We are supplier of Reinforcement Bars. can supply REBARS as per below: -Size: 6mm to 50 mm -Length: 6 meters up to 16 meters -Packing: Once folded bundles available. hese corrugated steel bars are used as tension devices in the construction of concrete slabs and walls, as well as decorative/ornamental grille work. When used in concrete constructions, these help to strengthen and hold concrete when it is compressed, and come in a wide variety of sizes to fit various building construction needs. At ARC. AVAILABLE IN 3/8 (10mm), 5/8 (16mm), (20mm), (12mm), 1 (25mm) and 1 (32mm)
We deals Galvanized Steel Pipes used for Agriculture and Irrigations, Water Pipeline, Road Barriers. In addition to round pipes, we can also supply galvanized pipes in square and rectangular sections.Hot Dip Galvanized pipes in sizes from 1/2" To 6 OD and in wall thickness ranging from 1MM to 6MM. Our company is specializing in the galvanized pipes, welded pipes and other pipes. Surface hot dipped galvanized, Pre-gavanized, electro galvanized, painted, threaded, beveled, grooved, engraved Usage Scaffolding pipe, Structure pipe, Fence/Door pipe, Furniture, Lowpressure fluid pipe for water oil or gas, Boiler pipe.
Innovative technology of pre-materials suitable for gas springs welded and drawn according to ASTM A213 various ID tolerance requirement of H8, H9, H10 and H11 surface roughness below 15RA (0.40 �¼m) mechanical properties are controlled to endure excessive stress hardness, tensile strength, yield strength and elongation servicing high precision pneumatic cylinder applications ODï¼?mm) ID(mm) WT(mm) ID Tolerances,+0/-0.05) Specifications Materials Surface Finish(max) 15.0 13.0 1.0 CGS-031,H9 A213 SAE1010/#10; SEA1020/#20 ;Q235; 304L;316L ID < 20 RA
Product Name Hot dipped galvanized round steel pipe/gi pipe pre galvanized steel pipe galvanised tube Material carbon steel Color silver Standard GB/T3091-2001 , BS 1387-1985 , DIN EN10025 , EN10219 , JIS G3444:2004 , ASTM A53 SCH40/80/STD , BS- EN10255-2004 Grade Q195/Q215/Q235/Q345/S235JR/GR.B-D/STK500 Brade MJ Thread
High Precision Steel Pipe for Gas spring Cylinder Type:Seamless and Welded Steel Tube Roughness 0.1-0.8ra Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020 Surface:Black/bright Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101 Size :OD 3mm-140mm Thickness 0.5-20mm Processing :Cold rolled /cold drawn 1. BK (+C) No heat treatment after last cold forming process. 2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing) 3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed. 4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere. 5. NBK (+N) After the final cold forming process the tubes are annealed above the upper Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request. Usage: Gas Spring Cylinder
High Precision Steel Pipe for Gas spring Cylinder Type:Seamless and Welded Steel Tube Roughness 0.1-0.8ra Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020 Surface:Black/bright Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101 Size :OD 3mm-140mm Thickness 0.5-20mm Processing :Cold rolled /cold drawn 1. BK (+C) No heat treatment after last cold forming process. 2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing) 3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed. 4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere. 5. NBK (+N) After the final cold forming process the tubes are annealed above the upper Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request. Usage: Gas Spring Cylinder
High Precision Steel Pipe for Gas spring Cylinder Type:Seamless and Welded Steel Tube Roughness 0.1-0.8ra Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020 Surface:Black/bright Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101 Size :OD 3mm-140mm Thickness 0.5-20mm Processing :Cold rolled /cold drawn 1. BK (+C) No heat treatment after last cold forming process. 2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing) 3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed. 4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere. 5. NBK (+N) After the final cold forming process the tubes are annealed above the upper Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request. Usage: Gas Spring Cylinder
High Precision Steel Pipe for Gas spring Cylinder Type:Seamless and Welded Steel Tube Roughness 0.1-0.8ra Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020 Surface:Black/bright Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101 Size :OD 3mm-140mm Thickness 0.5-20mm Processing :Cold rolled /cold drawn 1. BK (+C) No heat treatment after last cold forming process. 2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing) 3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed. 4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere. 5. NBK (+N) After the final cold forming process the tubes are annealed above the upper Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request. Usage: Gas Spring Cylinder
High Precision Steel Pipe for Gas spring Cylinder Type:Seamless and Welded Steel Tube Roughness 0.1-0.8ra Material E195-E235,Q195-Q235,#10,#20,#45,SAE1010,SAE1020 Surface:Black/bright Standard:DIN, GB, JIS, DIN 17175, DIN 2391, GB 5310-1995, GB/T 13793-1992, GB/T 3094-2000, GB/T 8163-1999, JIS G3101 Size :OD 3mm-140mm Thickness 0.5-20mm Processing :Cold rolled /cold drawn 1. BK (+C) No heat treatment after last cold forming process. 2. BKW (+LC) After last heat treatment there is a light finishing pass (cold drawing) 3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed. 4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled atmosphere. 5. NBK (+N) After the final cold forming process the tubes are annealed above the upper Woven bag / wooden or crate carton/ Bundle Packing/ Plain end or vanished as per customer's request. Usage: Gas Spring Cylinder