Key feature:
1.Jpg
3d • designfe analysis • 3-level review policy • component process roadmap & requirement
• component single piece drawing
13_.Jpg
Process management:
1.Jpg
Welding & machining mpp • welding process flow chart • welding procedure • heat treatment procedure
Assembly procedure • painting procedure • lifting procedure.
Workshop facilities (phase 1):
1.Jpg
Welding workshop
Material preparation workshop
Machining workshop
Assembly workshop
Dimension
205m¡¨¢36m¡¨¢2
156m¡¨¢26m
217m¡¨¢36m¡¨¢2
217m¡¨¢36m
Overhead crane
2¡¨¢150t/16m
75t/16m
2¡¨¢150t/16m
2¡¨¢150t/16m
Main gate
16m¡¨¢12m
12m¡¨¢10m
16m¡¨¢12m
16m¡¨¢12m
Outdoor assembly area
1.Jpg
13.Jpg
Packages & delivery & installation:
1.Jpg
12_.Jpg
Certificates & qualification:
1.Jpg
16.Jpg
Delivery:
1_.Jpg
Seaworthy packaging
Supplier: Bulk material handling system, like ship loader and unloaded, stacker and reclaimed, wagon tippler, truck loading station, color coating line, conveyor belt
The walking type ship loader can be divided into powder ship loader and bulk cargo ship loader. The power ship loader The walking type ship loader only moves in a shuttle on the track when loading and it can move position and arrange materials on the horizontal position of loading ship. The vertical moving uses the manual or electrical winch on the ship. The comprehensive displacement of both can move position in many positions of feed part and arrange materials in the whole range of cabin. Product show 13.Jpg12.Jpg Mobile ship loader has following advantages: Universal application Flexibility Scientific design System integrity High benefit performance of investment Seaworthy packaging
1.Ship unloader, used for transiting coal, cement and clinker aggregate, etc. 2.Type of ship unloader: 1)screw continuous ship unloader 2)bridge type ship unloader 3) chain bucket type ship unloader 4)suspended ship unloader 5)pneumatic ship unloader 3.Project cases Ship unloader.Jpg .Jpg P1000678-1.Jpg We, lmm group, according to the various requirements of customers, advanced international criteria and standards for design, fabrication and inspection are adopted to ensure the varions bulk cargoes unloading work for customers. Seaworthy packaging
Key feature: Packages & delivery & installation: 1.Jpg 16.Jpg After-sales service: Supervision for installation, commissioning & training for operation & maintenance Client¡¡¥s visiting: 1.Jpg 17.Jpg Seaworthy packaging