First, the construction conditions: 1, temperature: the general requirements of the site temperature above 10 degrees Celsius, the season is suitable for construction. 2, humidity: no more than 85%, the current season is suitable for construction. 3, ventilation: the best natural ventilation conditions, in the absence of wind, sand, rain, the outside temperature is not high, try to open the doors and windows for ventilation. 4, lighting: the requirements of indoor lighting, so you must meet the requirements of the construction site of the light. 5, water and electricity: the requirements of the construction site has power, water, in order to ensure the normal use of construction machinery. Two, safety and health site management: 1, the construction personnel must wear masks, gloves, wear your badge to enter the construction site. 2, closed area, wearing a breathing mask, to maintain the flow of fresh air. 3, in the construction process, construction personnel and construction site near the wall of the staff to breathe steam, no skin and eye contact material. 4, storage of materials, raw materials must stored in the shade, shelter, ventilation, away from the heat source of fire, prevent the ignition and or deterioration of the material. Placement of "no smoking" sign. 5, fire control measures: construction personnel shall not smoke, point fire. A fire extinguisher with carbon dioxide must be provided at the construction place. 6, the site protection: the prohibition of cross operation, construction period is strictly prohibited without the construction personnel to enter the site, any personnel to enter the construction site has been applied to the construction site inspection, must take off the shoes to enter the thick. Three, construction quality management: 1, the scene by 2 - 3 site Project Manager has overall responsibility for the construction quality, schedule, scheduling and other items, and the other is equipped with 3 - 5 construction technology supervisor. 2, the quality technology supervisor to follow the construction team, the whole process supervision, supervisor to in a timely manner to the project manager in the construction of occurrence problem, and solve the problem in time. 3, quality inspection: Project Manager and supervisor to strict inspection and check each one step, ensure each procedure are qualified, under the procedures in a timely manner.