Ansell MTMT
Price : 16.5 USD FOB Thailand
MOQ :1M boxes X 12 months
Payment: DLC only
SOP
1)NCNDA included Buyer Info, LOI, LOA (if proxy buyer), 2)ICPO from buyer name in SPA, POF via RWA letter from the buyer banker to seller for verification.
3) buyer verifies POF with 2 business days.
4)after verified POF seller issue FCO
5) Buyer signed n return FCO within 24hours
6)seller send Draft SPA to buyer n buyer provide Draft LC
7)buyer, seller checked n agreed the draft SPA n draft LC
8) Seller will provide POP , allocation Letter, delivery schedule upon signing SPA.
9) At the same time Buyer need issues first handed 100% Irrevocable transferable divisible
LC at sight and need to activate within 3days after SPA signed.
10)SGS inspection at buyer's cost and application
11)After SGS, LC negotiated on the invoice value immediately
Ansell MTMT FOB Malaysia $18.5 Buyer's commission $ 0.2 SBLC Payment SOP: 1, NCNDA, ICPO , KYC, DRAFT LC OR SBLC 2,DRAFT SPA ; IMFPA, SPA SIGNED. 3, PAYMENT: SBLC/LC/TT 4, FOB : INSPECTION AND PAY 5, DD: deceiver to Destination port and release SBLC/LC 6, Close deal, Going to next rolling
Ansell MTMT Nitrile Gloves 1. AH from Malaysia 2. Country of Origin : Malaysia 3. Price - 5M * 12months = FOB Malaysia 18.2 - 10M * 12months = FOB Malaysia 18.0 4. Commission : USD$ 0.1
Production, Ready Stock FOB Malaysia or Thailand CIF Word MOQ 1Mx12 MaxOQ 20Mx12 Payment LC SBLC Escrow
Ansell MTMT 300 Allocation of 10M X 12 months Produce by Ansell Factory Malaysia FOB Price $19,25 300 pieces per box We are directly with the allocation holder (seller mandate - partner)! SOP: 1. Buyer sends LOI and POF of 1 month delivery 2. Seller sends Full Offer Cooperation (FCO) to Buyer. Official price and feasibility announced in the FCO. 3. Buyer sign FCO and will send along Passport of LOI Signer, Company License of LOI Signe 4. Seller send Spa, upon spa signed AH will provide allocation letter 5. Seller send Proforma Invoice 6. Imfpa 7. Buyer sends payment Instrument draft to Seller (LC revolving, BG, Sblc, Escrow USA) 8. Seller confirm draft 9. Buyer issues official Instrument 10. Seller first delivery 25 days after received instrument and will complete FOB term with sgs inspection 11. Buyer complete payment
Ansell MTMT 300 Gloves OTG USA 10 M 20 M 30 M 50 M 100 M 1 B 2 B 10 B Ansell MTMT 300 Gloves Production 10 M 20 M 30 M 50 M 100 M 1 B 2 B 10 B
The commission for this price next week may not be available again: $17.50, including 0.50 commission, the higher opening is for the buyer, Make Up is buyer: This stage Please prepare -LOI Payment: SBLC 2 months FOB Malaysia $17.5, 0.5 dollar commission start from your steam. MOQ 5 M x 12 months Maximum 30 M x 12 months -POF -NCNDA STANDARD OPERATING PROCEDURE (SOP) 1.SUBMISSION 1.1 NCNDA (From End Buyer to Seller Mandate) 1.2 LOI 1.3 BCL 1.4 ATV-Funds Verification 1.5 LOA-Buyer Mandate (It is reqiured, if LOI is not issued by End Buyer) 2. FCO 3. ICPO 4. SPA + NCNDA (Seller) 5. PI 6. DRAFT LC/SBLC 7. ALLOCATION LETTER CONFIRMATION (Show via zoom meeting) 8. OFFICIAL LC/SBLC (Irrevocable, Transferable, Divisible and Revolving) 9. IMFPA 10. SGS Inspection (Cost will be charged with Buyer) 11. SGS, Certificate of origin will be supplied together with relevant documentation as SPA 12. LC Release & Goods Deliver "We will proceed further if you can accept our SOP only"
Ansell MTMT 300 Gloves. MOQ - 60 million boxes (1 box=300 gloves). Certificates: FDA, ASTM, EN455, AS/NZ, JIS, GB, ABNT, ISO, TISI
Ansell Edge $ 15.30process (inclusive0.30 for buyer party SOP For Ansell edge Price $15.30 - 0.30 buyer team 70% our team 30% -Buyer to provide Loi, NCNDA, ICPO if intermediate company involved, POF if required Within 1day -Seller will provide FCO -Buyer to give FCO Counter sign and provide ICPO Within a day *After signing SPA-Seller can show authorisation letter* (As requested to seller) in Zoom meeting Spa signed by both party Seller to provide PI Same day of PI Shared -*LC TRANSFERABLE, IRREVOCABLE, DIVISIBLE and REVOLVING at site* Within 3 days -LC needs to be open within 3 days Within 5 to 7 working days after verification of LC Allocation letter for complete order from manufacturer, along with required documents, Schedule of the deliver is provided with quantity -Material SGS to be intimated prior to buyer -At buyer cost SGS for material done at the FOB Port Klang -After SGS LC cleared on the invoice value immediately If seller or buyer FAILS to proceed the deal after signing SPA and opening of LC 2% penalty will be applied.
Ansell Edge $ 15.30process (inclusive0.30 for buyer party SOP For Ansell edge Price $15.30 inclusive $0.3 Commission -Buyer to provide Loi, NCNDA, ICPO if intermediate company involved, POF if required Within 1day -Seller will provide FCO -Buyer to give FCO Counter sign and provide ICPO Within a day *After signing SPA-Seller can show authorisation letter* (As requested to seller) in Zoom meeting Spa signed by both party Seller to provide PI Same day of PI Shared -*LC TRANSFERABLE, IRREVOCABLE, DIVISIBLE and REVOLVING at site* Within 3 days -LC needs to be open within 3 days Within 5 to 7 working days after verification of LC Allocation letter for complete order from manufacturer, along with required documents, Schedule of the deliver is provided with quantity -Material SGS to be intimated prior to buyer -At buyer cost SGS for material done at the FOB Port Klang -After SGS LC cleared on the invoice value immediately If seller or buyer FAILS to proceed the deal after signing SPA and opening of LC 2% penalty will be applied.