For aggregates batching and put aggregates into hoisting hopper of mixer; 1 for mixer, water adding in, concrete discharging; 1 for block making, operating the control cabinet; 4 for moving block&pallets to trollies and bringing them to curing area; 3 for moving cured blocks to blockstorage area, cubing blocks and collecting pallets there; 1 for carrying pallets to block making machine. Comparing with other production lines, this production line needs the lowest equipment investment, with machinery bought from our company, customer can produce blocks and doesnt need to prepare any other equipments. The installation, commission and personnel training needs about 2 weeks. All plc controlling equipments and the mixer, and the 2 handle trollies and 3 wheel trollies will be provided by our company.