1. Environmental protection, beautiful smooth and mirror effect 2. Resistance to weather, acid, alkali, salt, chemical solvents, oil corrosion, especially strong alkali 3. High hardness and elasticity and resistance to abrasion, pressure and impact
Product formation : Be composed of epoxy resin, special mineral fillers, pigments, additives, etc. Product features: .Construction safety and environmental protection and energy saving .Does not belong to flammable items, so it is safety to storage, transportation, construction. No poison to the construction personnel .Excellent physical and mechanical properties, good flexibility, abrasion resistance, scratch resistance, impact resistance, chemical resistance, corrosion resistance, high economic .Cost-effective , it can save painting than that epoxy coating. .Can reduce the construction cost, coating with high strength, small shrinkage Technical data: Color and appearance of paint film colors and smooth film Drying time (25,), hour surface dry, 4h, hard dry, 24h, fully cured 7d Dry film thickness, um 100-120 Adhesion (zoned method), class , 1 Impact strength, kg, cm , 50 Wear resistance (mg1000g/1000r) , 30 Water resistance 72 hrs, no blister, no fall off, no change color Alkali resistance 72 hrs, no blister, no fall off, no change color Acid resistance 72 hrs, no blister, no fall off, no change color Hardness (swing rod method) , 0.5 Solid content , 50% Using: The ground for industrial plants, warehouses, supermarkets, heavy machinery factory, machine repair factory, parking lot, goods piled up area, square etc. Packing: Paint: 20 kg/bucket.
Product formation�? Two component paint of epoxy resin, pigments, fillers, additives and active diluent. Product features: . High adhesion strength with the primary . Seamless, Low hardening shrinkage, no easy to crack . Easy to clean, do not gather dust and bacteria . Environmental protection non-toxic . Wear resistance, can withstand the forklift, carts and other tools�?? long time rolling . Anti permeability, corrosion resistance, Oil resistance and water resistance . Easy to construction and good decoration, the surface is smooth and color bright . Also can be made for static conductive epoxy floor paint Using Mainly used in electronics, electrical appliances, hardware, machinery factory, school, hospital, chemical, pharmaceutical, laboratory, food factory, textile factory, printing factory, chemical plant, computer room, supermarket, parking lot, all kinds of electrical control room, command center And so on the ground has a very high demand for the industry. Packing Paint: 16 kg/bucket Curing agent: 4 kg/bucket
First, the construction conditions: 1, temperature: the general requirements of the site temperature above 10 degrees Celsius, the season is suitable for construction. 2, humidity: no more than 85%, the current season is suitable for construction. 3, ventilation: the best natural ventilation conditions, in the absence of wind, sand, rain, the outside temperature is not high, try to open the doors and windows for ventilation. 4, lighting: the requirements of indoor lighting, so you must meet the requirements of the construction site of the light. 5, water and electricity: the requirements of the construction site has power, water, in order to ensure the normal use of construction machinery. Two, safety and health site management: 1, the construction personnel must wear masks, gloves, wear your badge to enter the construction site. 2, closed area, wearing a breathing mask, to maintain the flow of fresh air. 3, in the construction process, construction personnel and construction site near the wall of the staff to breathe steam, no skin and eye contact material. 4, storage of materials, raw materials must stored in the shade, shelter, ventilation, away from the heat source of fire, prevent the ignition and or deterioration of the material. Placement of "no smoking" sign. 5, fire control measures: construction personnel shall not smoke, point fire. A fire extinguisher with carbon dioxide must be provided at the construction place. 6, the site protection: the prohibition of cross operation, construction period is strictly prohibited without the construction personnel to enter the site, any personnel to enter the construction site has been applied to the construction site inspection, must take off the shoes to enter the thick. Three, construction quality management: 1, the scene by 2 - 3 site Project Manager has overall responsibility for the construction quality, schedule, scheduling and other items, and the other is equipped with 3 - 5 construction technology supervisor. 2, the quality technology supervisor to follow the construction team, the whole process supervision, supervisor to in a timely manner to the project manager in the construction of occurrence problem, and solve the problem in time. 3, quality inspection: Project Manager and supervisor to strict inspection and check each one step, ensure each procedure are qualified, under the procedures in a timely manner.
First, the construction conditions: 1, temperature: the general requirements of the site temperature above 10 degrees Celsius, the season is suitable for construction. 2, humidity: no more than 85%, the current season is suitable for construction. 3, ventilation: the best natural ventilation conditions, in the absence of wind, sand, rain, the outside temperature is not high, try to open the doors and windows for ventilation. 4, lighting: the requirements of indoor lighting, so you must meet the requirements of the construction site of the light. 5, water and electricity: the requirements of the construction site has power, water, in order to ensure the normal use of construction machinery. Two, safety and health site management: 1, the construction personnel must wear masks, gloves, wear your badge to enter the construction site. 2, closed area, wearing a breathing mask, to maintain the flow of fresh air. 3, in the construction process, construction personnel and construction site near the wall of the staff to breathe steam, no skin and eye contact material. 4, storage of materials, raw materials must stored in the shade, shelter, ventilation, away from the heat source of fire, prevent the ignition and or deterioration of the material. Placement of "no smoking" sign. 5, fire control measures: construction personnel shall not smoke, point fire. A fire extinguisher with carbon dioxide must be provided at the construction place. 6, the site protection: the prohibition of cross operation, construction period is strictly prohibited without the construction personnel to enter the site, any personnel to enter the construction site has been applied to the construction site inspection, must take off the shoes to enter the thick. Three, construction quality management: 1, the scene by 2 - 3 site Project Manager has overall responsibility for the construction quality, schedule, scheduling and other items, and the other is equipped with 3 - 5 construction technology supervisor. 2, the quality technology supervisor to follow the construction team, the whole process supervision, supervisor to in a timely manner to the project manager in the construction of occurrence problem, and solve the problem in time. 3, quality inspection: Project Manager and supervisor to strict inspection and check each one step, ensure each procedure are qualified, under the procedures in a timely manner.
Scope of application: 1. Electron, appliance, ironware, machine factory 2. Chemical, medicine factory, lab 3. Food, textile, supermarket, parking lot. Features: Dust-proof, waterproof, mold-proof, chemical resistant, wear-resistant, strong adhesion, smooth and seamless, simple construction, easy to clear and maintain. Construction technology: 1. Waterproof treatment: first floor needs well done waterproof; 2. Basic ground treatment: polish, fix and clean according the basic ground condition; 3. Epoxy primer: use strong Permeability and adhesion epoxy primer roll-coating one time, strengthen surface adhesion; 4. Epoxy putty: construction several times according practical demand, up to smooth without holes, mark of Batch cutter and sand polish; 5. Epoxy topcoat: use epoxy topcoat or slip-resistant topcoat roll-painting two times, when finished the floor is smooth and clean, color average and no hollowing. 25kg/drum.
Supplier: Epoxy floor paint, epoxy 3D floor, polyurethane
Ritver Epoxy Textile Paint