Please click here to check who's online and chat with them.

Concrete Repair Paints

Supplier From India
VERIFIED
Jan-19-23

CONCRETE REPAIR PAINTS
BONDA COAT PVA
BONDA COAT AR
EPOSCREED
SEALER COAT
PROOFCOAT


Recent User Reviews

This user has not received any reviews yet!

Verification Status


 
 
Contact Supplier
Renew

More Items Similiar to: Concrete Repair Paints

Aug-17-16
 
First, the construction conditions:

1, temperature: the general requirements of the site temperature above 10 degrees Celsius, the season is suitable for construction.
2, humidity: no more than 85%, the current season is suitable for construction.
3, ventilation: the best natural ventilation conditions, in the absence of wind, sand, rain, the outside temperature is not high, try to open the doors and windows for ventilation.
4, lighting: the requirements of indoor lighting, so you must meet the requirements of the construction site of the light.
5, water and electricity: the requirements of the construction site has power, water, in order to ensure the normal use of construction machinery.

Two, safety and health site management:

1, the construction personnel must wear masks, gloves, wear your badge to enter the construction site.
2, closed area, wearing a breathing mask, to maintain the flow of fresh air.
3, in the construction process, construction personnel and construction site near the wall of the staff to breathe steam, no skin and eye contact material.
4, storage of materials, raw materials must stored in the shade, shelter, ventilation, away from the heat source of fire, prevent the ignition and or deterioration of the material. Placement of "no smoking" sign.
5, fire control measures: construction personnel shall not smoke, point fire. A fire extinguisher with carbon dioxide must be provided at the construction place.
6, the site protection: the prohibition of cross operation, construction period is strictly prohibited without the construction personnel to enter the site, any personnel to enter the construction site has been applied to the construction site inspection, must take off the shoes to enter the thick.

Three, construction quality management:

1, the scene by 2 - 3 site Project Manager has overall responsibility for the construction quality, schedule, scheduling and other items, and the other is equipped with 3 - 5 construction technology supervisor.
2, the quality technology supervisor to follow the construction team, the whole process supervision, supervisor to in a timely manner to the project manager in the construction of occurrence problem, and solve the problem in time.
3, quality inspection: Project Manager and supervisor to strict inspection and check each one step, ensure each procedure are qualified, under the procedures in a timely manner.
VERIFIED
Jan-19-23

Black Board Paint

$1.00
MOQ: Not Specified
Supplier From Mumbai, Maharashtra, India
 
Black Board Paint Apply On Wood, Metal, Concrete/gypsum Walls And Use As A Black Board For Education Activities
Oct-28-20
Buyer From Imphal, Manipur, India
Feb-26-19
Supplier From Hanoi, Hanoi, Viet Nam
Apr-02-19
Buyer From Beirut, Beirut, Lebanon
Aug-27-20
Supplier From Jinan, China
May-30-23
Buyer From Ahmedabad, Gujarat, India
Mar-04-19
Supplier From Foshan, Guangdong, China
GOLD Member
VERIFIED
Oct-10-24

Epoxy

$2.50
MOQ: 1  Metric Tonnes
Sample Available
 
DATA SHEET FOR EPOXY EPOXY COATING :- INTRODUCTION - EPOXY COATING (HYB) is a two part high solids solvent free epoxy phenolic resin based coating system designed for hard wearing, smooth surface finish for floors, walls and on steel structures. Nonskid surface finish can be achieved on floor, if required. FEATURES: 1) Hard Wearing 2) Non Dusting 3) Excellent Surface Finish 4) Non Smelling 5) Good Aesthetics 6) Highly Chemical Resistant APPLICATION: 1.Stir well before mixing Part A and Part B and mix in the prescribed ratio. 2.Apply one coat of EPOXY primer on the clean and dry surface. 3.EPOXY COATING (HYB) should be applied on the surface by brush or roller within 24 hrs. After application of primer coat it should be allowed to air dry for min. 4 hrs. Preferable in a dust free atmosphere. 4.Apply min. 2 coats with the intercoat interval of 6-8 hrs. PRODUCT SPECIFICATIONS: Application - Brush, Roller Mixing Ratio - As Directed on Packing Port Life - 30 Mins. Drying Time - Touch Dry- 30 Min, Hard Dry 6 Hrs. - Intercoat Interval 6-8 Hrs. Min. - Dry Film Thickness 125-150 Microns/per coat - depending on porosity Covering Capacity - 6-8 sq.met/kg per coat depending on porosity, roughness & method of application. Color Shades - All Standard Shades RECOMMENDED USES: 1) Food & Pharmaceutical 2) Work Shop 3) Clean Room Application 4) Chemical Resistant Coating for Concrete& Steel 5) Petrochemical, Fertilizer plants METHOD OF APPLICATION: SURFACE PREPARATION The long-term durability of the applied Epoxy coating (HYB) epoxy coating is dependent on the adhesion between sub-base and coating material. It is most important therefore, that the substrate surfaces are correctly prepared prior to application. 1.Before application of the Epoxy coating (HYB) surface should be free from loose partials, rust, oils, grease or earlier coatings and should be totally dry. 2.New concrete or cementations surface should be placed at least 28 days and have a moisture content of less than 5% before application of Epoxy coating (HYB) 3.After surface is dry, all repair work like sealing of joints, cracks filling of cavities and crevices should be carried out. HEALTH & SAFETY - Keep the containers tightly closed when not in use. Avoid contact with skin & eyes. It comes in contact with the body, wash affected parts with plenty of water and contact a doctor. Other known sector for Epoxy floor lining, Epoxy garage floor lining, Concrete epoxy lining, Concrete floor epoxy lining, Epoxy pipe lining, Marine epoxy lining, Sub marine epoxy lining, Basement lining epoxy floor shield, Louisiana, Oregon, Chip lining color epoxy floor, Aviation lining epoxy interior.

Verification Status