We have avilable following ships spareparts for Sale.
Product-Basler electric power supplier Eurotherm process control equipment.
If required then please contact us on
GRES is an intelligent and modular power supply equipment integrating lithium battery and MPCS. According to different application scenarios, lithium battery, bidirectional DC / AC converter, bidirectional DC / DC converter, Static switch and Power management system can be arbitrarily combined to realize grid connected power supply, off grid power supply and off grid uninterrupted power supply power supply, static reactive power compensation, harmonic suppression and other functions. The system can have access to new energy, power grid, diesel generator and to rreasonable configuration, scientific utilization, to provide users with green, environmental protection, noise free, high reliability and high security power services. Safe and reliable High quality li-ion cell for mobile use Laser welding connection with high strength and low impedance Cells is designed with PC holders and reinforce steel structure to guarantee the highest safety of the system in transportation, installation and operation Damping pad design to improve the impact resistance of the system IP54 safe and reliable operation in outdoor environment Serially designed PCS and battery pack eliminates circulating current and improve system reliability. Integrated BMS,DC, AC multi-layer protection, maximum safety performance design Efficient and Convenient Integrated system, standard modular power module and battery module, easy for installation, maintenance and capacity expantion Easy access to PV and diesel generator, intelligent muli-energy management. Fixed on the ground or mounted on vehicle, can be loaded and unloaded by forklift and hoisted by lifting ring Multi systems could be connected in parallel Cost optimization One investment, multiple benefits:Peak shaving, backup power supply, microgrid building,power quality improving and energy storage,etc. Small size, light weight, less space and installation cost Long cycle life, low failure rate, reduce operation and maintenance investment Maximize green energy utilization. Rated output power: 100KW Rated energy: 150KWH
8000w rated power 8500w max power electric start with 12AH battery with wheels and handle OEM available price negotialble
ôsaving saintö power saver, power saverwith the capacity of 10kw 100% legal and govt. Approved, reduced your bill upto 50% ôsaving saintö power monitoring processor technology optimizes the voltage and current demands, thus reducing the active power / kwh and can achieve up to 50% depending on the nature of load and the supply. It also acts as a voltage stabilizer by storing energy for up to 10 seconds and therefore supplies the load with constant voltage during momentary power surges. Power saver enhance/improve and prolong the lifespan of your electrical appliances which is an added money saving benefit. It is very useful for residential purpose. ô10kw power saverö Features ò Stabilize voltage ò For single phase connection - 1 unit, two phase connection - 2 units, three phase connection - 3 units ò Improve power factor and reduce electricity bill upto 50% ò Save energy and reduce electricity wastage ò Environmental friendly ò Obvious result and easy installation ò Prolong the life of electricity appliance ò Useful for residential, commercial as well as industrial sector ò 100% legal and government approved ò One year replacement warranty period Technical specification ò Capacity : 10kw ò Rated frequency : 50-60hz ò Phase : single phase ò Rated voltage : 90v-280v ò Working temperature : -50 to 60 c
100kva electrical power transformer price Ai Power offers three phases, oil immersed, and naturally cooled distribution and power transformers. Our products from 10kva to 20000kva with a maximum voltage 35kv are manufacture under the standard of IEC60076. The windings are made of high-grade electrolytic cooper and are concentrically positioned. Usually copper foil is used for the low voltage windings. Round shaped, enamel insulated wires is used for the high voltage windings.
Custom-made Power Distribution Boards As Per Client Requirements.
Excellent Materials: 1.Oxygen-free copper lines of lower resistivity, which will become smoother and burr-free after series of additional surface treatment, so the load loss of our transformador is lower and the electric performance is better. 2.High-quality silicon-steel plates which are of lower unit loss, and the no-load of the transformadores is lower. 3.High-quality wooden laminating insulation pieces, which wonâ??t split or move even under the influence of short circuit. 4.Thoroughly filtrated transformadores oil containing less water, gas and impurities, which makes our transformador es work better. 5.High-quality rubber sealing material, which can prevent the transformadores form aging. url:http://www.ybtransformer.com
Reference voltage 220v Voltage reference 0.7 u un .2 b -1 Current specifications 10-40a Reference frequency 50hz Grading accuracy ++ level Starting current 0.4% ib Voltage power lines 0.8w Communication transmission distance 5m Environmental conditions -25f¬f+70f¬ Relative humidity -_85% Automatic relay depth Data transmission speed Center frequency Dimensions
Three phase electric power saving devices Features: 1) this device can reach perfect effect to electromotor for oil field and clothing. This device can be applied to all kinds of three-phase electrical equipment Especially some complicated equipment with heavy load 2) usage: try to install it in front of electrical equipment and at the back of Ammeter. As all the engineering products have been installed in the box, It is very convenient to install. After installing, all the indicator lights Turned bright, the device begins to effect on electricity-saving 3) work load: each j.S.D three-phase electronic power saving engineering Contains six sets of three-phase electronic electricity saving devices. Its work Load is 60kw, 380v, 50-60hz, three-phase 4) life span: six to eight years 5) remark: the effect is distinct after a month, the longer time you use it, the More electricity you will save. Consider installing several electricity-saving Engineering jointly if the load is heavy 6) the number of engineering that have to be installed equals to the total Electricity load/60kw 7) we have our own appearance design patents