A two component, general purpose polyamide-based epoxy floor coating giving excellent adhesion to concrete surface. Fully cured paint films are resistant to mild solvents, chemical spillage, abrasion, impact, and water.
MATERIAL: PC natural 100% pure pc without any coating
CATEGORY: PC
TYPE: Natural
SPECIFICATION: Separate 25 kg bag and Mark per month 78 mt 100% pure pc without any coating ,post Industrial materials
Origin: Bangladesh
LOADING WEIGHT: 24 Ton
FOB (USD/Ton): 1450$ - 1700$
Packaging: Jumbo Bag
Est. Shipping Time: 15, 30, 45 days
Our Commitment
We are committed to delivering in accordance with the quality given, source and licensed in the field of scrap transportation.
2Lians always for the purpose of satisfying customers on the criteria of sustainability and fairness through high work efficiency
BARILAC barrier coatings are the most suited sustainable solution to replace polycoated laminated board,
waxcoated, PVDC coated etc all non sustainable alternatives. Barilac barrier coat is recommended for
paper cup, trays, foodtrays, pizza boxes, ice cream cartons etc.
The special product features are.
- Low COBB
- Good oil and grease resistance
- Good Moisture Vapour Transmission rate
- Good heat sealing performance
- Good water resistance
- Low odour
- FDA compliance
High-Quality Waterborne Epoxy Floor Coating
Product Description:
CM-101 Waterborne epoxy is a two-component curing coating at room temperature. Component A is a waterborne epoxy curing agent, and component B is epoxy resin. Product Functions:
ï?? Enclose the ground to improve adhesion and prevent dust emission.
Application Areas:
ï?? Floor painting in the workshop
ï?? Factories
ï?? Supermarket
Advantages of the Product:
ï?? Greater durability and performance.
ï?? More tolerant of petroleum contaminates in a concrete surface, making it ideal for garages and parking structures.
ï?? Glossier finish.
Technical Parameters:
State in container No hard lumps after mixing.
Density, g/ml 1.05
Surface Drying Time,â?¤ 60 mins
Complete Drying Time,â?¤ 7.5 hrs
Adhesion,â?¤ Level 0
Proportion (Weight) Component A: Component B=3:1
Construction Reference:
ï?? Roller Coating is Recommended.
ï?? Before construction, component A and component B should be mixed according to 15:5 (weight ratio).
After fully mixing, the construction should be carried out.
ï?? The construction shall be carried out in the surface temperature above 10â??
ï?? With the use of a coating, the mixed coating should be used up within 30 minutes.
ï?? The second coating should be carried out after the lower layer is completely dried.
The recommended interval is 12 hrs.