer many spare parts for power plants as below: DF-Speed Monitor HY-3SFE-DF transmission speed sensor DF6201-105-118-03-01-01-000 5000 rpm torque sensor ZS-04 lvdt 0-300 ZD-4000TDA plc control cabinets DJZ-06 rpm sensor DF6202-005-050-04-00-01-000 rpm sensor indicator SZCB-01-A2-B1-C3 rtd temperature sensor WZPK2-220 pt100 WZP lvdt position sensor K151.36.06.007 lvdt sensor ZDET-800B sensor de lvdt 4000TDZ-A lvdt working principle ZDET50B RPM Sensor magnetic 143.35.19-2 ANTI-SEEPAGE OIL OUTLET DEVICE Z005.07.01.08 displacement sensor sany 5000TDGN-15-01-01 TC Sensor WREKD2-04 Speed Monitor HY-3SFE displacement sensor sany K156.33.31.04G01 Thermocouple Type-K TE-204 rtd WZPK2-231-G1 LVDT Measurement 5000TD Platinum Wire WRN2-630 LX1=225 76 wire pt100 WZRK-135 5 LVDT TDZ-1G-01 thermal resistance WZPM-231 lvdt position sensor TD7000 thermowell stainless TE-204 lvdt position sensor ZD-3000TDA output shaft speed sensor CS-1-G-075-05-01 Shaft Speed Sensors CS-1-A00-B00-C08-D01 thermocouple wire type k TE-104 FOXBORO Card FBM207 LVDT Measurement LVDT-700-3 lvdt 20mm sensor 10000TDGN RESISTANCE TEMPERAURE DETECTOR WZPM-001 inductive displacement sensor TD6000 dual sensor rtd WZPM-201 �¦4 Bimetallic thermometer WSS-481 0ï½?100â?? �?6�?75 M27�?2 thermocouple k TE-302 Tacho RPM sensor CS-1(D-065-05-1) turbine speed sensor bme tcu SMCB-01-16 temperature transmitter pt100 WZPM2-001(Pt100) Guide Vane Opening DYK-11-5003 pt100 rtd temperature sensor WZPM2-08-78-M18-S high temperature thermocouple TE-403 pt100 rtd WZPM2-08-78-M18-S inductive displacement sensor HTD-300-6 sensor lvdt HL-6-400-15 speed sensor location ZS-02 L=80 angular displacement sensor FRD.WJA2.301H displacement sensor sany B151.36.09G07 sensor pt100 WZPM2-08-040-M18-S displacement inductive sensor TDZ-1-200 Speed Monitor HY-3SFE DFYL-2023-5-17-ZYR
READY STOCK FOR SALE USED COAL POWER PLANT (BOILER +IP , TURBINE +ALTENATOR +COOLING CAPACITY 6 MW , 7,5MW , 15MW , 30MW , 45MW , 60MW , 120MW FREQ. 50Hz /60Hz
NUCLEAR POWER PLANTS SPARE PARTS INDUSTRIAL EQUIPMENT WE ARE DIRECT SELLERS
NUCLEAR POWER PLANTS WE ARE DIRECT SELLERS SPARE PARTS INDUSTRIAL EQUIPMENT INDUSTRIAL SUPPLY FOR NOCLEAR POWER PLANTS AS WELL CIVIL AND MILITAR FOR AIRCRAFTS HELICOPTERS AIRFORCE SHIPS BOATS YATCHS RAILWAY TRAINS GREEN ENERGY MINING INDUSTRY OIL INDUSTRY INDUSTRY ANY KIND
250 MW (ISO) Gas based GMR Barge Power Plant, owned by GMR Energy Limited, is a private-owned power plant located in Kakinada, Andhra Pradesh. It is an environment friendly gas based plant in India�??s first and the World�??s largest combined cycle power plant on a single barge. Plant initially was operated on Naphtha and later changed to on Natural Gas operation. Gas Turbine Generator Mitsubishi Japan, Steam Turbine Generator by ABB Sweeten Generators are 11KV, 50Hz, 2Pole, 300RPM with air-cooled brushless excitation, synchronous type and totally enclosed. Gas Turbine Generator Transformers of 11KV/ 11KV/ 220KV, 120MVA, Steam Turbine Generator transformers 11KV/ 220KV, 70MVA and Unit Auxiliary Transformers 11KV/ 6.6KV, 18MVA installed in Barge. This Barge is classification to International Rules & Standards with a certificate of ABS (American Bureau of Shipping) and having valid Certificate as on date. This barge designed with standard Wind velocity of 160KM/hour and Tidal variation in mooring basin is +2.61Meters to -1.5Meters. Barge is unaffected by landslides and earthquakes.
Barge Power Plant