sinosun twin-shaft concrete mixers are double horizontal axles forced mixers with two advantages of independent performance or forming simple concrete mixing plants with pld series of batching machines.
sinosun twin-shaft concrete mixers adopt involute planetary gear reducer; the gimbals transmission shaft insures circumgyrate at the same speed in-phase of the two mixing shafts.
sinosun twin-shaft concrete mixers adopt hydraulic manual device which can be used for discharging when power lost emergently. The te switch made in french, reliable and durable.
sinosun twin-shaft concrete mixers adopt monitored control system which can monitor the amount and temperature of oil in reduction gear box and discharging pump. Meanwhile, the running mixer can be remotely monitored in the operation room.
Welcome to visit our website for more detailed information on our concrete plants and services!
In container
TECHNICAL DETAILS MRM PL 500/350 MRM PL 1500/1000 MRM PL 2250/1500 Mixer Capacity 500/350 Lt 1500/1000 Lt 2250/1500 Lt Production Capacity 0,35 m³ 1 m³ 1,5 m³ Engine Power 1 * 22 Kw 2 * 30 Kw 2 * 45 Kw Liner Plates Hardox 450 Ni-Hard Hardox 450 Ni-Hard Hardox 450 Ni-Hard Side Liner Plates Hardox 450 Ni-Hard Hardox 450 Ni-Hard Hardox 450 Ni-Hard Water Distributor Included Included Included Security Switch Included Included Included Hydraulic Discharge Door Included Included Included Emergency Stop Included Included Included
Our planetary concrete mixers are manufactured based on german technology. Planetary concrete mixers could apply to produce common commercial concrete and precast concrete. Planetary concrete mixers have solved many problems for its high performance of concrete mixing. In container
Technical Parameters Model JN250 JN330 JN500 JN750 JN1000 JN1500 JN2000 JN2500 JN3000 Charging Volume (L) 375 500 750 1125 1500 2250 3000 3750 4500 Discharging Volume (L) 250 330 500 750 1000 1500 2000 2500 3000 Discharging Capacity(kg) 600 800 1200 1800 2400 3600 4800 6000 7200 Diameter of Mixing Drum (mm) 1300 1540 1900 2192 2496 2796 3100 3400 3400 Mixing Power (kw) 11 15 18.5 30 37 55 75 90 110 Discharging Power (kw) 2.2 2.2 2.2 2.2 3 3 4 4 4 Mixing Blades(nr) 1/2 1/2 1/2 1/3 2/4 2/4 3/6 3/6 3/9 Side Scraper 1 1 1 1 1 1 1 1 1 Discharging Scraper - - - 1 1 1 2 2 2 Weightï¼?kgï¼? 1200 1700 2000 3500 6000 7000 8500 10500 11000 Dimension(L*W*H)mm 1570 *1480 *1750 1862 *1850 *1855 2220 *2071 *1880 2550 *2295 *2195 2893 *2606 *2217 3223 *2906 *2425 3625 *3235 *2630 3893 *3555 *2695 3893 *3555 *2975 Lifting Power(kw) 3 4 4 7.5 11 15 18.5 - -
We can sell 8 m3 10 m3 12 m3 transmixer .We supply spare parts of it. ıt is changing.
Failure phenomenon: batching station concrete trailer pump stone feed pneumatic door stones stuck not open. Analysis: batching station pneumatic door there is a big gap doors and small gap doors, big gap door its clearance greater than normal gravel particle size, so as to avoid the card material. Its small gap door gap is generally in the 5 ~ 10mm, 10mm below the stones card into the gap, it is difficult to pneumatic door jammed. Batching station after a period of use, the aggregate diesel engine concrete mixer spout wear, when the the gap wear to diesel concrete pump supplier 20 ~ 30mm, the card into the larger stones entering the gap in the process of the door, the gravel can easily stuck (wedge force) , pneumatic door can not be opened. Concrete mixing station troubleshooting method. twin shaft concrete mixer process: Check the pneumatic valve clearance and adjust to the appropriate value, can not be adjusted to the appropriate value as a result of excessive wear, you need to add welding steel plate or round bar in the feed opening, the gap reached a reasonable value. Take gray tank top, conveying powder to jar. Failure phenomenon: the bulk cement truck screw conveyer for sale the powder tank pump ashes, cement tank top with powder smoke. Analysis: conveying powder to powder cans transported by compressed air, compressed air, the powder to the powder cans into the air, such as dust removal machine cement mixing machine supplier filter clogging dust mobile concrete batching plant collector filter tank top, compressed air can not discharged generated "pressureout, and when the pressure reaches the safety valve opening pressure of the tank top, the safety valve opens, the diesel concrete pump for sale compressed air and powder through the safety valve is vented to the atmosphere, resulting in the risk ash phenomenon. Another level gauge failure, powder filled continue feeding also appears to take the gray tank top phenomenon. Process: 1, check movable concrete batching plants tank top dust filter and clean-up. 2, Once the take Ash phenomenon appears, you must clean up the safety valve around the powder, avoid powder caking the rain plug the safety valve. 3, as a result of the powder overfilled and take the gray, you must check on the level meter and a the material full alarm device reliability. Belt rainy slip. Fault slip phenomenon: a rainy day, inclined belt with load operation. Analysis: rainy, a moisture in the aggregate, and belt exposed parts easy to wet, damp, especially the inner ring and wet belt to screw conveyor reduce the coefficient of friction between the belt and the drive rollers, so that the drum is passed to the reduction in the belt torsional torch, the torque less than the belt material handling required torque, belt slipping.